Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in...Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel.展开更多
An increasing number of tunnels are being constructed with tunnel-boring machines (TBMs) due to the increased efficiency and shorter completion time resulting from their use. However, when a TBM encoun- ters adverse...An increasing number of tunnels are being constructed with tunnel-boring machines (TBMs) due to the increased efficiency and shorter completion time resulting from their use. However, when a TBM encoun- ters adverse geological conditions in the course of tunnel construction (e.g., karst caves, faults, or frac- tured zones), disasters such as water and mud inrush, collapse, or machine blockage may result, and may severely imperil construction safety. Therefore, the advance detection of adverse geology and water-bearing conditions in front of the tunnel face is of great importance. This paper uses the TBM tun- neling of the water conveyance project from Songhua River as a case study in order to propose a compre- hensive forward geological prospecting technical system that is suitable for TBM tunnel construction under complicated geological conditions. By combining geological analysis with forward geological prospecting using a three-dimensional (3D) induced polarization method and a 3D seismic method, a comprehensive forward geological prospecting technical system can accurately forecast water inrush geo-hazards or faults in front of the TBM tunnel face. In this way, disasters such as water and mud inrush, collapse, or machine blockage can be avoided. This prospecting technical system also has reference value for carrying out the forward prospecting of adverse geology for potential TBM tunneling and for ensuring that a TBM can work efficiently.展开更多
To achieve the loading of the stress path of hard rock,the spherical discrete element model(DEM)and the new flexible membrane technology were utilized to realize the transient loading of three principal stresses with ...To achieve the loading of the stress path of hard rock,the spherical discrete element model(DEM)and the new flexible membrane technology were utilized to realize the transient loading of three principal stresses with arbitrary magnitudes and orientations.Furthermore,based on the deep tunnel of China Jinping Underground Laboratory II(CJPL-II),the deformation and fracture evolution characteristics of deep hard rock induced by excavation stress path were analyzed,and the mechanisms of transient loading-unloading and stress rotation-induced fractures were revealed from a mesoscopic perspective.The results indicated that the stressestrain curve exhibits different trends and degrees of sudden changes when subjected to transient changes in principal stress,accompanied by sudden changes in strain rate.Stress rotation induces spatially directional deformation,resulting in fractures of different degrees and orientations,and increasing the degree of deformation anisotropy.The correlation between the degree of induced fracture and the unloading magnitude of minimum principal stress,as well as its initial level is significant and positive.The process of mechanical response during transient unloading exhibits clear nonlinearity and directivity.After transient unloading,both the minimum principal stress and minimum principal strain rate decrease sharply and then tend to stabilize.This occurs from the edge to the interior and from the direction of the minimum principal stress to the direction of the maximum principal stress on theε1-ε3 plane.Transient unloading will induce a tensile stress wave.The ability to induce fractures due to changes in principal stress magnitude,orientation and rotation paths gradually increases.The analysis indicates a positive correlation between the abrupt change amplitude of strain rate and the maximum unloading magnitude,which is determined by the magnitude and rotation of principal stress.A high tensile strain rate is more likely to induce fractures under low minimum principal stress.展开更多
为研究三模式掘进机使用TBM模式在全断面岩层中的施工技术,以广州地铁7号线二期萝岗站—水西站盾构区间工程为研究背景,分别从出渣方式、掘进参数控制、刀具管理和稳定器应用4个方面对三模式掘进机TBM模式施工技术进行总结。结果表明:1...为研究三模式掘进机使用TBM模式在全断面岩层中的施工技术,以广州地铁7号线二期萝岗站—水西站盾构区间工程为研究背景,分别从出渣方式、掘进参数控制、刀具管理和稳定器应用4个方面对三模式掘进机TBM模式施工技术进行总结。结果表明:1)本工程中三模式掘进机使用镶齿滚刀施工,相对光面滚刀的消耗更少,刀盘转矩更低;2)三模式掘进机TBM模式采用泥浆循环和螺旋输送机双通道出渣,可显著降低泥浆管堵塞的概率,提高出渣效率;3)三模式掘进机在前盾、中盾安装稳定器和撑靴,可保证全断面硬岩地层中掘进盾体不发生滚动,同时增强盾体稳定性;4)在全断面岩层中采用三模式掘进机TBM模式开挖隧道,刀盘转速为3.0 r/min,总推力约15000 k N,转矩可控制在1300 k N·m,推进速度为8~12 mm/min。展开更多
基金National Natural Science Foundation of China (Grant No.52178393)the Science and Technology Innovation Team of Shaanxi Innovation Capability Support Plan (Grant No.2020TD005)Science and Technology Innovation Project of China Railway Construction Bridge Engineering Bureau Group Co.,Ltd.(Grant No.DQJ-2020-B07)。
文摘Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel.
文摘An increasing number of tunnels are being constructed with tunnel-boring machines (TBMs) due to the increased efficiency and shorter completion time resulting from their use. However, when a TBM encoun- ters adverse geological conditions in the course of tunnel construction (e.g., karst caves, faults, or frac- tured zones), disasters such as water and mud inrush, collapse, or machine blockage may result, and may severely imperil construction safety. Therefore, the advance detection of adverse geology and water-bearing conditions in front of the tunnel face is of great importance. This paper uses the TBM tun- neling of the water conveyance project from Songhua River as a case study in order to propose a compre- hensive forward geological prospecting technical system that is suitable for TBM tunnel construction under complicated geological conditions. By combining geological analysis with forward geological prospecting using a three-dimensional (3D) induced polarization method and a 3D seismic method, a comprehensive forward geological prospecting technical system can accurately forecast water inrush geo-hazards or faults in front of the TBM tunnel face. In this way, disasters such as water and mud inrush, collapse, or machine blockage can be avoided. This prospecting technical system also has reference value for carrying out the forward prospecting of adverse geology for potential TBM tunneling and for ensuring that a TBM can work efficiently.
基金the financial support from the National Natural Science Foundation of China(Grant No.51839003)Liaoning Revitalization Talents Program(Grant No.XLYCYSZX 1902)Hubei Key Laboratory for Efficient Utilization and Agglomeration of Metallurgic Mineral Resources(Grant No.2023zy002).
文摘To achieve the loading of the stress path of hard rock,the spherical discrete element model(DEM)and the new flexible membrane technology were utilized to realize the transient loading of three principal stresses with arbitrary magnitudes and orientations.Furthermore,based on the deep tunnel of China Jinping Underground Laboratory II(CJPL-II),the deformation and fracture evolution characteristics of deep hard rock induced by excavation stress path were analyzed,and the mechanisms of transient loading-unloading and stress rotation-induced fractures were revealed from a mesoscopic perspective.The results indicated that the stressestrain curve exhibits different trends and degrees of sudden changes when subjected to transient changes in principal stress,accompanied by sudden changes in strain rate.Stress rotation induces spatially directional deformation,resulting in fractures of different degrees and orientations,and increasing the degree of deformation anisotropy.The correlation between the degree of induced fracture and the unloading magnitude of minimum principal stress,as well as its initial level is significant and positive.The process of mechanical response during transient unloading exhibits clear nonlinearity and directivity.After transient unloading,both the minimum principal stress and minimum principal strain rate decrease sharply and then tend to stabilize.This occurs from the edge to the interior and from the direction of the minimum principal stress to the direction of the maximum principal stress on theε1-ε3 plane.Transient unloading will induce a tensile stress wave.The ability to induce fractures due to changes in principal stress magnitude,orientation and rotation paths gradually increases.The analysis indicates a positive correlation between the abrupt change amplitude of strain rate and the maximum unloading magnitude,which is determined by the magnitude and rotation of principal stress.A high tensile strain rate is more likely to induce fractures under low minimum principal stress.
文摘为研究三模式掘进机使用TBM模式在全断面岩层中的施工技术,以广州地铁7号线二期萝岗站—水西站盾构区间工程为研究背景,分别从出渣方式、掘进参数控制、刀具管理和稳定器应用4个方面对三模式掘进机TBM模式施工技术进行总结。结果表明:1)本工程中三模式掘进机使用镶齿滚刀施工,相对光面滚刀的消耗更少,刀盘转矩更低;2)三模式掘进机TBM模式采用泥浆循环和螺旋输送机双通道出渣,可显著降低泥浆管堵塞的概率,提高出渣效率;3)三模式掘进机在前盾、中盾安装稳定器和撑靴,可保证全断面硬岩地层中掘进盾体不发生滚动,同时增强盾体稳定性;4)在全断面岩层中采用三模式掘进机TBM模式开挖隧道,刀盘转速为3.0 r/min,总推力约15000 k N,转矩可控制在1300 k N·m,推进速度为8~12 mm/min。