期刊文献+
共找到1,379篇文章
< 1 2 69 >
每页显示 20 50 100
Application of BIM in Architectural Design,Project Construction,and Project Management
1
作者 Yujie Li 《Journal of World Architecture》 2022年第3期1-6,共6页
The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced tech... The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced technical means into architectural design,project construction,and management,so as to ensure the quality and safety of construction to the maximum extent.The application of BIM not only improves the efficiency of construction and construction quality,but also realizes the control of construction cost.This study explores and analyzes the advantages of BIM as well as proposes application strategies of BIM in architectural design,project construction,and management,hoping to contribute to the smooth construction of construction engineering. 展开更多
关键词 BIM Architectural design Project construction Project management
下载PDF
Dynamic Design and Construction of Highway Cut Slopes in Huangshan Area, China
2
作者 JU Nengpan ZHAO Jianjun +1 位作者 HUANG Runqiu DUAN Haipeng 《Journal of Mountain Science》 SCIE CSCD 2011年第2期154-165,共12页
Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined... Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved. 展开更多
关键词 Highway cut slopes Dynamic design and construction Excavation Permit management System Slope stability
下载PDF
Design influence for the success of construction projects
3
作者 LIANG De Xiang CHEN Yu 《International Journal of Technology Management》 2014年第9期136-139,共4页
In this thesis, the design in construction management is defined as the design meets the requirements of the constructor. There are a range of definitions of design, but in this paper "design" refers to something, w... In this thesis, the design in construction management is defined as the design meets the requirements of the constructor. There are a range of definitions of design, but in this paper "design" refers to something, which has been planned and made and a pattern for decorating in something in the term of construction. Rumane says (2010)the design involves two processes. The first thing is analyzing and designing components and structure on the basis of recognized codes and standards of safety. The other is that designers conduct the information in the form 展开更多
关键词 construction management FACILITY a range of definitions of design building construction
下载PDF
Integration of Radio-Frequency Identification and 4D CAD in Construction Management 被引量:1
4
作者 胡文发 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期151-157,共7页
In order to increase the productivity of construction industry, emerging technologies have been constantly introduced and applied in this traditional industry by pilot researchers. This paper provides an integrated mo... In order to increase the productivity of construction industry, emerging technologies have been constantly introduced and applied in this traditional industry by pilot researchers. This paper provides an integrated model of radio-frequency identification (RFID) and four-dimensional Computer-Aided Design (4D CAD) in construction management. RFID involves the use of tags that collect data and transmit data. RFID can collect data by radio waves instead of light waves. RFID technology is surpassing barcode technology where light waves are easily blocked and barcode labels are easy to fall off or become unreadable due to dust, dirt, or other contaminants. 4D CAD which involves 3D construction models and construction schedules presents visualized construction process. Integration of RFID and 4D CAD in this paper built a dynamic construction management and control system which would reduce the time of capturing data on site and control quality of construction materials efficiently. Pilot test result shows that a construction manager can easily understand how and what a complicated construction project will be accomplished. Although further analysis is necessary, RFID and 4D CAD show promises of being a beneficial technology in construction management. 展开更多
关键词 radio frequency identification (RFID) four-dimensional computer-aided design (4D CAD) construction management construction visualization construction schedule
原文传递
Risk Assessment at the Design Phase of Construction Projects in Ghana
5
作者 Maurice Azochiman Awuni 《Journal of Building Construction and Planning Research》 2019年第2期39-58,共20页
The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected ou... The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected out of a population of one hundred and eighty six (186) from three main professional associations in Ghana made up of the Ghana Institute of Architects, Ghana Institution of Engineers and the Ghana Institution of Surveyors (Quantity Surveying Division) practicing in Ghana for the study. Both primary and secondary data were collected. A descriptive survey was also used to observe and describe the presence, frequency or absence of characteristics of a phenomenon as it naturally occurred, in order to gain additional information. A questionnaire was also designed to collect data from the architects, engineers and quantity surveyors. The data was analyzed using Statistical Package for the Social Scientists (SPSS) 17.0. Descriptive and inferential statistics, such as frequency tables, percentages and cross tabulations were used in the data analysis and summaries. Simple tests of associations were undertaken by using Chi square and Cramer’s V statistics to compare relationships between variables. Again, relative importance index was also used to analyze some of the data by computing to deduce their rankings. The relative importance index was used to analyze some of the data by computing to deduce their rankings. The research revealed that majority of consultants had an average knowledge of risk management. Based on the findings it was recommended that consultants undergo advanced training in risk assessment. It was therefore suggested that consultancy firms should develop a set of laid down procedures for consultants to use in risk assessment in order that the use of intuition employed by majority is lessened. The challenges observed in risk assessment and the remedial steps suggested curtailing the detrimental effects of risks would be of wide importance to many developing economies. 展开更多
关键词 construction INDUSTRY PROJECT RISK management Assessment design PHASE
下载PDF
The Contributions of Building Information Modelling to Sustainable Construction
6
作者 Sahar Soltani 《World Journal of Engineering and Technology》 2016年第2期193-199,共7页
Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construc... Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construction sustainability tools, methods and techniques, a greener design can be applied during various building phases. In this connection, it is argued that the analytical and integrated models applied by Building Information Modelling (BIM) may also facilitate this process to be performed more efficiently. BIM and construction sustainability are quite different initiatives, but both have received much attention in recent years in the architecture, engineering and construction (AEC) industry. A rigorous analysis of the interactions between them implies that a synergy exists which, if properly it is understood that can be helpful to reduce the environmental impacts of the AEC industry. A BIM-based design model can contribute to sustainability through its three main dimensions which are environmental, economic and social. In this paper, by reviewing the existing literature on BIM and construction sustainability and using a matrix to analyze construction sustainability dimensions and BIM functionalities a number of interactions have been discussed. It can be concluded that despite there are many improvements in implementation of BIM in environmental and economic aspects of sustainability, its potential impact on social dimension has not been explicitly explored hence further studies need to be undertaken in this area. 展开更多
关键词 Sustainable construction Building Information Modelling BIM design for Quality Project management
下载PDF
A Comparative Analysis of Visualization Methods in Architecture:Employing Virtual Reality to Support the Decision-Making Process in the Architecture,Engineering,and Construction Industry
7
作者 Ahmed Redha Gheraba Debajyoti Pati +4 位作者 Clifford B.Fedler Marcelo Schmidt Michael S.Molina Ali Nejat Muge Mukaddes Darwish 《Journal of Civil Engineering and Architecture》 2023年第2期73-89,共17页
The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most cr... The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most critical design and budgetary decisions-shaping the essential traits of the project,hence emerge the need and necessity to create and integrate mechanisms to support the decision-making process.Design decisions should not be based on assumptions,past experiences,or imagination.An example of the numerous problems that are a result of uninformed design decisions is“change orders”,known as the deviation from the original scope of work,which leads to an increase of the overall cost,and changes to the construction schedule of the project.The long-term aim of this inquiry is to understand the user’s behavior,and establish evidence-based control measures,which are actions and processes that can be implemented in practice to decrease the volume and frequency of the occurrence of change orders.The current study developed a foundation for further examination by proposing potential control measures,and testing their efficiency,such as integrating Virtual Reality(VR).The specific aim was to examine the effect of different visualization methods(i.e.,VR vs.construction drawings)on,(1)how well the subjects understand the information presented about the future/planned environment;(2)the subjects’perceived confidence in what the future environment will look like;(3)the likelihood of changing the built environment;(4)design review time;and(5)accuracy in reviewing and understanding the design. 展开更多
关键词 Virtual reality construction change orders architectural visualization decision making process construction management construction technology interior environmental design
下载PDF
Causes,Effects,and Control Measures of Construction Change Orders in the U.S.
8
作者 Ahmed Redha Gheraba Clifford B.Fedler +4 位作者 Debajyoti Pati Marcelo Schmidt Mukaddes Darwish Ali Nejat Bill Wade 《Journal of Civil Engineering and Architecture》 2023年第2期57-72,共16页
Change orders have a significant impact on many aspects of construction projects.They are known to be the primary cause of litigation in the construction industry.Change orders are almost inevitable due to the uniquen... Change orders have a significant impact on many aspects of construction projects.They are known to be the primary cause of litigation in the construction industry.Change orders are almost inevitable due to the uniqueness of each project from many perspectives,such as the type of building,complexity of the design,human factors,and the available resources.Change orders are the formal mechanism to implement design changes during the execution phase.These changes are usually the outcome of lack of visualization by the owner,misunderstanding,miscommunication between different parties involved in the project,shortage in resources,and other factors.This research aims to investigate and rank causes,effects,and control measures of change orders in the construction industry in the U.S.This research presents the results of a questionnaire surveying owners,contractors,and consultants.A total of 123 industry professionals in the Architecture,Engineering,and Construction(AEC)field,with either significant or final decision-making authority on reviewing,issuing,and approving change orders responded to the survey.Results indicated that owners are the primary source followed by consultants and contractors,respectively.Some of the more important control measures identified in this research are collaboration and visualization technologies. 展开更多
关键词 construction change orders architectural visualization decision making process construction management construction technology BIM interior environmental design virtual reality
下载PDF
Construction Management Utilizing 4D CAD and Operations Simulation Methodologies 被引量:2
9
作者 张建平 张洋 +1 位作者 胡振中 鹿明 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期241-247,共7页
The paper presents applications of simplified discrete-event simulation (SDESA), and 4D-GCPSU, to the National Stadium of the Beijing 2008 Olympics. Taking into account influential factors, e.g., resource, spatial con... The paper presents applications of simplified discrete-event simulation (SDESA), and 4D-GCPSU, to the National Stadium of the Beijing 2008 Olympics. Taking into account influential factors, e.g., resource, spatial condition, and the randomness of the construction process, the installation process of the steel-structure was simulated and optimized by using genetic algorithm (GA) optimization methodology. The operations simulation shortened the installation duration by 39 days (about 16% of the original total duration), guided the manufacturers to plan the construction processes, and provided specific suggestions on the entry time of the installation components, resulting in resource allocation optimization, resource saving, and construction efficiency improvement. Combining with the optimized schedule, the 4D visualization environment can discover time-space conflicts timely, and may assist project managers to reschedule the construction activities in tune with the site layout and resource allocation. 展开更多
关键词 4D computer aided design (CAD) SIMULATION VISUALIZATION genetic algorithm OPTIMIZATION construction management
原文传递
BIM技术在核电工程信息管理与业务协同中的应用
10
作者 贺卫兵 杨尚 +1 位作者 王浩丞 徐照 《施工技术(中英文)》 2025年第2期118-125,共8页
核电工程施工阶段管理水平直接关系到核电项目运行安全,进而影响能源开发及公众生命财产安全,其重要性不言而喻。然而,目前核电工程施工过程中仍面临诸多难点问题,如复杂的工程环境、多专业协同设计效率低下及施工过程信息化水平不足等... 核电工程施工阶段管理水平直接关系到核电项目运行安全,进而影响能源开发及公众生命财产安全,其重要性不言而喻。然而,目前核电工程施工过程中仍面临诸多难点问题,如复杂的工程环境、多专业协同设计效率低下及施工过程信息化水平不足等,这些问题可能导致施工质量隐患,从而威胁核电站的长期安全运行。基于此,以BIM技术和平台开发为基础,针对核电工程施工中的关键问题进行深入分析,构建核电工程施工阶段BIM管理平台,结合Web端的三维可视化交互功能与协同工作流,实现GIS+BIM融合,提升核电工程施工阶段的信息交互和管理水平,从而为保障核电站的安全运行提供支撑。 展开更多
关键词 信息化 核电工程 建筑信息模型 建造阶段 协同设计 管理平台
下载PDF
基于微信小程序的施工管理系统设计与实现
11
作者 黄祖传 赵昕 张卫强 《科技创新与应用》 2025年第1期137-140,145,共5页
随着我国基建规模不断扩大,施工项目的数量也随之增加,这使得现场管理的难度不断加大。传统的施工管理系统已经无法满足现代化需求,因此基于微信小程序的施工管理系统成为解决这一问题的有效途径。微信小程序具有轻量化、跨平台和易用... 随着我国基建规模不断扩大,施工项目的数量也随之增加,这使得现场管理的难度不断加大。传统的施工管理系统已经无法满足现代化需求,因此基于微信小程序的施工管理系统成为解决这一问题的有效途径。微信小程序具有轻量化、跨平台和易用性强等特点,能够快速满足多种应用场景的需求。基于微信小程序的施工管理系统整合施工过程中的各个环节,实现信息的实时共享、调度和管理,从而提高现场管理的效率和质量。该文设计并实现一个基于微信小程序的施工管理系统,涵盖首页信息管理、日志管理、质量管理、安全管理和任务管理等方面,为施工现场管理提供全方位的解决方案。 展开更多
关键词 微信小程序 施工 系统 设计 管理
下载PDF
校地共建科研公共创新平台信息化建设方案设计
12
作者 林芳菲 洪镠锴 《科技资讯》 2025年第1期14-17,共4页
校地共建科研公共创新平台信息化建设是指在学校与地方政府合作框架下,共同设计并实施一套信息化系统,以提高科研管理效率、促进数据共享和增强创新活动的互动性。全面、系统地阐述了校地共建科研公共创新平台信息化建设的总体设计方案... 校地共建科研公共创新平台信息化建设是指在学校与地方政府合作框架下,共同设计并实施一套信息化系统,以提高科研管理效率、促进数据共享和增强创新活动的互动性。全面、系统地阐述了校地共建科研公共创新平台信息化建设的总体设计方案、具体实施方案以及设计的实现过程,包括平台架构设计、系统模块的划分与实施、技术选型标准,以及在具体建设中如何通过信息化基础设施建设、平台功能模块开发、数据管理优化和系统集成测试,以期提升科研创新能力。 展开更多
关键词 校地共建 科研公共创新平台信息化建设 方案设计 数据管理
下载PDF
深基坑施工技术在土木工程中的应用研究
13
作者 杨迩周 刘佳莹 《中国厨卫》 2025年第1期114-116,共3页
深基坑工程通常涉及复杂的技术难题,包括土体机械行为的控制、水文地质条件的适应性设计以及施工过程中的安全风险管理等。随着建筑技术的进步和城市需求的增加,传统的设计和施工方法已难以满足现代城市大型建筑的安全性与功能需求,因... 深基坑工程通常涉及复杂的技术难题,包括土体机械行为的控制、水文地质条件的适应性设计以及施工过程中的安全风险管理等。随着建筑技术的进步和城市需求的增加,传统的设计和施工方法已难以满足现代城市大型建筑的安全性与功能需求,因此对深基坑工程设计施工技术的持续研究显得尤为迫切。文章旨在通过系统分析和优化深基坑工程中支护结构的设计方法、开挖与边坡的稳定性及特殊水文地质条件下的设计要求,提高工程的安全性与可靠性。 展开更多
关键词 深基坑工程设计 基坑施工技术 风险管理 智能化技术应用
下载PDF
BIM技术在绵泸高速铁路泸州站设计建设中的应用
14
作者 曾诚 陈晓竹 《高速铁路技术》 2024年第2期87-90,112,共5页
大中型铁路客运站是高速铁路设计和施工中的复杂节点,其建设直接影响整条线路的施工质量和进度。本文以绵泸高速铁路泸州站为例,将BIM技术运用到车站的工程设计、施工和项目管理中。结果表明:利用BIM技术完成站场内路基、桥涵、轨道、... 大中型铁路客运站是高速铁路设计和施工中的复杂节点,其建设直接影响整条线路的施工质量和进度。本文以绵泸高速铁路泸州站为例,将BIM技术运用到车站的工程设计、施工和项目管理中。结果表明:利用BIM技术完成站场内路基、桥涵、轨道、接触网、综合管线及站房结构的系统建模,可发现结构间存在的干扰问题,及时对相关结构进行综合调整,优化站场设计,避免因站内各构筑物交叉干扰引起的设计和施工质量问题,达到在施工过程中规避风险、提升质量、缩短工期的目的。 展开更多
关键词 BIM技术 铁路站场 设计施工 项目管理
下载PDF
DB总承包模式下电力建设项目造价管理效能提升研究
15
作者 刘勇 徐振超 +2 位作者 刘序卿 殷永亮 胡锡燎 《建筑经济》 2024年第12期51-56,共6页
设计-施工(DB)总承包模式因其诸多优势成为了众多领域关注的焦点。然而,由于其角色定位灵活,传统造价管理模式较难适应DB总承包模式下电力建设项目的管理流程,无法完全满足项目建设的实际需求。因此,本文基于逻辑框架分析法,在系统梳理... 设计-施工(DB)总承包模式因其诸多优势成为了众多领域关注的焦点。然而,由于其角色定位灵活,传统造价管理模式较难适应DB总承包模式下电力建设项目的管理流程,无法完全满足项目建设的实际需求。因此,本文基于逻辑框架分析法,在系统梳理电力建设造价管理现状的基础上,结合DB项目造价管理的特异性,从管理流程、计价规范和依据、造价管理人员、制度建设等方面凝练出适合DB电力建设项目工程造价管理的效能提升思路和框架。 展开更多
关键词 电力建设项目 设计-施工(DB)总承包 造价管理 效能提升
下载PDF
提升代建制模式下工程设计管理效能的方法探讨
16
作者 王晓丽 曹为祥 王淑坤 《工程设计与施工》 2024年第7期32-34,共3页
代建制模式下的工程项目具有参建单位多、各方工作界面划分模糊、沟通协调程序复杂等特点,针对代建制工程的特点优化工程设计管理程序,对于保障项目设计质量、提高项目整体效益等方面具有重大意义。论文系统介绍了代建制模式下的工程设... 代建制模式下的工程项目具有参建单位多、各方工作界面划分模糊、沟通协调程序复杂等特点,针对代建制工程的特点优化工程设计管理程序,对于保障项目设计质量、提高项目整体效益等方面具有重大意义。论文系统介绍了代建制模式下的工程设计管理程序,分析了这一程序的重要意义,并深入探讨了影响工程设计管理效能的主要制约因素。针对现有的挑战,论文提出了一系列优化措施,包括引导业主决策、建立有效沟通机制、优化设计资源以及强化管理团队建设,旨在提高工程设计管理的整体效能。 展开更多
关键词 代建模式 设计管理效能 优化措施
下载PDF
基于云计算的高校学生信息分类管理系统设计
17
作者 叶小波 《自动化技术与应用》 2024年第10期186-189,194,共5页
现今高校学生信息体量较大,难以进行准确的信息分类管理,因此提出基于云计算的高校学生信息分类管理系统设计研究。设计系统体系结构,改进云计算技术中的决策树算法构造;以支持度与置信度最小化为目标,裁剪不准确、不频繁的决策规则;将... 现今高校学生信息体量较大,难以进行准确的信息分类管理,因此提出基于云计算的高校学生信息分类管理系统设计研究。设计系统体系结构,改进云计算技术中的决策树算法构造;以支持度与置信度最小化为目标,裁剪不准确、不频繁的决策规则;将学生信息输入至改进后的决策树中,获得学生信息分类结果,制定学生信息管理相关功能,实现高校学生信息的分类管理。测试数据显示:应用设计系统获得的学生信息分类错误率最小值为0.9%,学生信息管理规模最大值为148 GB,充分证实设计系统能够准确进行学生信息分类管理。 展开更多
关键词 云计算 学生信息 决策树构造 分类 管理系统 系统设计
下载PDF
BIM轻量化技术在水利工程中的应用 被引量:3
18
作者 代进雄 杨晓蕾 +6 位作者 李大可 潘虎 林晶 庄妍 张颖 王春艳 徐健 《人民黄河》 CAS 北大核心 2024年第3期121-125,共5页
为提高BIM轻量化技术在水利工程中应用的可行性和全面性,分析总结当下主流的BIM轻量化技术,以密云水库改造消隐工程为例,提出水利工程BIM轻量化技术应用路线,改善不同建设阶段BIM轻量化技术的应用效果。在设计阶段综合运用模型减面优化... 为提高BIM轻量化技术在水利工程中应用的可行性和全面性,分析总结当下主流的BIM轻量化技术,以密云水库改造消隐工程为例,提出水利工程BIM轻量化技术应用路线,改善不同建设阶段BIM轻量化技术的应用效果。在设计阶段综合运用模型减面优化法、渲染优化法以及BIM轻量化协同设计平台,能大幅度提高三维模型设计效率;采用BIM轻量化引擎将BIM设计模型传递至施工阶段,建立BIM轻量化施工管理平台,能有效提高施工管理质量,保障工程按时按质完成。针对当下BIM轻量化技术现状,提出未来发展的建议:BIM轻量化技术应集成多种水利工程行业特色数据,完善BIM规范及标准,使BIM轻量化应用体系更加规范化、科学化。 展开更多
关键词 BIM轻量化技术 轻量化引擎 三维协同设计 施工管理 BIM+GIS LOD
下载PDF
基于EPC的BIM技术在设计-施工一体化中的综合应用 被引量:2
19
作者 孙浩 姜安庆 +2 位作者 缪仁卿 范玮武 杨焰 《建筑结构》 北大核心 2024年第8期152-158,151,共8页
近年来,在建筑业高质量发展需求的驱动下,EPC工程总承包蓬勃发展。在EPC模式下,总承包单位需对建设项目的设计、采购、施工等全要素进行管控,与此同时,项目风险更多地从业主单位向总承包单位转移,这对总承包单位的综合管理能力提出了更... 近年来,在建筑业高质量发展需求的驱动下,EPC工程总承包蓬勃发展。在EPC模式下,总承包单位需对建设项目的设计、采购、施工等全要素进行管控,与此同时,项目风险更多地从业主单位向总承包单位转移,这对总承包单位的综合管理能力提出了更为苛刻的要求。在设计阶段,提前考虑项目需求,采用多种BIM技术对关键问题开展研究,通过BIM技术间的融合与互补,有助于打破传统发包模式下设计与施工“各自为战”的窘境,进而实现“设计-施工一体化”。通过研究某EPC项目,介绍多种BIM技术在设计、商务、施工中的综合应用,针对关键问题利用BIM技术提出更合理的解决方案,加强设计与商务、施工的深度融合,体现EPC工程总承包“协同、高效、共赢”的价值属性。 展开更多
关键词 EPC工程总承包 设计-施工一体化 BIM技术 设计管理 价值工程
下载PDF
核电全厂通信系统设备采购管理浅析
20
作者 武志惠 武冠宇 王蕾 《工程建设与设计》 2024年第7期252-254,共3页
核电站全厂通信系统具有种类繁多、数量多、覆盖全厂等特点。目前,通信设备采购在设计、采购、安装单位管理3个方面均存在较多问题,此类问题制约工程进展。针对上述问题,论文从设计、采购、安装管理3个方面提出了工作对策,旨在提高采购... 核电站全厂通信系统具有种类繁多、数量多、覆盖全厂等特点。目前,通信设备采购在设计、采购、安装单位管理3个方面均存在较多问题,此类问题制约工程进展。针对上述问题,论文从设计、采购、安装管理3个方面提出了工作对策,旨在提高采购工作效率,保证设备按时到货,保障现场安装进度。 展开更多
关键词 核电厂 全厂通信系统 设计管理 采购管理 安装管理
下载PDF
上一页 1 2 69 下一页 到第
使用帮助 返回顶部