Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- d...Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.展开更多
The earth-rockfill dam is one of the primary dam types in the selection of high dams to be constructed in Western China, since it is characterized by favorable adaptability of the dam foundation; full utilization of l...The earth-rockfill dam is one of the primary dam types in the selection of high dams to be constructed in Western China, since it is characterized by favorable adaptability of the dam foundation; full utilization of local earth, rock, and building-excavated materials; low construction cost; and low cement consumption. Many major technical issues regarding earth-rockfill dams with a height of over 250 m were studied and solved successfully in the construction of the 261.5 m Nuozhadu earth core rockfill dam. This paper describes research achievements and basic conclusions; systematically summarizes the accumulated experiences from the construction of the Nuozhadu Dam and other high earth-rockfill dams; and discusses major technical issues, such as deformation control, seepage control, dam slope stability, safety and control of flood discharging, safety and quality control of dam construction, safety assessments, early warning, and other key technical difficulties. This study also provides a reference and technological support for the future construction of 300 m high earth-rockfill dams.展开更多
The genetic parameters of main reproductive traits for the new Yorkshire line with high prolificacy were evaluated by multiple animal model DFREML The re- suits showed that the heritability evaluates of the total numb...The genetic parameters of main reproductive traits for the new Yorkshire line with high prolificacy were evaluated by multiple animal model DFREML The re- suits showed that the heritability evaluates of the total number of born (TNB), alive number of born (ANB), litter weigh at birth (LWB) and litter weight at age of 21 days were 0.10, 0.15, 0.09 and 0.14, respectively. The genetic correlations between these traits, for example, the correlations between TNB/ANB, NB/LWB, TNB/LW21, ANB/LWB, ANB/LW21 and LWB/LW21 were 0.87, 0.74, 0.43, 0.69, 0.59 and 0.51, respectively.展开更多
The combined selection index used in the breeding of new Yorkshire dam line with high prolificacy according to breeding objects was formulated as /:2.272E- BVNB-0.056EBVDAYS. After 5 generations breeding, the two mai...The combined selection index used in the breeding of new Yorkshire dam line with high prolificacy according to breeding objects was formulated as /:2.272E- BVNB-0.056EBVDAYS. After 5 generations breeding, the two main selected traits such as total number of born and age at 100 kg weight was 12.17 piglets/litter and 165.18 d, respectively. The genetic improvements per generates was 0.156 and -2.198, respec- tively. The breeding objects of the new Yorkshire dam line with high prolificacy were basically reached. It indicated that the methods and index could be used in pig breeding.展开更多
To study the effect of a strong underwater shock wave on a concrete dam, this research aims to improve hammer impact methods in model tests. Six 1:200 scale models were designed and tested under distributed impact loa...To study the effect of a strong underwater shock wave on a concrete dam, this research aims to improve hammer impact methods in model tests. Six 1:200 scale models were designed and tested under distributed impact loads. A device was deployed for a direct measurement of the impact force at the upstream face of the dams. The model dam bases were anchored to prevent displacement. The experimental results indicate that the top part of the concrete dam is a weak zone, and the impact failure initiates with a fracture on the top of the dam. The peak value of impact stress increases when the second crack appears in the concrete dam from the upstream face to the downstream face. And, the level of the second crack in the dam body is lower as the peak value of impact stress increases. In this study, dynamic analysis was conducted by calculating the results to verify the effectiveness of a device to directly measure the impact force. This method may be used to approximately forecast the damage of concrete dam and may also be useful in other engineering applications.展开更多
Parallel computation programs are developed for three-dimensional meso-mechanics analysis of fully-graded dam concrete and seismic response analysis of high arch dams (ADs), based on the Parallel Finite Element Prog...Parallel computation programs are developed for three-dimensional meso-mechanics analysis of fully-graded dam concrete and seismic response analysis of high arch dams (ADs), based on the Parallel Finite Element Program Generator (PFEPG). The computational algorithms of the numerical simulation of the meso-structure of concrete specimens were studied. Taking into account damage evolution, static preload, strain rate effect, and the heterogeneity of the meso-structure of dam concrete, the fracture processes of damage evolution and configuration of the cracks can be directly simulated. In the seismic response analysis of ADs, all the following factors are involved, such as the nonlinear contact due to the opening and slipping of the contraction joints, energy dispersion of the far-field foundation, dynamic interactions of the dam-foundation- reservoir system, and the combining effects of seismic action with all static loads. The correctness, reliability and efficiency of the two parallel computational programs are verified with practical illustrations.展开更多
The concrete-faced rockfill dam(CFRD) is an important dam type in the selection of high dams to be constructed in Western China,owing to its direct utilization of local materials,good adaptability,and distinct economi...The concrete-faced rockfill dam(CFRD) is an important dam type in the selection of high dams to be constructed in Western China,owing to its direct utilization of local materials,good adaptability,and distinct economic advantages.Over the past decades,China has gained successful experience in the construction of 200 m CFRDs,providing the necessary technical accumulation for the development of 250–300 m ultra-high CFRDs.This paper summarizes these successful experiences and analyzes the problems of a number of major 200 m CFRDs around the world.In addition,it discusses the key technologies and latest research progress regarding safety in the construction of 250–300 m ultra-high CFRDs,and suggests focuses and general ideas for future research.展开更多
China is a country of high seismicity with many hydropower resources. Recently,a series of high arch dams have either been completed or are being constructed in seismic regions,of which most are concrete dams. The eva...China is a country of high seismicity with many hydropower resources. Recently,a series of high arch dams have either been completed or are being constructed in seismic regions,of which most are concrete dams. The evaluation of seismic safety often becomes a critical problem in dam design. In this paper,a brief introduction to major progress in the research on seismic aspects of large concrete dams,conducted mainly at the Institute of Water Resources and Hydropower Research(IWHR) during the past 60 years,is presented. The dam site-specific ground motion input,improved response analysis,dynamic model test verification,field experiment investigations,dynamic behavior of dam concrete,and seismic monitoring and observation are described. Methods to prevent collapse of high concrete dams under maximum credible earthquakes are discussed.展开更多
Based on a Chinese national high arch dam located in a meizoseismal region, a nonlinear numerical analysis model of the damage and failure process of a dam-foundation system is established by employing a 3-D deformabl...Based on a Chinese national high arch dam located in a meizoseismal region, a nonlinear numerical analysis model of the damage and failure process of a dam-foundation system is established by employing a 3-D deformable distinct element code(3DEC) and its re-development functions. The proposed analysis model considers the dam-foundation-reservoir coupling effect, infl uence of nonlinear contact in the opening and closing of the dam seam surface and abutment rock joints during strong earthquakes, and radiation damping of far fi eld energy dissipation according to the actual workability state of an arch dam. A safety assessment method and safety evaluation criteria is developed to better understand the arch dam system disaster process from local damage to ultimate failure. The dynamic characteristics, disaster mechanism, limit bearing capacity and the entire failure process of a high arch dam under a strong earthquake are then analyzed. Further, the seismic safety of the arch dam is evaluated according to the proposed evaluation criteria and safety assessment method. As a result, some useful conclusions are obtained for some aspects of the disaster mechanism and failure process of an arch dam. The analysis method and conclusions may be useful in engineering practice.展开更多
According to theoretical analysis, a general characteristic of the ground vibration induced by high dam flood discharge is that the dominant frequency ranges over several narrow frequency bands, which is verified by o...According to theoretical analysis, a general characteristic of the ground vibration induced by high dam flood discharge is that the dominant frequency ranges over several narrow frequency bands, which is verified by observations from the Xiangjiaba Hydropower Station. Nonlinear base isolation is used to reduce the structure vibration under ground excitation and the advantage of the isolation application is that the low-frequency resonance problem does not need to be considered due to its excitation characteristics, which significantly facilitate the isolation design. In order to obtain the response probabilistic distribution of a nonlinear system, the state space split technique is modified. As only a few degrees of freedom are subjected to the random noise, the probabilistic distribution of the response without involving stochastic excitation is represented by the δ function. Then, the sampling property of the δ function is employed to reduce the dimension of the Fokker-Planck-Kolmogorov (FPK) equation and the low-dimensional FPK equation is solvable with existing methods. Numerical results indicate that the proposed approach is effective and accurate. Moreover, the response probabilistic distributions are more reasonable and scientific than the peak responses calculated by conventional time and frequency domain methods.展开更多
A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction ...A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction process was established. By combining dynamic construction simulation with schedule analysis, the process of construction schedule forecasting and analysis based on dynamic simulation was studied. The process of real-time schedule control was constructed and some measures for dynamic adjustment and control of construction schedule were provided. A system developed with the method is utilized in a being constructed hydroelectric project located at the Yellow River in northwest China, which can make the pouring plan of the dam in the next stage (a month, quarter or year) to guide the practical construction. The application result shows that the system provides an effective technical support for the construction and management of the dam.展开更多
Modal parameters, including fundamental frequencies, damping ratios, and mode shapes, could be used to evaluate the health condition of structures. Automatic modal parameter identification, which plays an essential ro...Modal parameters, including fundamental frequencies, damping ratios, and mode shapes, could be used to evaluate the health condition of structures. Automatic modal parameter identification, which plays an essential role in realtime structural health monitoring, has become a popular topic in recent years. In this study, an automatic modal parameter identification procedure for high arch dams is proposed. The proposed procedure is implemented by combining the densitybased spatial clustering of applications with noise(DBSCAN) algorithm and the stochastic subspace identification(SSI). The 210-m-high Dagangshan Dam is investigated as an example to verify the feasibility of the procedure. The results show that the DBSCAN algorithm is robust enough to interpret the stabilization diagram from SSI and may avoid outline modes. This leads to the proposed procedure obtaining a better performance than the partitioned clustering and hierarchical clustering algorithms. In addition, the errors of the identified frequencies of the arch dam are within 4%, and the identified mode shapes are in agreement with those obtained from the finite element model, which implies that the proposed procedure is accurate enough to use in modal parameter identification. The procedure is feasible for online modal parameter identification and modal tracking of arch dams.展开更多
Some super high arch dams ( SHADs), like Xiluodu Arch Dam, after their heights reaching the magnitude of 300 m, confront lots of technical challenges in design and construction. Several crucial technologies of 6 SHA...Some super high arch dams ( SHADs), like Xiluodu Arch Dam, after their heights reaching the magnitude of 300 m, confront lots of technical challenges in design and construction. Several crucial technologies of 6 SHADs will be reviewed and discussed in this and consecutive papers, including Xiluodu, Jinping I in China, Baktiary in Iran, ete. , on the topics of the research method, criterion for evaluation and engineering application of dam safety analysis and evaluation, reasonable dam base interface, dam shape optimization, comprehensive treatments of complex foundation, anti-seismic engineering, dam construction material, concrete placement and temperature control, instrumentation and monitoring of dam operation, etc. This paper will mainly focus on the overall safety of SHADs, reasonable dam base interface analysis and evaluation and their engineering application.展开更多
The strict definition and logical description of the concept of structure stability and failure are presented. The criterion of structure stability is developed based on plastic complementary energy and its variation....The strict definition and logical description of the concept of structure stability and failure are presented. The criterion of structure stability is developed based on plastic complementary energy and its variation. It is presented that the principle of minimum plastic complementary energy is the combination of structure equilibrium, coordination condition of deformation and constitutive relationship. Based on the above arguments, the deformation reinforcement theory is developed. The structure global stability can be described by the relationship between the global degree of safety of structure and the plastic complementary energy. Correspondingly, the new idea is used in the evaluations of global stability, anchorage force of dam-toe, fracture of dam-heel and treatment of faults of high arch dams in China. The results show that the deformation reinforcement theory provides a uniform and practical theoretical framework and a valuable solution for the analysis of global stability, dam-heel cracking, dam-toe anchorage and reinforcement of faults of high arch dams and their foundations.展开更多
Hydropower development in China is concentrated in the country's western regions.Among all the rivers in China,the lower course of the Jinsha River contains the richest hydro-energy resource,and therefore,4 mammot...Hydropower development in China is concentrated in the country's western regions.Among all the rivers in China,the lower course of the Jinsha River contains the richest hydro-energy resource,and therefore,4 mammoth hydropower plants are under construction on this particular section of the river at Wudongde,Baihetan,Xiluodu,and Xiangjiaba.The water-blocking structures of the hydropower facilities at Wudongde,Baihetan and Xiluodu are all arch dams of around 300 m high.In view of changes in the geological conditions at the foundation of the Xiluodu dam on the riverbed after excavation started,the designs of expanding foundation surface excavation and dovetailing the dam body and foundation rock on both upstream and downstream sides were introduced,allowing the arch dam and foundation to fit each other and improving the stress conditions of the dam body and foundation.By dividing the dam body into various concrete sections,the dynamic properties of concrete were adequately adjusted to the distribution of stress in the dam body.In addition,the use of the most optimal concrete material and mixture ratio allowed thermodynamics of concrete to satisfy the requirements of the strength,durability,temperature control and crack prevention of the concrete.Moreover,rigorous temperature control measures were introduced to prevent harmful cracking,thus enhancing the integrity of the arch dam.Furthermore,sophisticated construction machinery,scientific testing methods,and sound construction techniques were employed to ensure the uniformity and reliability of concrete placement.The "Digital Dam" for the Xiluodu project,which is based on the theory of total life cycle,has supplied strong support for construction process control and decision-making.展开更多
Due to the complexity of earthwork allocation system for the construction of high concrete face rockfill dam,traditional allocation and planning are not able to function properly in the construction process with stron...Due to the complexity of earthwork allocation system for the construction of high concrete face rockfill dam,traditional allocation and planning are not able to function properly in the construction process with strong randomness.In this paper,the working mechanism of earthwork dynamic allocation system is analyzed comprehensively and a solution to fuzzy earthwork dynamic allocation is proposed on the basis of uncertain factors in the earthwork allocation of a hydropower project.Under the premise of actual situation and the experience of the construction site,an all-coefficient-fuzzy linear programming mathematical model with fuzzy parameters and constraints for earthwork allocation is established according to the structure unit weighted ranking criteria.In this way,the deficiency of certain allocation model can be overcome.The application results indicate that the proposed method is more rational compared with traditional earthwork allocation.展开更多
The study on developing the reasonable safety monitoring indexes plays a most importantly role in the health monitoring of high core rockfill dams. However, researches on this topic are relatively scarce both at home ...The study on developing the reasonable safety monitoring indexes plays a most importantly role in the health monitoring of high core rockfill dams. However, researches on this topic are relatively scarce both at home and abroad. In this paper, the characteristics and failure modes of seepage in high core rockfill dam are analyzed firstly. Then, a safety monitoring index based on seepage quantity, which reflects the overall seepage behavior, is developed, using the real-time monitoring data and its safety monitoring model. Moreover, another safety monitoring index based on seepage gradient, reflecting the local seepage behavior, is proposed, combining the spatial layout of osmo- meters and local failure mechanisms of core wall. Additionally, one more safety monitoring index based on permeability coefficient, which considers the overall and local seepage behaviors, is developed, on the basis of establishing the finite element analysis model and real-time seepage coefficient inversion analysis model of high core rockfill dam. A case study on these indexes of Nuozhadu high core rockfill dam is developed, which improves the reliability of seepage safety evaluation of the dam.展开更多
In respect to current situation and new challenges for high dam construction in China, safety problems are an- alyzed for high dam construction under complex natural conditions such as high elevation, cold area, high ...In respect to current situation and new challenges for high dam construction in China, safety problems are an- alyzed for high dam construction under complex natural conditions such as high elevation, cold area, high seismic inten- sity, large-seale landslide and high dam and huge reservoirs with dam types such as concrete surface rock-fill, asphalt concrete core, roller compacted concrete (RCC) arch dam and so on. From several aspects, including risk response measures for high dam, strengthening safety awareness for high dam design and construction, improving high dam con- struetion technique, intelligent dam safety management system based on IT, developing dam rehabilitation and mainte- nance technologies, useful dam safety and coping strategy is proposed.展开更多
With better understanding of the quality and physico-mechanical properties of rocks of dam foundation,and the physico-mechanical properties and structure design of arch dam in association with the foundation excavatio...With better understanding of the quality and physico-mechanical properties of rocks of dam foundation,and the physico-mechanical properties and structure design of arch dam in association with the foundation excavation of Xiluodu arch dam,the excavation optimization design was proposed for the foundation surface on the basis of feasibility study.Common analysis and numerical analysis results demonstrated the feasibility of using the weakly weathered rocks III1and III2as the foundation surface of super-high arch dam.In view of changes in the geological conditions at the dam foundation along the riverbed direction,the design of extending foundation surface excavation area and using consolidating grouting and optimizing structure of dam bottom was introduced,allowing for harmonization of the arch dam and foundation.Three-dimensional(3D)geomechanics model test and fi nite element analysis results indicated that the dam body and foundation have good overload stability and high bearing capacity.The monitoring data showed that the behaviors of dam and foundation correspond with the designed patterns in the construction period and the initial operation period.展开更多
In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis c...In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions.展开更多
文摘Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.
文摘The earth-rockfill dam is one of the primary dam types in the selection of high dams to be constructed in Western China, since it is characterized by favorable adaptability of the dam foundation; full utilization of local earth, rock, and building-excavated materials; low construction cost; and low cement consumption. Many major technical issues regarding earth-rockfill dams with a height of over 250 m were studied and solved successfully in the construction of the 261.5 m Nuozhadu earth core rockfill dam. This paper describes research achievements and basic conclusions; systematically summarizes the accumulated experiences from the construction of the Nuozhadu Dam and other high earth-rockfill dams; and discusses major technical issues, such as deformation control, seepage control, dam slope stability, safety and control of flood discharging, safety and quality control of dam construction, safety assessments, early warning, and other key technical difficulties. This study also provides a reference and technological support for the future construction of 300 m high earth-rockfill dams.
基金Supported by National Science and Technology Support Plan during the Eleventh Five-year Plan(2006BAD01A08-02)Hubei Agricultural Innovation Program(2007-620-004-003)Special Fund for Modern Pig Production Technology Construction(NYCYTX-009)~~
文摘The genetic parameters of main reproductive traits for the new Yorkshire line with high prolificacy were evaluated by multiple animal model DFREML The re- suits showed that the heritability evaluates of the total number of born (TNB), alive number of born (ANB), litter weigh at birth (LWB) and litter weight at age of 21 days were 0.10, 0.15, 0.09 and 0.14, respectively. The genetic correlations between these traits, for example, the correlations between TNB/ANB, NB/LWB, TNB/LW21, ANB/LWB, ANB/LW21 and LWB/LW21 were 0.87, 0.74, 0.43, 0.69, 0.59 and 0.51, respectively.
基金Supported by National Science and Technology Support Plan during the Eleventh Five-year Plan(2006BAD01A08-02)Hubei Agricultural Innovation Program(2007-620-004-003)Special Fund for Modern Pig Production Technology Construction(NYCYTX-009)~~
文摘The combined selection index used in the breeding of new Yorkshire dam line with high prolificacy according to breeding objects was formulated as /:2.272E- BVNB-0.056EBVDAYS. After 5 generations breeding, the two main selected traits such as total number of born and age at 100 kg weight was 12.17 piglets/litter and 165.18 d, respectively. The genetic improvements per generates was 0.156 and -2.198, respec- tively. The breeding objects of the new Yorkshire dam line with high prolificacy were basically reached. It indicated that the methods and index could be used in pig breeding.
基金The National Science Foundation of China under Grant No.51121005
文摘To study the effect of a strong underwater shock wave on a concrete dam, this research aims to improve hammer impact methods in model tests. Six 1:200 scale models were designed and tested under distributed impact loads. A device was deployed for a direct measurement of the impact force at the upstream face of the dams. The model dam bases were anchored to prevent displacement. The experimental results indicate that the top part of the concrete dam is a weak zone, and the impact failure initiates with a fracture on the top of the dam. The peak value of impact stress increases when the second crack appears in the concrete dam from the upstream face to the downstream face. And, the level of the second crack in the dam body is lower as the peak value of impact stress increases. In this study, dynamic analysis was conducted by calculating the results to verify the effectiveness of a device to directly measure the impact force. This method may be used to approximately forecast the damage of concrete dam and may also be useful in other engineering applications.
基金National Natural Science Foundation of China Under Grant No.90510017
文摘Parallel computation programs are developed for three-dimensional meso-mechanics analysis of fully-graded dam concrete and seismic response analysis of high arch dams (ADs), based on the Parallel Finite Element Program Generator (PFEPG). The computational algorithms of the numerical simulation of the meso-structure of concrete specimens were studied. Taking into account damage evolution, static preload, strain rate effect, and the heterogeneity of the meso-structure of dam concrete, the fracture processes of damage evolution and configuration of the cracks can be directly simulated. In the seismic response analysis of ADs, all the following factors are involved, such as the nonlinear contact due to the opening and slipping of the contraction joints, energy dispersion of the far-field foundation, dynamic interactions of the dam-foundation- reservoir system, and the combining effects of seismic action with all static loads. The correctness, reliability and efficiency of the two parallel computational programs are verified with practical illustrations.
文摘The concrete-faced rockfill dam(CFRD) is an important dam type in the selection of high dams to be constructed in Western China,owing to its direct utilization of local materials,good adaptability,and distinct economic advantages.Over the past decades,China has gained successful experience in the construction of 200 m CFRDs,providing the necessary technical accumulation for the development of 250–300 m ultra-high CFRDs.This paper summarizes these successful experiences and analyzes the problems of a number of major 200 m CFRDs around the world.In addition,it discusses the key technologies and latest research progress regarding safety in the construction of 250–300 m ultra-high CFRDs,and suggests focuses and general ideas for future research.
文摘China is a country of high seismicity with many hydropower resources. Recently,a series of high arch dams have either been completed or are being constructed in seismic regions,of which most are concrete dams. The evaluation of seismic safety often becomes a critical problem in dam design. In this paper,a brief introduction to major progress in the research on seismic aspects of large concrete dams,conducted mainly at the Institute of Water Resources and Hydropower Research(IWHR) during the past 60 years,is presented. The dam site-specific ground motion input,improved response analysis,dynamic model test verification,field experiment investigations,dynamic behavior of dam concrete,and seismic monitoring and observation are described. Methods to prevent collapse of high concrete dams under maximum credible earthquakes are discussed.
基金National Natural Science Foundation of China under Grant No.90510017
文摘Based on a Chinese national high arch dam located in a meizoseismal region, a nonlinear numerical analysis model of the damage and failure process of a dam-foundation system is established by employing a 3-D deformable distinct element code(3DEC) and its re-development functions. The proposed analysis model considers the dam-foundation-reservoir coupling effect, infl uence of nonlinear contact in the opening and closing of the dam seam surface and abutment rock joints during strong earthquakes, and radiation damping of far fi eld energy dissipation according to the actual workability state of an arch dam. A safety assessment method and safety evaluation criteria is developed to better understand the arch dam system disaster process from local damage to ultimate failure. The dynamic characteristics, disaster mechanism, limit bearing capacity and the entire failure process of a high arch dam under a strong earthquake are then analyzed. Further, the seismic safety of the arch dam is evaluated according to the proposed evaluation criteria and safety assessment method. As a result, some useful conclusions are obtained for some aspects of the disaster mechanism and failure process of an arch dam. The analysis method and conclusions may be useful in engineering practice.
基金National Key R&D Program of China under Grant No.2016YFC0401705Science Fund for Creative Research Groups of the National Natural Science Foundation of China Grant No.51621092+3 种基金the National Natural Science Foundation of China Grant No.51579173,No.51379140,No.51309177 and No.51509180the Fund for Key Research Area Innovation Groups of China Ministry of Science and Technology Grant No.2014RA4031the Program of Introducing Talents of Discipline to Universities Grant No.B14012the Tianjin Innovation Team Foundation of Key Research Areas Grant No.2014TDA001
文摘According to theoretical analysis, a general characteristic of the ground vibration induced by high dam flood discharge is that the dominant frequency ranges over several narrow frequency bands, which is verified by observations from the Xiangjiaba Hydropower Station. Nonlinear base isolation is used to reduce the structure vibration under ground excitation and the advantage of the isolation application is that the low-frequency resonance problem does not need to be considered due to its excitation characteristics, which significantly facilitate the isolation design. In order to obtain the response probabilistic distribution of a nonlinear system, the state space split technique is modified. As only a few degrees of freedom are subjected to the random noise, the probabilistic distribution of the response without involving stochastic excitation is represented by the δ function. Then, the sampling property of the δ function is employed to reduce the dimension of the Fokker-Planck-Kolmogorov (FPK) equation and the low-dimensional FPK equation is solvable with existing methods. Numerical results indicate that the proposed approach is effective and accurate. Moreover, the response probabilistic distributions are more reasonable and scientific than the peak responses calculated by conventional time and frequency domain methods.
基金National Natural Science Foundation of China(No.50539120)National Basic Research Program of China("973"Program,No. 2007 CB714101)+1 种基金National Science Fund for Distinguished Young Scholars of China(No.50525927)National Natural Science Founda-tion of China(No.50579045)
文摘A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction process was established. By combining dynamic construction simulation with schedule analysis, the process of construction schedule forecasting and analysis based on dynamic simulation was studied. The process of real-time schedule control was constructed and some measures for dynamic adjustment and control of construction schedule were provided. A system developed with the method is utilized in a being constructed hydroelectric project located at the Yellow River in northwest China, which can make the pouring plan of the dam in the next stage (a month, quarter or year) to guide the practical construction. The application result shows that the system provides an effective technical support for the construction and management of the dam.
基金National Natural Science Foundation of China under Grant Nos. 51725901 and 51639006。
文摘Modal parameters, including fundamental frequencies, damping ratios, and mode shapes, could be used to evaluate the health condition of structures. Automatic modal parameter identification, which plays an essential role in realtime structural health monitoring, has become a popular topic in recent years. In this study, an automatic modal parameter identification procedure for high arch dams is proposed. The proposed procedure is implemented by combining the densitybased spatial clustering of applications with noise(DBSCAN) algorithm and the stochastic subspace identification(SSI). The 210-m-high Dagangshan Dam is investigated as an example to verify the feasibility of the procedure. The results show that the DBSCAN algorithm is robust enough to interpret the stabilization diagram from SSI and may avoid outline modes. This leads to the proposed procedure obtaining a better performance than the partitioned clustering and hierarchical clustering algorithms. In addition, the errors of the identified frequencies of the arch dam are within 4%, and the identified mode shapes are in agreement with those obtained from the finite element model, which implies that the proposed procedure is accurate enough to use in modal parameter identification. The procedure is feasible for online modal parameter identification and modal tracking of arch dams.
文摘Some super high arch dams ( SHADs), like Xiluodu Arch Dam, after their heights reaching the magnitude of 300 m, confront lots of technical challenges in design and construction. Several crucial technologies of 6 SHADs will be reviewed and discussed in this and consecutive papers, including Xiluodu, Jinping I in China, Baktiary in Iran, ete. , on the topics of the research method, criterion for evaluation and engineering application of dam safety analysis and evaluation, reasonable dam base interface, dam shape optimization, comprehensive treatments of complex foundation, anti-seismic engineering, dam construction material, concrete placement and temperature control, instrumentation and monitoring of dam operation, etc. This paper will mainly focus on the overall safety of SHADs, reasonable dam base interface analysis and evaluation and their engineering application.
基金Supported by the China National Funds for Distinguished Young Scientists (50925931)the Special Funds for Major State Basic Research Projects (2009CB724604)
文摘The strict definition and logical description of the concept of structure stability and failure are presented. The criterion of structure stability is developed based on plastic complementary energy and its variation. It is presented that the principle of minimum plastic complementary energy is the combination of structure equilibrium, coordination condition of deformation and constitutive relationship. Based on the above arguments, the deformation reinforcement theory is developed. The structure global stability can be described by the relationship between the global degree of safety of structure and the plastic complementary energy. Correspondingly, the new idea is used in the evaluations of global stability, anchorage force of dam-toe, fracture of dam-heel and treatment of faults of high arch dams in China. The results show that the deformation reinforcement theory provides a uniform and practical theoretical framework and a valuable solution for the analysis of global stability, dam-heel cracking, dam-toe anchorage and reinforcement of faults of high arch dams and their foundations.
文摘Hydropower development in China is concentrated in the country's western regions.Among all the rivers in China,the lower course of the Jinsha River contains the richest hydro-energy resource,and therefore,4 mammoth hydropower plants are under construction on this particular section of the river at Wudongde,Baihetan,Xiluodu,and Xiangjiaba.The water-blocking structures of the hydropower facilities at Wudongde,Baihetan and Xiluodu are all arch dams of around 300 m high.In view of changes in the geological conditions at the foundation of the Xiluodu dam on the riverbed after excavation started,the designs of expanding foundation surface excavation and dovetailing the dam body and foundation rock on both upstream and downstream sides were introduced,allowing the arch dam and foundation to fit each other and improving the stress conditions of the dam body and foundation.By dividing the dam body into various concrete sections,the dynamic properties of concrete were adequately adjusted to the distribution of stress in the dam body.In addition,the use of the most optimal concrete material and mixture ratio allowed thermodynamics of concrete to satisfy the requirements of the strength,durability,temperature control and crack prevention of the concrete.Moreover,rigorous temperature control measures were introduced to prevent harmful cracking,thus enhancing the integrity of the arch dam.Furthermore,sophisticated construction machinery,scientific testing methods,and sound construction techniques were employed to ensure the uniformity and reliability of concrete placement.The "Digital Dam" for the Xiluodu project,which is based on the theory of total life cycle,has supplied strong support for construction process control and decision-making.
基金Supported by the Science Fund for Creative Research Groups of National Natural Science Foundation of China(No.51021004)Tianjin Research Program of Application Foundation and Advanced Technology(No.12JCZDJC29200)National Key Technology R and D Program in the 12th Five-Year Plan of China(No.2011BAB10B06)
文摘Due to the complexity of earthwork allocation system for the construction of high concrete face rockfill dam,traditional allocation and planning are not able to function properly in the construction process with strong randomness.In this paper,the working mechanism of earthwork dynamic allocation system is analyzed comprehensively and a solution to fuzzy earthwork dynamic allocation is proposed on the basis of uncertain factors in the earthwork allocation of a hydropower project.Under the premise of actual situation and the experience of the construction site,an all-coefficient-fuzzy linear programming mathematical model with fuzzy parameters and constraints for earthwork allocation is established according to the structure unit weighted ranking criteria.In this way,the deficiency of certain allocation model can be overcome.The application results indicate that the proposed method is more rational compared with traditional earthwork allocation.
文摘The study on developing the reasonable safety monitoring indexes plays a most importantly role in the health monitoring of high core rockfill dams. However, researches on this topic are relatively scarce both at home and abroad. In this paper, the characteristics and failure modes of seepage in high core rockfill dam are analyzed firstly. Then, a safety monitoring index based on seepage quantity, which reflects the overall seepage behavior, is developed, using the real-time monitoring data and its safety monitoring model. Moreover, another safety monitoring index based on seepage gradient, reflecting the local seepage behavior, is proposed, combining the spatial layout of osmo- meters and local failure mechanisms of core wall. Additionally, one more safety monitoring index based on permeability coefficient, which considers the overall and local seepage behaviors, is developed, on the basis of establishing the finite element analysis model and real-time seepage coefficient inversion analysis model of high core rockfill dam. A case study on these indexes of Nuozhadu high core rockfill dam is developed, which improves the reliability of seepage safety evaluation of the dam.
文摘In respect to current situation and new challenges for high dam construction in China, safety problems are an- alyzed for high dam construction under complex natural conditions such as high elevation, cold area, high seismic inten- sity, large-seale landslide and high dam and huge reservoirs with dam types such as concrete surface rock-fill, asphalt concrete core, roller compacted concrete (RCC) arch dam and so on. From several aspects, including risk response measures for high dam, strengthening safety awareness for high dam design and construction, improving high dam con- struetion technique, intelligent dam safety management system based on IT, developing dam rehabilitation and mainte- nance technologies, useful dam safety and coping strategy is proposed.
文摘With better understanding of the quality and physico-mechanical properties of rocks of dam foundation,and the physico-mechanical properties and structure design of arch dam in association with the foundation excavation of Xiluodu arch dam,the excavation optimization design was proposed for the foundation surface on the basis of feasibility study.Common analysis and numerical analysis results demonstrated the feasibility of using the weakly weathered rocks III1and III2as the foundation surface of super-high arch dam.In view of changes in the geological conditions at the dam foundation along the riverbed direction,the design of extending foundation surface excavation area and using consolidating grouting and optimizing structure of dam bottom was introduced,allowing for harmonization of the arch dam and foundation.Three-dimensional(3D)geomechanics model test and fi nite element analysis results indicated that the dam body and foundation have good overload stability and high bearing capacity.The monitoring data showed that the behaviors of dam and foundation correspond with the designed patterns in the construction period and the initial operation period.
文摘In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions.