期刊文献+
共找到2,333篇文章
< 1 2 117 >
每页显示 20 50 100
Simulation of Underground Reservoir Stability of Pumped Storage Power Station Based on Fluid-Structure Coupling
1
作者 Peng Qiao Shuangshuang Lan +1 位作者 Hongbiao Gu Zhengtan Mao 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第5期1381-1399,共19页
Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its co... Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state. 展开更多
关键词 Underground reservoir fluid-structure coupling numerical simulation pumped storage power station filling and discharge
下载PDF
Prospect of new pumped-storage power station 被引量:4
2
作者 Jingyan Li Chuanbao Yi Sujie Gao 《Global Energy Interconnection》 2019年第3期235-243,共9页
In this paper, a new type of pumped-storage power station with faster response speed, wider regulation range, and better stability is proposed. The operational flexible of the traditional pumped-storage power station ... In this paper, a new type of pumped-storage power station with faster response speed, wider regulation range, and better stability is proposed. The operational flexible of the traditional pumped-storage power station can be improved with variable-speed pumped-storage tech no logy. Combined with chemical en ergy storage, the failure to achieve sec on d-order response speed and the insufficient safety and reliability of pumped-storage power units could be solved. With the better solar en ergy and site resources, the in teg rated performance can be improved by an optical storage system in stalled in future pumped-storage stations. Through the characteristics analysis of the new type of pumped-storage power station, three types of optimal station locations are proposed, namely, the load concentration area, new energy concentration area, and ultrahigh- voltage direct current receiver area. Taking the new pumped-storage power station as an example, the advantages of multi-energy cooperation and joint operation are analyzed. It can be predicted that the frequency and load regulation of the power grid will be more flexible, and the service capacity to the main power grid will be much stronger in the future. 展开更多
关键词 pumped-storage power station Variable-speed pumped-storage technology CHEMICAL ENERGY storage Solarenergy storage system
下载PDF
Study on integrated development and hybrid operation mode of nuclear power plant and pumped-storage power station 被引量:6
3
作者 Haizheng Wang Caide Peng 《Global Energy Interconnection》 2019年第4期336-341,共6页
The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode... The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed. 展开更多
关键词 NUCLEAR power PLANT pumped-storage power station Integrated development HYBRID operation MODES
下载PDF
Equivalent Substitution Based Method for Calculation of Best Installed Capacity of Pumped Storage Power Station
4
作者 Jinming Li Tao Yu Huaizhi Wang 《Energy and Power Engineering》 2013年第3期46-51,共6页
This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system runnin... This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system running in two cases of whether the pumped storage power station is put into operation. The difference of the total coal consumption between the two cases is the peak load shifting benefit. Furthermore, we build load model and power generation model to calculate the benefit of emergency use and frequency modulation, which are the major projects of dynamic benefits. At last, on the premise of ensuring the system requirements, the developed method employs the maximum benefit of the unit capacity as the objective function to get the best installed capacity of pumped storage power station by simulations. Tests on a provincial power grid have shown that the developed method which combines of load characteristics, electric structure and other factors can get the best installed capacity of pumped storage power station easily and has a certain guiding significance for the planning and construction of the pumped storage power station. 展开更多
关键词 STATIC BENEFITS Dynamic BENEFITS pumped storage power station Best Installed Capacity
下载PDF
Providing Frequency Support of Hydro-Pumped Storage to Taiwan Power System with Wind Power Integration
5
作者 Yuan-Kang Wu G. W. Chang +1 位作者 Bo-Yu Hsiao Li-Tso Chang 《Smart Grid and Renewable Energy》 2016年第4期131-141,共11页
The combination of wind and pumped storage is a useful method to compensate the fluctuation of wind power generation, which would exploit the abundant wind potential and increase wind power penetration. Taiwan Power C... The combination of wind and pumped storage is a useful method to compensate the fluctuation of wind power generation, which would exploit the abundant wind potential and increase wind power penetration. Taiwan Power Company (TPC) develops renewable energy actively in recent years. Moreover, TPC has started planning a high penetration wind power system and building offshore wind farms around the coast of Zhangbin, Yunlin and Penghu. The target of the offshore wind power installed capacity is up to 3 GW by 2025. However, the integration of the large scale of wind power would give huge challenges to the system operator because wind is randomly characterized. In this study, after high penetration wind power is integrated, the impacts of system frequency and the dispatch of conventional units will be discussed. Additionally, the hybrid system combing wind power with pumped-storage will be planning to reduce the effect of system frequency. 展开更多
关键词 high Penetration Wind power Large-Scale Offshore Wind Farm pumped-storage Hybrid System
下载PDF
Optimal Dispatching Model Considering the Pumped Sto-rage Power Plant in Hunan
6
作者 Xinfan Jiang Dunnan Liu +1 位作者 Siyuan Zhang Wenlei Zhang 《Energy and Power Engineering》 2013年第4期608-611,共4页
This paper made a research on the Intelligent Optimization Operating Modeling of Pumped Storage Power Station in Hunan Power Grid. First it introduces the characteristics of Hunan power grid and analysis the practical... This paper made a research on the Intelligent Optimization Operating Modeling of Pumped Storage Power Station in Hunan Power Grid. First it introduces the characteristics of Hunan power grid and analysis the practical requirement of dispatching. Then it brings forward the intelligent optimization model and set up running model for pumped storage power station of Hei Mi-feng. At last, it introduces the application of pumped storage power station in Hunan power grid and proves the effectiveness of the optimization models. 展开更多
关键词 Intelligent Optimization DISPATCHING Model pumped storage power station
下载PDF
基于Microstation及奥维地图的抽水蓄能电站施工总布置设计 被引量:1
7
作者 陈俊 朱静萍 《云南水力发电》 2023年第3期219-222,共4页
抽水蓄能电站施工总布置设计涉及专业广、内容多、布置范围大,且设计周期不断被压缩,对工程设计人员要求逐渐提高,而传统的施工总布置设计方法效率较低,逐渐难以适应快节奏的设计工作。基于Microstation及奥维地图,利用多维设计手段以及... 抽水蓄能电站施工总布置设计涉及专业广、内容多、布置范围大,且设计周期不断被压缩,对工程设计人员要求逐渐提高,而传统的施工总布置设计方法效率较低,逐渐难以适应快节奏的设计工作。基于Microstation及奥维地图,利用多维设计手段以及GPS定位和导航功能,对抽水蓄能电站施工总布置设计进行研究。设计效果表明:基于Microstation及奥维地图的抽水蓄能电站施工总布置设计,提高了勘察设计效率及质量,减少了勘察设计失误,为抽水蓄能电站施工总布置设计提供了新思路。 展开更多
关键词 MICROstation 奥维地图 抽水蓄能电站 施工总布置
下载PDF
计及深度调峰的风-光-水-火-抽蓄多能源联网系统优化调度研究 被引量:2
8
作者 李卫国 丁硕 +1 位作者 安祎宁 蔡婷婷 《东北电力大学学报》 2024年第3期83-93,共11页
多种能源联网运行逐步成为未来电力系统发展的方向,多能源联网系统的优化调度是应对规模化新能源并网消纳的重要手段。文中建立了计及火电机组深度调峰成本的风-光-水-火-抽蓄联网系统成本模型和考虑调峰主动性的风-光-水-火-抽蓄联网... 多种能源联网运行逐步成为未来电力系统发展的方向,多能源联网系统的优化调度是应对规模化新能源并网消纳的重要手段。文中建立了计及火电机组深度调峰成本的风-光-水-火-抽蓄联网系统成本模型和考虑调峰主动性的风-光-水-火-抽蓄联网系统日前优化调度模型。针对多能源耦合系统结构复杂的情况,提出了分层优化调度的模型求解策略。上层模型以净负荷波动最小为优化目标,得到等效负荷曲线;下层模型根据上层模型的调度结果,以调峰运行的经济性最优和新能源弃电率最低为目标函数,计及调峰主动性,求解考虑火电机组深度调峰煤耗特性的含新能源系统的经济调度问题。仿真算例表明所建模型实现了多能源联网系统的互补运行,提升了火电机组的深度调峰能力,降低新能源弃电率和系统运行成本。 展开更多
关键词 多能源系统 抽水蓄能电站 深度调峰 优化调度 调峰主动性
下载PDF
抽蓄电站全库盆防渗水库渗流缺陷影响分析 被引量:1
9
作者 王润英 赵凯文 林思雨 《水电能源科学》 北大核心 2024年第3期105-109,共5页
针对抽蓄电站全库盆防渗水库土工膜缺陷导致水库渗流量产生变化的安全问题,结合陕西省某抽蓄电站水库库底土工膜防渗工程,采用单因素影响分析和多因素影响分析方法进行抽蓄电站全库盆防渗水库渗流缺陷影响分析。结果表明,水头大小、缺... 针对抽蓄电站全库盆防渗水库土工膜缺陷导致水库渗流量产生变化的安全问题,结合陕西省某抽蓄电站水库库底土工膜防渗工程,采用单因素影响分析和多因素影响分析方法进行抽蓄电站全库盆防渗水库渗流缺陷影响分析。结果表明,水头大小、缺陷大小、缺陷个数均正向影响抽蓄水库渗流量,而缺陷位置与抽蓄水库渗流量的相关性不明显。其中缺陷大小是影响抽蓄水库渗流量的主要因素,其次为水头大小,再次为缺陷个数。 展开更多
关键词 抽蓄电站全库盆防渗水库 土工膜缺陷 渗流量 缺陷影响分析
下载PDF
竖井式进出水口水力特性研究进展
10
作者 高学平 袁野 +1 位作者 朱洪涛 刘殷竹 《水力发电学报》 CSCD 北大核心 2024年第9期13-26,共14页
竖井式进出水口是抽水蓄能电站水道系统两端控制水流的常用进出水口型式之一。竖井式进出水口双向过流,水流在短距离内经历两次90°流向转变(水平-竖直-水平),流向变化剧烈,水力条件复杂,深入研究竖井式进出水口水力特性,进而优化... 竖井式进出水口是抽水蓄能电站水道系统两端控制水流的常用进出水口型式之一。竖井式进出水口双向过流,水流在短距离内经历两次90°流向转变(水平-竖直-水平),流向变化剧烈,水力条件复杂,深入研究竖井式进出水口水力特性,进而优化其体型结构,对抽水蓄能电站设计及施工具有重要意义。首先,介绍竖井式进出水口应用背景及体型特点,分析竖井式进出水口水力特性存在的问题;其次,对竖井式进出水口孔口流量分配、拦污栅断面流速分布、漩涡和水头损失等方面研究进展进行总结;最后,归纳了竖井式进出水口水力特性研究方法,探讨了今后研究应聚焦的主要方向。 展开更多
关键词 抽水蓄能电站 竖井式进出水口 水力特性 研究方法
下载PDF
侧式进/出水口各孔道流量分配差异及影响因素
11
作者 高学平 马一鸣 +1 位作者 刘殷竹 朱洪涛 《天津大学学报(自然科学与工程技术版)》 EI CAS CSCD 北大核心 2024年第6期633-641,共9页
对于抽水蓄能电站侧式进/出水口各孔道流量分配,现有设计规范规定进/出水口相邻中边孔道的流量不均匀程度不宜超过10%,但实际工程设计难以达到此要求.本文以某抽水蓄能电站侧式进/出水口为例,通过优化进/出水口各体型参数,利用数值模拟... 对于抽水蓄能电站侧式进/出水口各孔道流量分配,现有设计规范规定进/出水口相邻中边孔道的流量不均匀程度不宜超过10%,但实际工程设计难以达到此要求.本文以某抽水蓄能电站侧式进/出水口为例,通过优化进/出水口各体型参数,利用数值模拟方法研究各孔道流量等水力参数,重点分析分流墩布置对各孔道流量分配的影响及其规律,试图使进流工况和出流工况相邻中边孔道的流量不均匀程度均最小.研究表明,改变扩散段分流墩布置能有效改善流量不均匀程度.对于3墩4孔侧式进/出水口,相邻中边孔道的流量不均匀程度在出流工况下随中边孔宽度比增大而增大,在进流工况下随中边孔宽度比增大而减小;当中边孔宽度比增大且中墩后移距离减小时,出流工况和进流工况下的流量不均匀程度均减小.对于2墩3孔侧式进/出水口,相邻中边孔道的流量不均匀程度不论在出流工况下还是在进流工况下,均随中边孔宽度比增大呈先减小后增大的规律.优化后的3墩4孔侧式进/出水口的中边孔宽度比取0.228∶0.272,中墩后移距离取0.36D(D为隧洞直径),其相邻中边孔道的流量不均匀程度均较优,在出流工况下为18.47%~19.43%,在进流工况下为19.82%~19.83%;优化后的2墩3孔侧式进/出水口的中边孔宽度比取0.310∶0.345,其相邻中边孔道的流量不均匀程度均较优,在出流工况下为19.47%~19.63%,在进流工况下为18.66%~18.67%.相邻中边孔道的流量不均匀程度较难满足不宜超过10%的设计规范要求.研究成果将有助于《抽水蓄能电站设计规范》中关于进/出水口水力指标要求的完善. 展开更多
关键词 抽水蓄能电站 侧式进/出水口 体型优化 流量分配 数值模拟
下载PDF
NB/T 35009-2024修订内容解读及抽水蓄能电站标准化工作历程回顾
12
作者 高洁 岳蕾 朱方亮 《中国标准化》 2024年第15期148-152,共5页
本文回顾了抽水蓄能电站选点规划标准化工作历程,从90年代选点规划工作范围逐步扩展,一批代表性站点规划落地,选点规划思想逐渐成熟,首版标准于2003年编制完成。到2009年全国范围抽水蓄能电站选点规划系统性开展,继22个省(区、市)完成... 本文回顾了抽水蓄能电站选点规划标准化工作历程,从90年代选点规划工作范围逐步扩展,一批代表性站点规划落地,选点规划思想逐渐成熟,首版标准于2003年编制完成。到2009年全国范围抽水蓄能电站选点规划系统性开展,继22个省(区、市)完成选点工作,第二版标准修订完成,有效指导了实践工作。随着抽水蓄能电站选点规划的管理流程和技术路线不断成熟,选点规划已成为前期工作和开工建设的重要基础。双碳目标提出以来,抽水蓄能中长期发展规划为行业发展带来新机遇新挑战,第三版标准修订工作适时开展,区分功能定位、明确技术要求,积极响应了当前新能源和抽水蓄能行业高质量发展的要求。 展开更多
关键词 抽水蓄能电站选点规划 抽水蓄能发展规划 抽水蓄能电站技术标准体系
下载PDF
基于组合赋权-云模型的抽蓄电站高质量发展评价体系
13
作者 余恩海 佟佳颖 刘琳 《电力科学与工程》 2024年第5期64-71,共8页
为科学评价生产期抽蓄电站高质量发展现状、把握电站发展的薄弱环节、明确建设期及新投运电站发展方向,根据抽蓄电站定位及高质量发展内涵,经过2轮筛选,构建了包含服务电力系统稳定运行、经济、绿色、创新、共享5个一级指标以及18个二... 为科学评价生产期抽蓄电站高质量发展现状、把握电站发展的薄弱环节、明确建设期及新投运电站发展方向,根据抽蓄电站定位及高质量发展内涵,经过2轮筛选,构建了包含服务电力系统稳定运行、经济、绿色、创新、共享5个一级指标以及18个二级指标的评价指标体系;选用层次分析法–决策实验分析方法确定指标权重,运用云模型评价各电站高质量发展等级。最后,选取A抽蓄电站为算例验证评价体系适用性。评价结果显示,该电站服务电力系统稳定运行、绿色和共享3个指标表现均为良好,经济和创新指标表现为中等,与电站实际运行情况相符合。该验证结果表明,采用上述方法构建的评价指标体系有很好的适用性。 展开更多
关键词 抽水蓄能电站 高质量发展评价 层次分析法 决策实验室分析法 云模型 新型电力系统
下载PDF
抽水蓄能电站防沙措施研究
14
作者 赵海镜 张捷 +2 位作者 张防修 李晓伟 程涛 《水电与抽水蓄能》 2024年第4期7-13,共7页
以典型抽水蓄能电站为研究对象,开展了水库防沙措施研究。针对复杂工程条件,在分析各种防沙布置措施的基础上,考虑以沉代拦、导沉结合,提出导沙堤和尾水明渠相结合的防沙布置型式。经过数值模拟和物理模型验证,该型式减少过机泥沙效果明... 以典型抽水蓄能电站为研究对象,开展了水库防沙措施研究。针对复杂工程条件,在分析各种防沙布置措施的基础上,考虑以沉代拦、导沉结合,提出导沙堤和尾水明渠相结合的防沙布置型式。经过数值模拟和物理模型验证,该型式减少过机泥沙效果明显,水力学参数合理。研究成果可为类似工程规划、设计和运行提供参考。 展开更多
关键词 抽水蓄能电站 防沙措施 导沉结合 导沙堤 尾水明渠
下载PDF
宽式防旋墩环形堰竖井水力特性分析
15
作者 姜治兵 蒋哲宇 +1 位作者 韩松林 杨晓红 《人民长江》 北大核心 2024年第9期179-186,共8页
目前许多拟建抽蓄工程泄洪洞的环形堰竖井入口设置了新型宽式防旋墩,以消除喉口处由不可控漩流引起的呛水等不利流态,而宽式防旋墩环形堰竖井的水气特性与以往采用起旋墩和窄式防旋墩的竖井存在较大差异,业内对其认识尚不清晰。以石台... 目前许多拟建抽蓄工程泄洪洞的环形堰竖井入口设置了新型宽式防旋墩,以消除喉口处由不可控漩流引起的呛水等不利流态,而宽式防旋墩环形堰竖井的水气特性与以往采用起旋墩和窄式防旋墩的竖井存在较大差异,业内对其认识尚不清晰。以石台抽水蓄能电站下水库泄洪洞的竖井作为研究对象,采用物理模型试验与数值模拟相结合的手段,分析了流态、流速、压力、消能率等水力指标。研究结果表明:宽式防旋墩引导水流平顺进入竖井形成脱壁流,其尾部可形成顺畅的进气通道,空气经此通道可充分进入竖井以保持井内流态与压力的稳定;新型竖井过流能力满足要求,各部位流速、压力分布正常,总消能率达85%以上;宽式防旋墩可消除不可控漩流导致的呛水现象并引导水流在竖井内形成脱壁流态,使竖井壁面免于空蚀破坏;墩尾通气量足够时,可取消通气管及环形堰与竖井结合部突扩体型,简化工程布置。相关经验可供类似抽蓄电站工程的泄洪洞竖井设计参考。 展开更多
关键词 宽式防旋墩 环形堰竖井 脱壁流 水力特性 消能率 石台抽水蓄能电站
下载PDF
接立面转弯隧洞的侧式出水口水力特性
16
作者 高学平 魏南疆 刘殷竹 《长江科学院院报》 CSCD 北大核心 2024年第7期94-102,共9页
对于接立面转弯隧洞的侧式出水口,立面转弯隧洞的转弯段将直接影响侧式出水口的水力特性。若立面转弯隧洞参数设计不合理,极易导致侧式出水口内部发生流动分离。选取RSM紊流模型,针对接立面转弯隧洞的侧式出水口进行数值模拟,探究立面... 对于接立面转弯隧洞的侧式出水口,立面转弯隧洞的转弯段将直接影响侧式出水口的水力特性。若立面转弯隧洞参数设计不合理,极易导致侧式出水口内部发生流动分离。选取RSM紊流模型,针对接立面转弯隧洞的侧式出水口进行数值模拟,探究立面转弯隧洞曲率半径R、弯道后直隧洞长度L及转弯角度α等参数对出水口水力特性的影响规律,并对隧洞内流动过程进行了讨论。增加立面转弯隧洞曲率半径R和弯道后直隧洞长度L能显著改善出水口的水力指标。当曲率半径R≥12 D(D为隧洞直径)、弯道后直隧洞长度L≥16 D时,侧式出水口内部无明显流动分离,拦污栅断面流速分布均匀且无反向流速区。研究成果将对抽水蓄能电站侧式进/出水口的设计提供指导。 展开更多
关键词 抽水蓄能电站 侧式出水口 立面转弯隧洞 水力特性 数值模拟
下载PDF
两条轴线平行布置的泄洪洞出口联合消能工布置形式研究
17
作者 李伟 崔笑 +2 位作者 吴吉才 谭盛凛 韩立军 《水力发电》 CAS 2024年第7期43-48,共6页
针对芝瑞抽水蓄能电站下水库两条轴线平行布置的泄洪排沙洞,原设计方案出口联合消能工存在消能效果差的问题,通过选用单体正态水工模型,基于水力相似准则进行水工模型试验,对出口联合消能工的布置形式进行研究。试验实测数据表明,最终... 针对芝瑞抽水蓄能电站下水库两条轴线平行布置的泄洪排沙洞,原设计方案出口联合消能工存在消能效果差的问题,通过选用单体正态水工模型,基于水力相似准则进行水工模型试验,对出口联合消能工的布置形式进行研究。试验实测数据表明,最终推荐方案可有效提高消能效率、改善水流流态、优化设计方案,并达到了减少工程投资的目的,有效地解决了轴线平行布置的泄洪洞出口联合消能问题。 展开更多
关键词 轴线平行布置 泄洪洞 联合消能工 布置形式 模型试验 芝瑞抽水蓄能电站
下载PDF
含废旧矿井抽蓄电站的源-荷-储协同控制调频研究
18
作者 骆钊 田肖 +3 位作者 莫熙 聂灵峰 沈鑫 雷元庆 《电力系统保护与控制》 EI CSCD 北大核心 2024年第8期134-144,共11页
针对新能源在电网中渗透率不断提高导致系统调频容量和频率响应能力不足的问题,提出一种含废旧矿井抽蓄电站的源-荷-储协同控制调频方法。首先,建立了电解铝工业负荷、废旧矿井抽蓄电站和超级电容频率响应模型。然后,基于模型预测控制理... 针对新能源在电网中渗透率不断提高导致系统调频容量和频率响应能力不足的问题,提出一种含废旧矿井抽蓄电站的源-荷-储协同控制调频方法。首先,建立了电解铝工业负荷、废旧矿井抽蓄电站和超级电容频率响应模型。然后,基于模型预测控制理论,以系统状态量和控制量的加权函数最小为目标,设计区域信息互动的分布式模型预测控制器,并提出含废旧矿井抽蓄电站的源-荷-储协同控制调频方法。最后,将分布式模型预测控制器应用在所提源-荷-储协同控制方法中,并在改进的IEEE标准两区域LFC模型中进行仿真。结果表明所提方法可以缩短频率恢复时间,减小最大频差值,改善系统调频动态性能。 展开更多
关键词 负荷频率控制 废旧矿井抽蓄电站 超级电容 分布式模型预测控制
下载PDF
抽蓄电站无压隧洞交叉区体型优化试验研究
19
作者 田静 顾长宽 +1 位作者 郭汉驰 薛海 《水电能源科学》 北大核心 2024年第10期115-117,38,共4页
交叉无压隧洞交汇区域水流的水力特性复杂,无压隧洞交叉区体型及交汇口水流水力特性的研究对确保水利枢纽的安全运行具有重要的工程意义。基于物理模型试验,对某抽水蓄能电站下水库高落差泄洪排沙洞和放空洞交叉区体型进行优化,最终确... 交叉无压隧洞交汇区域水流的水力特性复杂,无压隧洞交叉区体型及交汇口水流水力特性的研究对确保水利枢纽的安全运行具有重要的工程意义。基于物理模型试验,对某抽水蓄能电站下水库高落差泄洪排沙洞和放空洞交叉区体型进行优化,最终确定圆弧连接+交叉角21°的交叉区体型。对比分析圆弧连接+交叉角21°的交叉区优化体型下特征试验工况的水力特性。结果表明,6种特征试验工况下,泄洪排沙洞和放空洞交叉口及下游均为急流,明流泄洪且流态较稳定,均在交汇口下游右边直墙处形成最大水深,水深低于直墙高度,满足水面线不宜超过直墙范围的要求。 展开更多
关键词 交叉无压隧洞 体型优化 交汇水流 抽水蓄能电站 模型试验
下载PDF
土工膜与沥青混凝土结构新型接头模型试验研究
20
作者 何欣 汪正兴 +1 位作者 马秀伟 屈洁 《西北水电》 2024年第5期71-76,86,共7页
为研究土工膜与沥青混凝土结构之间的接头连接方式,基于室内模型试验,从土工膜与沥青混凝土之间的粘结强度、接头适应变形能力、接头防渗性能3个方面论证土工膜与沥青混凝土面板接头的可靠性,提出了土工膜与沥青混凝土结构新型接头连接... 为研究土工膜与沥青混凝土结构之间的接头连接方式,基于室内模型试验,从土工膜与沥青混凝土之间的粘结强度、接头适应变形能力、接头防渗性能3个方面论证土工膜与沥青混凝土面板接头的可靠性,提出了土工膜与沥青混凝土结构新型接头连接方式。结果表明:采用SK手刮聚脲将土工膜粘贴至沥青混凝土上,粘结的强度随环境温度降低而升高,5℃时,粘结强度可达到1.0 MPa;通过在接头部位设置鼓包,可以吸收接头变形;HDPE膜与沥青混凝土连接板的接头可以适应上下错动7.8 cm+张开5 cm+剪切7.2 cm的位移;施加变形后对接头进行抗渗试验,接头在0.45 MPa的水压力下可以保持防渗性能。采用SK手刮聚脲将土工膜与沥青混凝土直接粘结,采取合理的施工工艺可保证接头连接的可靠性和适应性,对推广土工膜防渗具有积极意义。 展开更多
关键词 土工膜 沥青混凝土 抽水蓄能电站 接头
下载PDF
上一页 1 2 117 下一页 到第
使用帮助 返回顶部