After the North China grid and the Central China grid get into connection with the UHVAC demonstration, a new phenomenon is discovered according to some simulations. That is, the faults at the remote end of the UHV in...After the North China grid and the Central China grid get into connection with the UHVAC demonstration, a new phenomenon is discovered according to some simulations. That is, the faults at the remote end of the UHV interconnected grid will result in significant power fluctuation and voltage drop on the UHV transmission line and even system splitting. But the faults near the UHV line only have marginal effects. Further, the simulation results also indicate that the short-circuit current of the buses near the UHV line is larger than that of the buses far away from the UHV line. This phenomenon is divergent from the traditional view. In this paper, the detail will be introduced, and the factors influencing the system stability after faults are presented and analyzed. The results indicate that transmission power of the UHV line and of the lines between the remote end and the major grid influence the fluctuation on UHV line. The load model and the grid structure of the remote end also have effect on it. Finally, corresponding control scheme is presented to improve the operation conditions of the UHV interconnected grid and ensure its security and stability.展开更多
The acceleration grid power supply(AGPS)rated 200 kV/25 A is a key component devoted to supply the acceleration grids of the China fusion engineering test reactor negative-ion-based neutral beam injector(N-NBI)prototy...The acceleration grid power supply(AGPS)rated 200 kV/25 A is a key component devoted to supply the acceleration grids of the China fusion engineering test reactor negative-ion-based neutral beam injector(N-NBI)prototype system.This paper focused on the design and control of the AGPS conversion system(AGPS-CS),with emphasis on the requirement of the wide range output voltage and rise time.A voltage regulation switch at the front of step-down transformer is applied to optimize the grid current and DC-link voltage.Moreover,a new feedforward control strategy with piecewise PI compensator is proposed to improve the characteristics of AGPS.The simulation results of the proposed AGPS-CS are presented,proving the performance of the power supply to achieve the desired requirements.展开更多
China needs to develop a strong national power grid which takes ultra-high-voltage (UHV) transmission systems as its core. The grid is expected to adopt 1000-kV-class AC and ± 800-kV DC transmission systems. In v...China needs to develop a strong national power grid which takes ultra-high-voltage (UHV) transmission systems as its core. The grid is expected to adopt 1000-kV-class AC and ± 800-kV DC transmission systems. In view of significant achievements in technological research and considerable progress in UHV manufacturing technology, China is capable of developing UHV systems. In order to promote the construction of UHV systems,China Electric Power Research Institute and other institutions have initiated first-phase research activities of UHV transmission technologies. The main contents involve research on UHV transmission technology and its economy,developing and manufacturing abilities on UHV equipment, prospective of UHV network frame and selection of demonstration projects, etc.展开更多
提出一种基于空间矢量调制直接功率控制(direct power control with space vector modulation,DPC-SVM)的直接虚拟功率控制算法。此控制算法扩展了现有DPC的适用范围,在电压源换流器(voltage source converter,VSC)交流侧开路及交流测...提出一种基于空间矢量调制直接功率控制(direct power control with space vector modulation,DPC-SVM)的直接虚拟功率控制算法。此控制算法扩展了现有DPC的适用范围,在电压源换流器(voltage source converter,VSC)交流侧开路及交流测电流为零时,通过虚拟功率保持DPC控制模块的反馈回路,使DPC能够在VSC换流器并网前控制交流侧输出电压幅值和频率稳定并与电网接入点保持一致。此算法计算过程简单,使用大部分原有DPC-SVM控制模块,并且与DPC-SVM结构保持一致,从而使VSC换流器并网前后控制算法切换平滑。该文分别利用PSCAD/EMTDC软件平台和实验室硬件实验电路进行仿真和电路实验,验证提出的控制算法的正确性和有效性。展开更多
随着大量新能源场站接入交直流混联电网,系统的静态电压稳定裕度(static voltage stability margin,SVSM)水平具有很大的不确定性,需要研究考虑新能源场站高阶不确定性的交直流混联电网SVSM计算方法。针对此问题,首先建立了交直流混联电...随着大量新能源场站接入交直流混联电网,系统的静态电压稳定裕度(static voltage stability margin,SVSM)水平具有很大的不确定性,需要研究考虑新能源场站高阶不确定性的交直流混联电网SVSM计算方法。针对此问题,首先建立了交直流混联电网SVSM计算模型,模型中考虑了直流换流站控制方式随负荷增长的切换;采用概率盒模型描述风速与光照强度的随机波动,提出了改进区间半不变量法以获得更准确的SVSM概率盒,该方法通过K-means++聚类算法将随机变量样本划分为多个波动范围较小的样本集,以降低半不变量的线性化计算带来的误差;并结合Gram-Charlier级数展开和概率加权和计算得到考虑新能源场站高阶不确定性的系统SVSM概率盒。通过对修改的IEEE-39节点交直流系统和南方电网两个算例的分析,并与区间半不变量法和双层蒙特卡洛法比较,验证了所提出方法获得的SVSM概率盒具有较高的计算精度和效率。展开更多
文摘After the North China grid and the Central China grid get into connection with the UHVAC demonstration, a new phenomenon is discovered according to some simulations. That is, the faults at the remote end of the UHV interconnected grid will result in significant power fluctuation and voltage drop on the UHV transmission line and even system splitting. But the faults near the UHV line only have marginal effects. Further, the simulation results also indicate that the short-circuit current of the buses near the UHV line is larger than that of the buses far away from the UHV line. This phenomenon is divergent from the traditional view. In this paper, the detail will be introduced, and the factors influencing the system stability after faults are presented and analyzed. The results indicate that transmission power of the UHV line and of the lines between the remote end and the major grid influence the fluctuation on UHV line. The load model and the grid structure of the remote end also have effect on it. Finally, corresponding control scheme is presented to improve the operation conditions of the UHV interconnected grid and ensure its security and stability.
基金This work is supported by the National Key R&D Program of China under Grant No.2017YFE0300104National Natural Science Foundation of China(Nos.51707073 and 51821005).
文摘The acceleration grid power supply(AGPS)rated 200 kV/25 A is a key component devoted to supply the acceleration grids of the China fusion engineering test reactor negative-ion-based neutral beam injector(N-NBI)prototype system.This paper focused on the design and control of the AGPS conversion system(AGPS-CS),with emphasis on the requirement of the wide range output voltage and rise time.A voltage regulation switch at the front of step-down transformer is applied to optimize the grid current and DC-link voltage.Moreover,a new feedforward control strategy with piecewise PI compensator is proposed to improve the characteristics of AGPS.The simulation results of the proposed AGPS-CS are presented,proving the performance of the power supply to achieve the desired requirements.
文摘China needs to develop a strong national power grid which takes ultra-high-voltage (UHV) transmission systems as its core. The grid is expected to adopt 1000-kV-class AC and ± 800-kV DC transmission systems. In view of significant achievements in technological research and considerable progress in UHV manufacturing technology, China is capable of developing UHV systems. In order to promote the construction of UHV systems,China Electric Power Research Institute and other institutions have initiated first-phase research activities of UHV transmission technologies. The main contents involve research on UHV transmission technology and its economy,developing and manufacturing abilities on UHV equipment, prospective of UHV network frame and selection of demonstration projects, etc.
文摘提出一种基于空间矢量调制直接功率控制(direct power control with space vector modulation,DPC-SVM)的直接虚拟功率控制算法。此控制算法扩展了现有DPC的适用范围,在电压源换流器(voltage source converter,VSC)交流侧开路及交流测电流为零时,通过虚拟功率保持DPC控制模块的反馈回路,使DPC能够在VSC换流器并网前控制交流侧输出电压幅值和频率稳定并与电网接入点保持一致。此算法计算过程简单,使用大部分原有DPC-SVM控制模块,并且与DPC-SVM结构保持一致,从而使VSC换流器并网前后控制算法切换平滑。该文分别利用PSCAD/EMTDC软件平台和实验室硬件实验电路进行仿真和电路实验,验证提出的控制算法的正确性和有效性。
文摘随着大量新能源场站接入交直流混联电网,系统的静态电压稳定裕度(static voltage stability margin,SVSM)水平具有很大的不确定性,需要研究考虑新能源场站高阶不确定性的交直流混联电网SVSM计算方法。针对此问题,首先建立了交直流混联电网SVSM计算模型,模型中考虑了直流换流站控制方式随负荷增长的切换;采用概率盒模型描述风速与光照强度的随机波动,提出了改进区间半不变量法以获得更准确的SVSM概率盒,该方法通过K-means++聚类算法将随机变量样本划分为多个波动范围较小的样本集,以降低半不变量的线性化计算带来的误差;并结合Gram-Charlier级数展开和概率加权和计算得到考虑新能源场站高阶不确定性的系统SVSM概率盒。通过对修改的IEEE-39节点交直流系统和南方电网两个算例的分析,并与区间半不变量法和双层蒙特卡洛法比较,验证了所提出方法获得的SVSM概率盒具有较高的计算精度和效率。