期刊文献+
共找到17,400篇文章
< 1 2 250 >
每页显示 20 50 100
Remaining oil distribution characteristics in an oil reservoir with ultra-high water-cut
1
作者 Hongmin Yu Youqi Wang +4 位作者 Li Zhang Qingxin Zhang Zhenhai Guo Benzhe Wang Tao Sun 《Energy Geoscience》 EI 2024年第1期219-223,共5页
An accurate mapping and understanding of remaining oil distribution is very important for water control and stabilize oil production of mature oilfields in ultra-high water-cut stage.Currently,the Tuo-21 Fault Block o... An accurate mapping and understanding of remaining oil distribution is very important for water control and stabilize oil production of mature oilfields in ultra-high water-cut stage.Currently,the Tuo-21 Fault Block of the Shengtuo Oilfield has entered the stage of ultra-high water cut(97.2%).Poor adaptability of the well pattern,ineffective water injection cycle and low efficiency of engineering measures(such as workover,re-perforation and utilization of high-capacity pumps)are the significant problems in the ultra-high water-cut reservoir.In order to accurately describe the oil and water flow characteristics,relative permeability curves at high water injection multiple(injected pore volume)and a semiquantitative method is applied to perform fine reservoir simulation of the Sand group 3e7 in the Block.An accurate reservoir model is built and history matching is performed.The distribution characteristics of remaining oil in lateral and vertical directions are quantitatively simulated and analyzed.The results show that the numerical simulation considering relative permeability at high injection multiple can reflect truly the remaining oil distribution characteristics after water flooding in an ultrahigh water-cut stage.The distribution of remaining oil saturation can be mapped more accurately and quantitatively by using the‘four-points and five-types’classification method,providing a basis for potential tapping of various remaining oil types of oil reservoirs in late-stage of development with high water-cut. 展开更多
关键词 Ultra-high water-cut high water injection multiple Four-points and five-types Numerical simulation Remaining oil distribution
下载PDF
Experimental investigation on using CO_(2)/H_(2)O emulsion with high water cut in enhanced oil recovery
2
作者 Xi-Dao Wu Peng Xiao +2 位作者 Bei Liu Guang-Jin Chen Jian-Hua Pang 《Petroleum Science》 SCIE EI CAS CSCD 2024年第2期974-986,共13页
CO_(2) emulsions used for EOR have received a lot of interest because of its good performance on CO_(2)mobility reduction.However,most of them have been focusing on the high quality CO_(2) emulsion(high CO_(2) fractio... CO_(2) emulsions used for EOR have received a lot of interest because of its good performance on CO_(2)mobility reduction.However,most of them have been focusing on the high quality CO_(2) emulsion(high CO_(2) fraction),while CO_(2) emulsion with high water cut has been rarely researched.In this paper,we carried out a comprehensive experimental study of using high water cut CO_(2)/H_(2)O emulsion for enhancing oil recovery.Firstly,a nonionic surfactant,alkyl glycosides(APG),was selected to stabilize CO_(2)/H_(2)O emulsion,and the corresponding morphology and stability were evaluated with a transparent PVT cell.Subsequently,plugging capacity and apparent viscosity of CO_(2)/H_(2)O emulsion were measured systematically by a sand pack displacement apparatus connected with a 1.95-m long capillary tube.Furthermore,a high water cut(40 vol%) CO_(2)/H_(2)O emulsion was selected for flooding experiments in a long sand pack and a core sample,and the oil recovery,the rate of oil recovery,and the pressure gradients were analyzed.The results indicated that APG had a good performance on emulsifying and stabilizing CO_(2) emulsion.An inversion from H_(2)O/CO_(2) emulsion to CO_(2)/H_(2)O emulsion with the increase in water cut was confirmed.CO_(2)/H_(2)O emulsions with lower water cuts presented higher apparent viscosity,while the optimal plugging capacity of CO_(2)/H_(2)O emulsion occurred at a certain water cut.Eventually,the displacement using CO_(2)/H_(2)O emulsion provided 18.98% and 13.36% additional oil recovery than that using pure CO_(2) in long sand pack and core tests,respectively.This work may provide guidelines for EOR using CO_(2) emulsions with high water cut. 展开更多
关键词 CO_(2)/H_(2)O emulsion high water cut CO_(2) mobility control Enhanced oil recovery
下载PDF
Optimization of Injection Parameters for Profile Control and Flooding in an Oilfield during High Water Cut Period
3
作者 Meinan Wang Hui Cai +2 位作者 Xiaoqi Chen Junting Zhang Yue Xie 《Journal of Geoscience and Environment Protection》 2023年第11期73-81,共9页
In order to improve the effect of water control and oil stabilization during high water cut period, a mathematical model of five point method well group was established with the high water cut well group of an Oilfiel... In order to improve the effect of water control and oil stabilization during high water cut period, a mathematical model of five point method well group was established with the high water cut well group of an Oilfield as the target area, the variation law of water cut and recovery factor of different injection parameters was analyzed, and the optimization research of injection parameters of polymer enhanced foam flooding was carried out. The results show that the higher the injection rate, the lower the water content curve, and the higher the oil recovery rate. As the foam defoamed when encountering oil, when the injection time was earlier than 80% of water cut, the later the injection time was, the better the oil displacement effect would be. When the injection time was later than 80% of water cut, the later the injection time was, the worse the oil displacement effect would be. The larger the injection volume, the lower the water content curve and the higher the recovery rate. After the injection volume exceeded 0.2 PV, the amplitude of changes in water content and recovery rate slowed down. The optimal injection parameters of profile control agent for high water content well group in Oilfield A were: injection rate of 15 m<sup>3</sup>/d, injection timing of 80% water content, and injection volume of 0.2 PV. 展开更多
关键词 high water Cut Period Profile Control Injection Rate Injection Timing Injection Volume
下载PDF
High Water Resistance and Enhanced Mechanical Properties of Bio-Based Waterborne Polyurethane Enabled by in-situ Construction of Interpenetrating Polymer Network
4
作者 Henghui Deng Jingyi Lu +5 位作者 Dunsheng Liang Xiaomin Wang Tongyao Wang Weihao Zhang Jing Wang Chaoqun Zhang 《Journal of Renewable Materials》 SCIE EI 2023年第3期1209-1222,共14页
In this study,acrylic acid was used as a neutralizer to prepare bio-based WPU with an interpenetrating polymer network structure by thermally induced free radical emulsion polymerization.The effects of the content of ... In this study,acrylic acid was used as a neutralizer to prepare bio-based WPU with an interpenetrating polymer network structure by thermally induced free radical emulsion polymerization.The effects of the content of acrylic acid on the properties of the resulting waterborne polyurethane-poly(acrylic acid)(WPU-PAA)dispersion and the films were systematically investigated.The results showed that the cross-linking density of the interpenetrating network polymers was increased and the interlocking structure of the soft and hard phase dislocations in the molecular segments of the double networks was tailored with increasing the content of acrylic acid,leading to enhancement of the mechanical properties and water resistance of WPU-PAA films.Notably,with the increase in content of acrylic acid,the tensile strength,Young’s modulus,and toughness of the WPU-PAA-110 film increased by 3 times,and 8 times,and 2.4 times compared with WPU-PAA-80,respectively.The WPU-PAA-100 film showed the best water resistance,and the water absorption rate at 96 h was only 3.27%.This work provided a new design scheme for constructing bio-based WPU materials with excellent properties. 展开更多
关键词 Bio-based waterborne polyurethane interpenetrating polymer network highly water resistance superior mechanical performance
下载PDF
Biodrying of municipal solid waste with high water content by combined hydrolytic-aerobic technology 被引量:10
5
作者 ZHANG Dongqing HE Pinjing +2 位作者 SHAO Liming JIN Taifeng HAN Jingyao 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2008年第12期1534-1540,共7页
The high water content of municipal solid waste(MSW)will reduce the effciency of mechanical sorting,consequently unfavorable for beneficial utilization.In this study,a combined hydrolytic-aerobic biodrying technology ... The high water content of municipal solid waste(MSW)will reduce the effciency of mechanical sorting,consequently unfavorable for beneficial utilization.In this study,a combined hydrolytic-aerobic biodrying technology was introduced to remove water from MSW.The total water removals were proved to depend on the ventilation frequency and the temporal span in the hydrolytic stage. The ventilation frequency of 6 times/d was preferable in the hydrolytic stage.The hydrolytic span should not be prolonged more than ... 展开更多
关键词 BIODRYING high water content HYDROLYSIS AERATION municipal solid waste extracellular enzyme
下载PDF
Key technologies for construction of Jinping traffic tunnel with an extremely deep overburden and a high water pressure 被引量:6
6
作者 Shougen CHEN Heng ZHANG Xinrong TAN Liang CHEN 《Journal of Modern Transportation》 2011年第2期94-103,共10页
Jinping traffic tunnel is one of the deepest traffic tunnels in the world with a maximum overburden of 2 375 m and the overburden over 73% of its total length is larger than 1 500 m. The tunnel is 17.5 km long and des... Jinping traffic tunnel is one of the deepest traffic tunnels in the world with a maximum overburden of 2 375 m and the overburden over 73% of its total length is larger than 1 500 m. The tunnel is 17.5 km long and designed to provide a shortcut road between two hydropower stations: Jinping I and Jinping II of the Jinping Hydropower Project, located on Yalong River, Liangshan State, Sichuan Province, China. The tunnel is so deep that building any shafts is impossible. The construction starts from both ends (east and west ends), and the construction length from the west end is 10 km with a blind heading. This paper deals with an overview of this project and analysis of the engineering features, as well as key technologies developed and applied during the construction, including geological prediction, rock burst prevention under a super high in-situ stress, sealing of groundwater with a high pressure and big flow rate, ventilation for a blind heading of 10 km, wet spraying of shotcrete at zones of rock burst and rich water, etc. The application of the new technologies to the construction achieved a high quality tunnel within the contract period. 展开更多
关键词 key technologies Jinping traffic tunnel extremely deep overburden high water pressure
下载PDF
High Water Content Material Based on Ba-Bearing Sulphoaluminate Cement 被引量:3
7
作者 常钧 《Journal of Wuhan University of Technology(Materials Science)》 SCIE EI CAS 2005年第3期88-90,共3页
A new type of high water content material which is made up of two pastes is prepared, one is refute from lime and gypsum, and another is based on Ba-bearing sulphoaluminate cement. It has excellent properties such as ... A new type of high water content material which is made up of two pastes is prepared, one is refute from lime and gypsum, and another is based on Ba-bearing sulphoaluminate cement. It has excellent properties such as slow single paste solidifing ,fust double pustes solidifing ,fast coagulating and hardening, high early strength, good suspeasion property at high W/C ratio and low cost. Meanwhile, the properties and hydration mechanism of the material were analyzed by using XRD, DTA- TG and SEM. The hydrated products of new type of high water content material are Ba-bearing ettringite, BaSO4 , aluminum gel and C-S-H gel. 展开更多
关键词 Ba- bearing sulphoaluminate cement high water content material filling material BAO barium industrial waste residue
下载PDF
Layer regrouping for water-flooded commingled reservoirs at a high water-cut stage 被引量:2
8
作者 Chuan-Zhi Cui Jian-Peng Xu +3 位作者 Duan-Ping Wang Zhi-Hong Liu Ying-song Huang Zheng-Ling Geng 《Petroleum Science》 SCIE CAS CSCD 2016年第2期272-279,共8页
Layer regrouping is to divide all the layers into several sets of production series according to the physical properties and recovery percent of layers at high water-cut stage, which is an important technique to impro... Layer regrouping is to divide all the layers into several sets of production series according to the physical properties and recovery percent of layers at high water-cut stage, which is an important technique to improve oil recovery for high water-cut multilayered reservoirs. Dif- ferent regroup scenarios may lead to different production performances. Based on unstable oil-water flow theory, a multilayer commingled reservoir simulator is established by modifying the production split method. Taking into account the differences of layer properties, including per- meability, oil viscosity, and remaining oil saturation, the pseudo flow resistance contrast is proposed to serve as a characteristic index of layer regrouping for high water-cut multilayered reservoirs. The production indices of multi- layered reservoirs with different pseudo flow resistances are predicted with the established model in which the data are taken from the Shengtuo Oilfield. Simulation results show that the pseudo flow resistance contrast should be less than 4 when the layer regrouping is implemented. The K-means clustering method, which is based on the objec- tive function, is used to automatically carry out the layer regrouping process according to pseudo flow resistances. The research result is applied to the IV-VI sand groups of the second member of the Shahejie Formation in the Shengtuo Oilfield, a favorable development performance is obtained, and the oil recovery is enhanced by 6.08 %. 展开更多
关键词 water-flooded reservoirs Layer regrouping.Flow resistance - high water cut Reservoir simulation
下载PDF
Wall Sticking of High Water-Cut, Highly Viscous and High Gel-Point Crude Oil Transported at Low Temperatures 被引量:20
9
作者 Zheng Haimin Huang Qiyu +1 位作者 Wang Changhui Wang Xi 《China Petroleum Processing & Petrochemical Technology》 SCIE CAS 2015年第4期20-29,共10页
Some crude oils with high water cut have the capability to flow below the oil gel point, while the oil particles adhere to the pipe wall in the form of paste, also called "wall sticking". Wall sticking is a ... Some crude oils with high water cut have the capability to flow below the oil gel point, while the oil particles adhere to the pipe wall in the form of paste, also called "wall sticking". Wall sticking is a serious problem during the pipeline transportation, leading to partial or total blockage of the pipeline and energy wastage. In this paper, a series of laboratory flow loop experiments were conducted to observe the wall sticking characteristics of crude oil with high water cut, high viscosity and high gel point at low transportation temperatures. The effects of shear stress and water cut on the wall sticking rate and occurrence temperature were investigated. Experimental results indicated that the wall sticking rate and occurrence temperature were lower under stronger shear stress and higher water cut conditions. A criterion of wall sticking occurrence temperature(WSOT) and a regression model of wall sticking rate were then established. Finally, the software was developed to calculate the pressure drop along the pipelines of crude oils with high water-cut. It was able to predict the wall sticking thickness of gelled oil and then calculate the pressure drop along the pipelines. A typical case study indicated that the prediction results obtained from the software were in agreement with actual measured values. 展开更多
关键词 wall sticking high viscosity high water cut flow loop regression model
下载PDF
Application of New Water Flooding Characteristic Curve in the High Water-Cut Stage of an Oilfield 被引量:1
10
作者 Xi Zhang Changquan Wang +1 位作者 Hua Wu Xu Zhao 《Fluid Dynamics & Materials Processing》 EI 2022年第3期661-677,共17页
The oil production predicted by means of the conventional water-drive characteristic curve is typically affected by large deviations with respect to the actual value when the so-called high water-cut stage is entered.... The oil production predicted by means of the conventional water-drive characteristic curve is typically affected by large deviations with respect to the actual value when the so-called high water-cut stage is entered.In order to solve this problem,a new characteristic relationship between the relative permeability ratio and the average water saturation is proposed.By comparing the outcomes of different matching methods,it is verified that it can well reflect the variation characteristics of the relative permeability ratio curve.Combining the new formula with a reservoir engineering method,two new formulas are derived for the water flooding characteristic curve in the high water-cut stage.Their practicability is verified by using the production data of Mawangmiao and Xijiakou blocks.The results show that the error between the predicted cumulative oil production and production data of the two new water drive characteristic curves is less than the error between the B-type water drive characteristic curve and the other two water drive characteristic curves.It is concluded that the two new characteristic curves can be used to estimate more accurately the recoverable reserves,the final recovery and to estimate the effects of water flooding. 展开更多
关键词 water flooding characteristic curve high water cut period production dynamic prediction recoverable reserves water flooding
下载PDF
Flow Characteristics of Crude Oil with High Water Fraction during Non-heating Gathering and Transportation 被引量:1
11
作者 LüYuling Tan Hao +2 位作者 Li Jiao Yang Donghai Xu Peiyang 《China Petroleum Processing & Petrochemical Technology》 SCIE CAS 2021年第1期88-97,共10页
In order to ensure the safety of the non-heating gathering and transportation processes for high water fraction crude oil,the effect of temperature,water fraction,and flow rate on the flow characteristics of crude oil... In order to ensure the safety of the non-heating gathering and transportation processes for high water fraction crude oil,the effect of temperature,water fraction,and flow rate on the flow characteristics of crude oil with high water fraction was studied in a flow experimental system of the X Oilfield.Four distinct flow patterns were identified by the photographic and local sampling techniques.Especially,three new flow patterns were found to occur below the pour point of crude oil,including EW/O&W stratified flow with gel deposition,EW/O&W intermittent flow with gel deposition,and water single-phase flow with gel deposition.Moreover,two characteristic temperatures,at which the change rate of pressure drop had changed obviously,were found during the change of pressure drop.The characteristic temperature of the first congestion of gel deposition in the pipeline was determined to be the safe temperature for the non-heating gathering and transportation of high water cut crude oil,while the pressure drop reached the peak at this temperature.An empirical formula for the safe temperature was established for oil-water flow with high water fraction/low fluid production rate.The results can serve as a guide for the safe operation of the non-heating gathering and transportation of crude oil in high water fraction oilfields. 展开更多
关键词 crude oil with high water fraction non-heating gathering and transportation flow pattern pressure drop safe temperature
下载PDF
Study on Filling Cross-Roadway in Fully-Mechanized Coal Faces with High Water-Content Material 被引量:1
12
作者 周华强 王光伟 +2 位作者 雷文成 曲庆贺 李峰 《Journal of China University of Mining and Technology》 2001年第2期113-117,共5页
A new method using high water content material to mechanically fill cross roadways to form artificial bottom for coal faces was introduced. The reasonable determination of filling range, the optimization of the compou... A new method using high water content material to mechanically fill cross roadways to form artificial bottom for coal faces was introduced. The reasonable determination of filling range, the optimization of the compounding ratio of high water content material, and the filling technique were discussed in detail. This new method has been spread after industrial testing in Baodian Colliery. Compared with the traditional method, the manual wooden chock method, the new one decreases about 40% of the filling range and cost in dealing every one set of cross roadway in the testing condition. 展开更多
关键词 fully mechanized coal face cross roadway high water content material FILLING artificial bottom
下载PDF
Coupled hydro-mechanical effect of a fractured rock mass under high water pressure 被引量:2
13
作者 Zhongming Jiang Shurong Feng Sheng Fu 《Journal of Rock Mechanics and Geotechnical Engineering》 2012年第1期88-96,共9页
To explore the variation of permeability and deformation behaviors of a fractured rock mass in high water pressure,a high pressure permeability test(HPPT),including measuring sensors of pore water pressure and displ... To explore the variation of permeability and deformation behaviors of a fractured rock mass in high water pressure,a high pressure permeability test(HPPT),including measuring sensors of pore water pressure and displacement of the rock mass,was designed according to the hydrogeological condition of Heimifeng pumped storage power station.With the assumption of radial water flow pattern in the rock mass during the HPPT,a theoretical formula was presented to estimate the coefficient of permeability of the rock mass using water pressures in injection and measuring boreholes.The variation in permeability of the rock mass with the injected water pressure was studied according to the suggested formula.By fitting the relationship between the coefficient of permeability and the injected water pressure,a mathematical expression was obtained and used in the numerical simulations.For a better understanding of the relationship between the pore water pressure and the displacement of the rock mass,a 3D numerical method based on a coupled hydro-mechanical theory was employed to simulate the response of the rock mass during the test.By comparison of the calculated and measured data of pore water pressure and displacement,the deformation behaviors of the rock mass were analyzed.It is shown that the variation of displacement in the fractured rock mass is caused by water flow passing through it under high water pressure,and the rock deformation during the test could be calculated by using the coupled hydro-mechanical model. 展开更多
关键词 fractured rock mass permeability under the condition of high water head hydro-mechanical coupling effect
下载PDF
REQUIREMENT OF FLUIDITY OFHIGH WATER CONTENT MATERIALS FOR THE GETWAY-SIDE BACKFILLING TECHNIQUE
14
作者 漆泰岳 马念杰 《Journal of China University of Mining and Technology》 1996年第2期81-90,共10页
Through analyzing the effects of water consumption, diameter of solid particle, and flow vefority on the fluidity of high water content material slurry, the relatinnship among the fluidity, the isotropy of the slurry,... Through analyzing the effects of water consumption, diameter of solid particle, and flow vefority on the fluidity of high water content material slurry, the relatinnship among the fluidity, the isotropy of the slurry, and the pumping facilities applied in getway-side backfilling has been found. And the requirment of fluidity of high water content material for the design of getway-side back filling technique is put forward in the paper. 展开更多
关键词 getway-side backfilling high water content materials
下载PDF
A Method for Calculating Oil Field Relative Permeability Curve by Using Water Drive Characteristic Curve in High Water Cut Stage
15
作者 Juan Du 《Journal of Geoscience and Environment Protection》 2022年第2期47-54,共8页
With the production of strong bottom water reservoir, it will soon enter the ultra-high water cut stage. After entering the ultra-high water cut period, the main means of stable production is liquid extraction. Large ... With the production of strong bottom water reservoir, it will soon enter the ultra-high water cut stage. After entering the ultra-high water cut period, the main means of stable production is liquid extraction. Large liquid volume has a certain impact on the physical property distribution and fluid seepage law of the oilfield. The relative permeability curve measured according to the industry standard is not used for the prediction of development indicators and the understanding of the dynamic law of the oilfield. In order to understand the characteristics of water drive law in high water cut stage of water drive oilfield, starting from the water drive characteristic curve in high water cut stage, the method for calculating the relative permeability curve is deduced. Through numerical simulation verification and fitting the actual production data, it is confirmed that the obtained relative permeability curve is in line with the reality of the oilfield, It can provide some guiding significance for understanding the production law and water drive law of strong bottom water reservoir in ultra-high water cut stage. 展开更多
关键词 Strong Bottom water Reservoir high water Cut Stage water Drive Curve Relative Permeability Curve
下载PDF
Coal and gas outburst prevention using new high water content cement slurry for injection into the coal seam 被引量:3
16
作者 Zhou Peiling Zhang Yinghua +3 位作者 Huang Zhi'an Gao Yukun Wang Hui Luo Qiang 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第4期669-673,共5页
As coal and gas outburst is one of the most serious mine disasters, it is very important to at least control it if not prevent it from occurring. Injecting cement slurry or grouting into the coal seam can strengthen t... As coal and gas outburst is one of the most serious mine disasters, it is very important to at least control it if not prevent it from occurring. Injecting cement slurry or grouting into the coal seam can strengthen the seam, increase its rigidity coefficient(f), and reduce the volumetric expansion due to gas energy release.This paper reports the results of laboratory experiments on cement-based high water content slurry having different water-cement ratios(W/C) to be used for coal injection. The results show that as the W/C increases, the mobility of the slurry and its setting time increase. The compressive strength and rupture strength, however, are reduced. Furthermore, high W/C grout shows early strength after 7 days, which can be 80% of its 14-day compressive strength. To achieve rapid setting and early strength, the addition of Na_2SiO_3has proven to give the best result, when the concentration of the additive is 3%. The initial and final setting times are 13 and 21 min shorter than samples without Na_2SiO_3, while the compressive strength is more than double. As a retarder, the initial setting time can be extended to 83 min when tartaric acid of 0.4% concentration is added. Through the orthogonal experiment, the optimum recipe of the new high water content slurry has been determined to be: W/C = 2, tartaric acid = 0.2%, Na_2SiO_3= 3%, and12% bentonite. Reinforcement by injection simulation experiments show that the grouting radius of the new slurry mix is 250 mm when the applied grouting pressure is 60 k Pa, 7-day rupture strength and compressive strength are 5.2 and 6.4 MPa, respectively, and are 37% and 88% higher than ordinary cement grout. It can be concluded that the newly developed slurry mix is more effective than the ordinary mix for reinforcing coal and controlling gas outburst. 展开更多
关键词 Gas outburst Setting liquid Reinforce coal high-water solidified materials Rapid setting and early strength cement RETARDER
下载PDF
Distribution of High Water Plants of Lake Karakir in Bukhara Region in Ecological Groups 被引量:1
17
作者 Kobilov Aziz Mukhtorovich Buriev Sulaymon Burievich 《American Journal of Plant Sciences》 2019年第12期2203-2207,共5页
In this article, information about the geographical location of the Karakir Lake in Bukhara region, high water plants, systematics and their distribution is presented. As a result of the research, Lake Karakir has 34 ... In this article, information about the geographical location of the Karakir Lake in Bukhara region, high water plants, systematics and their distribution is presented. As a result of the research, Lake Karakir has 34 species of high water plants belonging to 16 families. These plants were divided into ecological groups and analyzed. 展开更多
关键词 DITCH Gidrobiont high water Plants Eftrophication AQUARIUM Karakir Filtration REED CATTAIL Pondweed
下载PDF
Analysis of the Flow Field and Impact Force in High-Pressure Water Descaling
18
作者 Yue Cui Liyuan Wang +2 位作者 Jian Wu Haisheng Liu Di Wu 《Fluid Dynamics & Materials Processing》 EI 2024年第1期165-177,共13页
This study aims to improve the performances of the high-pressure water descaling technology used in steel hot rolling processes.In particular,a 2050 mm hot rolling line is considered,and the problem is investigated by... This study aims to improve the performances of the high-pressure water descaling technology used in steel hot rolling processes.In particular,a 2050 mm hot rolling line is considered,and the problem is investigated by means of a fluid–structure interaction(FSI)method by which the descaling effect produced by rolling coils with different section sizes is examined.Assuming a flat fan-shaped nozzle at the entrance of the R1R2 roughing mill,the outflow field characteristics and the velocity distribution curve on the strike line(at a target distance of 30–120 mm)are determined.It is found that the velocity in the center region of the water jet with different target distances is higher than that in the boundary region.As the target distance increases,the velocity of the water jet in the central region decreases.Through comparison with experimental results,it is shown that the simulation model can accurately predict the impact position of the high-pressure water on the impact plate,thereby providing a computational scheme that can be used to optimize the nozzle space layout and improve the slabs’descent effect for different rolling specifications. 展开更多
关键词 high pressure water descaling flow field analysis FSI target distance strike range
下载PDF
Analysis of the Risk of Water Breakout in the Bottom Plate of High-Intensity Mining of Extra-Thick Coal Seams
19
作者 Shuo Wang Hongdong Kang Xinchen Wang 《Journal of Geoscience and Environment Protection》 2024年第5期81-91,共11页
In order to clarify the danger of water breakout in the bottom plate of extra-thick coal seam mining, 2202 working face of a mine in the west is taken as the research object, and it is proposed to use the on-site moni... In order to clarify the danger of water breakout in the bottom plate of extra-thick coal seam mining, 2202 working face of a mine in the west is taken as the research object, and it is proposed to use the on-site monitoring means combining borehole peeping and microseismic monitoring, combined with the theoretical analysis to analyze the danger of water breakout in the bottom plate. The results show that: 1) the theoretically calculated maximum damage depth of the bottom plate is 27.5 m, and its layer is located above the Austrian ash aquifer, which has the danger of water breakout;2) the drill hole peeping at the bottom plate of the working face shows that the depth of the bottom plate fissure development reaches 26 m, and the integrity of the water barrier layer has been damaged, so there is the risk of water breakout;3) for the microseismic monitoring of the anomalous area, the bottom plate of the return air downstream channel occurs in the field with a one-week lag, which shows that microseismic monitoring events may reflect the water breakout of the underground. This shows that the microseismic monitoring events can reflect the changes of the underground flow field, which can provide a reference basis for the early warning of water breakout. The research results can provide reference for the prediction of sudden water hazard. 展开更多
关键词 Extra-Thick Coal Seam high-Intensity Mining Microseismic Monitoring water-Surge Hazard Borehole Peeping
下载PDF
Drainage design combining drain holes and pinholes for tunnel boring machine segments subject to high water pressure
20
作者 Yao LU Ming HUANG +3 位作者 Zhijie CHEN Zisheng ZENG Yuchuan LIU Guangzhao DU 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2023年第11期1723-1738,共16页
Balance of the groundwater and ecology is crucial for controlled discharge.However,regarding the segments of tunnel boring machines(TBMs)under high water pressure,the stability of the lining structure is often reduced... Balance of the groundwater and ecology is crucial for controlled discharge.However,regarding the segments of tunnel boring machines(TBMs)under high water pressure,the stability of the lining structure is often reduced by excessive drain holes required to achieve this balance.The large discharge of pinholes can easily have severe consequences,such as the lowering of the groundwater table,drying of springs,and vegetation wilting.Thus,in this study,according to the fluid-structure coupling theory,a new drainage design for TBM segments was developed by considering a mountain tunnel subject to a high water pressure as a case study.The evolution characteristics,including the external water pressure of the lining,discharge volume of the segment,and groundwater-table drawdown,were investigated via numerical modeling with drain holes and pinholes.The results indicated that the optimal design parameters of drainage segments for the project case were as follows:a circumferential spacing angle and longitudinal number on one side of a single ring of 51°and 2,respectively,for the drain holes and an inclination angle and length of 46.41°and 0.25 times the grouting thickness,respectively,for the pin holes. 展开更多
关键词 TBM segment high water pressure drain hole PINHOLE groundwater table drawdown
原文传递
上一页 1 2 250 下一页 到第
使用帮助 返回顶部