Considering the actual operating experience of the Daode Wind Farm, this paper analyzes the rea-sons for the fault of the lO-kV switch cabinet. Some technical improvements and management measures, such as implementing...Considering the actual operating experience of the Daode Wind Farm, this paper analyzes the rea-sons for the fault of the lO-kV switch cabinet. Some technical improvements and management measures, such as implementing the anti-accident technical measures, improving the installation and debugging level, and strengthening operation inspection, are proposed.展开更多
文摘Considering the actual operating experience of the Daode Wind Farm, this paper analyzes the rea-sons for the fault of the lO-kV switch cabinet. Some technical improvements and management measures, such as implementing the anti-accident technical measures, improving the installation and debugging level, and strengthening operation inspection, are proposed.