In 1997 the Michigan Department of Transportation (MDOT) established an ambitious set of condition targets for its pavements and bridges, and the Department received increased revenue from a 4-cent-per-gallon increase...In 1997 the Michigan Department of Transportation (MDOT) established an ambitious set of condition targets for its pavements and bridges, and the Department received increased revenue from a 4-cent-per-gallon increase in the state motor fuels tax to help meet its targets. However, over time, actual revenue was less than both what was initially estimated as needed to meet the targets and what was projected from the tax increase. Consequently, actual conditions were projected to fall short of the target levels, so the department issued bonds to address the shortfall through 2012. To support deliberations on future funding, in 2013 MDOT performed an analysis of historic conditions to determine what additional fuel tax revenues would have been required beginning in 1997 to: replace bond revenues used to fund pavement and bridge projects from 1997 to 2012;and enable MDOT to meet its condition targets. The analysis was performed using data on actual pavement and bridge funding and conditions;as well as predicted funding and conditions for different hypothetical increases in fuel taxes. The analysis concluded that, in addition to the actual increase of 4 cents per gallon, a fuel tax increase of another 10 cents per gallon would have been required in 1997 to replace bond revenue used for pavement and bridges and allow MDOT to meet its condition targets. The analysis results were used to help inform the discussion of Michigan’s target asset conditions and funding, and demonstrate application of MDOT’s pavement and bridge management systems for performing historic analyses.展开更多
With the continuous development of China’s economy,the construction of roads and bridges work has put forward higher requirements.Due to various factors,the long-term use of roads and bridges will produce a settlemen...With the continuous development of China’s economy,the construction of roads and bridges work has put forward higher requirements.Due to various factors,the long-term use of roads and bridges will produce a settlement phenomenon.Therefore,it is crucial to address settlement issues during the construction of roads and bridges to ensure that the quality of subgrade and pavement construction meets national regulations.This paper introduces the harm of subgrade pavement subsidence,analyzes the causes of subgrade pavement deformation,and discusses the technical points of subgrade pavement construction,hoping to provide some reference for relevant practitioners.展开更多
As the lifeline of social development,road and bridge projects are the main channel to realize resource transportation and economic circulation.Ensuring the quality of road and bridge project construction is crucial f...As the lifeline of social development,road and bridge projects are the main channel to realize resource transportation and economic circulation.Ensuring the quality of road and bridge project construction is crucial for the development of society,the economy,and people’s livelihoods.This paper studies the design of roadbed pavement structures in road and bridge transition sections.It aims to provide technical references and significance for China’s road and bridge engineering design and construction units,promoting scientific and standardized design in these actions.This will contribute to the safety and stable operation of road and bridge projects,offering effective technical support.Furthermore,it seeks to foster the sustainable and healthy development of China’s road and bridge engineering on a macro level.展开更多
As an important part of steel bridge deck,the engineering quality and service condition of steel bridge deck pavement(SBDP)directly affects the capacity and operational efficiency of the bridge.This paper reviews the ...As an important part of steel bridge deck,the engineering quality and service condition of steel bridge deck pavement(SBDP)directly affects the capacity and operational efficiency of the bridge.This paper reviews the history of the development of SBDP in China over the past 20 years from the exploration stage,rapid development stage and prosperity stage.The development and application of SBDP at different stages are discussed in terms of materials,structure,design,performance evaluation,maintenance and rehabilitation,respectively.The advantages and disadvantages of different pavement materials and structures,and the application of different research methods are summarized.The review shows that the improvement of pavement materials and structures and the development of new materials should be further studied on the multi-scale to enhance the durability of pavement materials,so as to extend the service life of pavements.The design method of SBDP related to the synergistic effect of vehicle,pavement and bridge should be established,and the design concept and method standard of rigid base pavement structure should be improved and formulate a complete design standard.In addition,multi-disease intelligent identification system and equipment should be studied to track the entire course of disease development in real time.And it is necessary to develop appropriate algorithms to select and classify the complex data of disease and maintenance history.展开更多
Asphalt pavement is currently one of the main components in the construction of roads and bridges.However,from a practical point of view,various quality problems are prone to occur in the surface layer of asphalt pave...Asphalt pavement is currently one of the main components in the construction of roads and bridges.However,from a practical point of view,various quality problems are prone to occur in the surface layer of asphalt pavement,which will lead to the poor overall quality of road and bridge projects.Therefore,it should be applied reasonably.Advanced testing technologies are used to test the mixture quality,compaction,segregation,thickness,and other aspects of the asphalt pavement surface layer,so as to improve the quality of the asphalt pavement surface layer,and then improve the overall quality of road and bridge construction.Therefore,this paper mainly analyzes the technologies for asphalt pavement surface layer testing in road and bridge engineering construction.展开更多
Based on four-year field inspection and investigation on deck pavement of mastic asphalt on Jiangyin Bridge, cracking causes of mastic asphalt are studied. Cracks of deck pavement are summarized on crack length and wi...Based on four-year field inspection and investigation on deck pavement of mastic asphalt on Jiangyin Bridge, cracking causes of mastic asphalt are studied. Cracks of deck pavement are summarized on crack length and width to get a clear view of their propagations. Traffic surveys including traffic volume, axle load and vehicle speed were also conducted to assess their influences. Samples taken on-site were tested with pulling-out test and fatigue test to benchmark their properties. According to the inspection and tests results, it is concluded that the cracks are induced by rutting and fatigue. Lack of fatigue resistance, not well bonded to the steel deck and insufficient high temperature stability are supposed to be the main reasons as well as high density of low speed, excessively overloaded trucks.展开更多
The high temperature anti-rutting performance,water stability and low temperature bending property of epoxy asphalt mixture with 0%,15%,25%,40%,and 70% granulated and circular lightweight aggregates by weight are test...The high temperature anti-rutting performance,water stability and low temperature bending property of epoxy asphalt mixture with 0%,15%,25%,40%,and 70% granulated and circular lightweight aggregates by weight are tested,respectively.The dynamic responses under the vehicle load and in the opening process are analyzed to obtain the mechanical responses of pavements by using the finite element method.The complicated structure including a steel deck and a waterproof adhesive layer is made to verify the bond strength of the 2451-type epoxy asphalt binder.Research results show that the epoxy asphalt mixtures with lightweight aggregate replacement percentages from 0% to 70% all satisfy the requirements for steel bridge pavements.The epoxy asphalt mixture with a 70% circular lightweight aggregate replacement percentage is recommended because of its smaller density when compared with other epoxy asphalt mixtures.The shear stress increases with the increase in the opening angle and achieves its maximum at the maximum opening angle of 85°.Test results show that the Tianjin Bascule Bridge can be used for first opening after a 3 d pavement conditioning.展开更多
In order to improve the surface performace of epoxy asphalt pavement (EAP) for steel bridge deck, an epoxy asphalt chip seal ( ECS) covered by a cationic emulsified asphalt fog seal (i. e., fog-sealed chip seal)...In order to improve the surface performace of epoxy asphalt pavement (EAP) for steel bridge deck, an epoxy asphalt chip seal ( ECS) covered by a cationic emulsified asphalt fog seal (i. e., fog-sealed chip seal) isproposed and a laboratory study is conducted to design and evaluate te fog-sealed chip seal. First, the evaluation indices and methods of te chip seal on steel bridge deck pavement were proposed. Secondly, the worst pavement conditions during te maintenance time were simulated by te small traffic load simulation system MMLS3 and the short-term aging test for minimizing the failure probability of chip seal. Finally, the design parameters of fog-sealed chip seal were determined by the experimental analysis and the performance of the designed fog-sealed chip seal was evaluated in thelaboratory. Results indicate that the proposed simulation method of pavement conditions is effective and the maximal load repetitions on the EAPslab specimen are approximately 925 300 times. Moreover, the designed fog-sealedchip sealcan provide a dense surface with sufficient skid resistance,aggregate-asphalt aahesive performance and interlayer shearing resistance.展开更多
To investigate the fatigue damage of epoxy asphalt pavement(EAP)under a heavy load and a d temperature load,the load-figure of the heavy load on the steel bridge deck pavement(SBDP)was simulated first,and the temperat...To investigate the fatigue damage of epoxy asphalt pavement(EAP)under a heavy load and a d temperature load,the load-figure of the heavy load on the steel bridge deck pavement(SBDP)was simulated first,and the temperature distribution of SBDP during the temperature-fall period in winter was also calculated.Secondly,t e moving heavy load coupled W t the most unfavorable temperatre load was applied to the SBDP,and the tensile stress on the top of SBDP was calculated.Finally,the fatigue damage of EAP was evaluated considering the extreme situation of heavily overloaded and severe environments.The results show that botte heavy load and the temperature load during t e temperature-fall period c n increase the tensile stress on the top of SBDP significantly.In the exteme situation of heavily overloaded and severe environments,a fatigue crack is easily generated,and thus the SBDP should avoid t e coupling effects of the heavy loadand the temperature load in winter.展开更多
Three beam samples of bridge deck pavement were prepared, with gradation types of AC-13, and AC-16 and combined AC-13+AC-16. Four-point bending test was adopted to investigate the fatigue performance of these beam sa...Three beam samples of bridge deck pavement were prepared, with gradation types of AC-13, and AC-16 and combined AC-13+AC-16. Four-point bending test was adopted to investigate the fatigue performance of these beam samples. The experimental results indicate that the initial bending stiffness is related to the type of beam sample samples decreases as the increase of the controlled strain fatigue resistance and bigger limiting bending strain at pared with single beam sample, the fatigue performance and testing temperature. Fatigue life of these level. The AC-13 beam sample exhibits better the given strain level and temperature. Corn- of combining beam samnle is relatively poor.展开更多
In order to research the mechanical response of continuously reinforced concrete pavement on foam concrete interlayer for a two-way curved arch bridge, the elliptical vehicle load is translated into the rectangular lo...In order to research the mechanical response of continuously reinforced concrete pavement on foam concrete interlayer for a two-way curved arch bridge, the elliptical vehicle load is translated into the rectangular load based on the equivalence method. Then, a three-dimensional finite element model of the whole bridge is established. The reliability of the model is verified. Additionally, the mechanical response of continuously reinforced concrete pavement under vehicle loading is analyzed. Finally, the most unfavorable loading conditions of tensile stress, shear stress and vertical displacement are determined. The results show that the most unfavorable loading condition of tensile stress, which is at the bottom of continuously reinforced concrete pavement on the two-way curved arch bridge, is changed compared with that on homogeneous foundation. The most unfavorable loading condition of shear stress at the top is also changed. However, the most unfavorable loading condition of vertical displacement remains unchanged. The tensile stress at the bottom of about 1/4 span of the longitudinal joint, the shear stress at the top of intersection of transverse and longitudinal joint, together with the vertical displacement at the central part of longitudinal joint, are taken as design indices during the structural design of continuously reinforced concrete pavement on the two-way curved arch bridge. The results are helpful for the design of continuously reinforced concrete pavement on unequal- thickness base for the two-way curved arch bridge.展开更多
With the continuous development of bridge and tunnel construction technologies,large-scale sea-crossing bridges and tunnels have gradually become the preferred choice for regional traffic.The construction technology o...With the continuous development of bridge and tunnel construction technologies,large-scale sea-crossing bridges and tunnels have gradually become the preferred choice for regional traffic.The construction technology of Hong Kong-Zhuhai-Macao Bridge(HZMB),one of the most representative sea-crossing passageways,is instructive for the construction of other large sea-crossing infrastructures.At present,the pavement design method of sea-crossing passageways lacks pertinence as it still refers to specifications for design of common pavement.Therefore,it is necessary to consider the bridge and tunnel pavement of HZMB as a typical example to analyze key technical problems encountered in its design,construction and operation.Novel solutions for material selection and structural design built upon the analysis of such critical problems should thus follow up.Based on comprehensive literature research,it can be found that environmental variability,tunnel closure,structural differential settlement and expansion deformation are the key technical problems faced by pavement of sea-crossing passageways.In view of the environmental variability,the steel deck-paving material and structure design of GMA-10 t SMA-13 is innovatively proposed.As for the closure of immersed tube tunnel,warm-mix flame retardant asphalt mixture is used to control pavement design through key indexes such as temperature and limit oxygen index.Regarding the deformation of immersed pipe joints,BJ200 asphalt seamless expansion joint material is introduced,which effectively satisfies the multi-directional deformation between pipe joints and ensures the smoothness of the road surface and driving comfort.For segmental joints,double-layer waterproof-coiled material is used to effectively prevent reflective cracks while ensuring the continuity of asphalt concrete pavement.Therefore,this paper provides a panel of ideas and methods for the pavement design of the same type of sea-crossing passageways.展开更多
The effect of multiple span suspension structure on the mechanical response of bridge deck pavement was studied, and finite element analysis (FEM) of stress and strain of pavement according to the bridge floor system ...The effect of multiple span suspension structure on the mechanical response of bridge deck pavement was studied, and finite element analysis (FEM) of stress and strain of pavement according to the bridge floor system features of super-long and high flexibility was made. Meanwhile, the FEM results were compared with those of the single span suspension structure. Three-stage analytic hierarchy process (AHP) is developed to analyze the mechanical response including whole bridge analysis, partial beams section analysis and orthotropic plate analysis. The most unfavorable load position was determined by the numerical solutions acquired from each stage to study the main mechanical index of multiple span suspension structure. The FEM results showed that the mechanical response numerical solutions by using the three-stage AHP are greater than those by simplified boundary condition, and the force condition of multiple span suspension structure is worse than that of the single span suspension structure.展开更多
The construction of municipal roads and bridges is an important foundation for the smooth traveling and transportation.However,if there a reduction in the subgrade and pavement part,the safety and the comfort of the d...The construction of municipal roads and bridges is an important foundation for the smooth traveling and transportation.However,if there a reduction in the subgrade and pavement part,the safety and the comfort of the driver will be seriously affected,therefore,reasonable measures should be taken on time to tackle the related issues.The significance of subgrade and pavement construction in the subsidence section,the key points of the construction,and the appropriate control measures that are should be taken in the actual construction,was discussed in this paper.Further,this paper analyzes the availability of the subgrade and pavement construction technology for the municipal roads and bridges,to provide a reference for engineers.展开更多
This paper provides a review on the development of structural monitoring in Japan, with an emphasis on the type, strategy, and utilization of monitoring systems. The review focuses on bridge and building structures us...This paper provides a review on the development of structural monitoring in Japan, with an emphasis on the type, strategy, and utilization of monitoring systems. The review focuses on bridge and building structures using vibration-based techniques. Structural monitoring systems in Japan historically started with the objective of evaluating structural responses against extreme events. In the development of structural monitoring, monitoring systems and collected data were used to verify design assumptions, update speci cations, and facilitate the ef cacy of vibration control systems. Strategies and case studies on monitoring for the design veri cation of long-span bridges and tall buildings, the performance of seismic isolation systems in building and bridges, the veri cation of structural retro t, the veri cation of structural control systems (passive, semi-active, and active), structural assessment, and damage detec- tion are described. More recently, the application of monitoring systems has been extended to facilitate ef cient operation and effective maintenance through the rationalization of risk and asset management using monitoring data. This paper also summarizes the lessons learned and feedback obtained from case studies on the structural monitoring of bridges and buildings in Japan.展开更多
An index system of steel deck pavement design is proposed according to the study and classification of failure types. Furthermore the axle-equivalent equation is presented according to the fatigue principle of pavemen...An index system of steel deck pavement design is proposed according to the study and classification of failure types. Furthermore the axle-equivalent equation is presented according to the fatigue principle of pavement structures. Based on indoor experiments and theoretical analysis, this paper studies the stress characteristics of three different axle types which are corresponding with the other three typical pavement structures, and also presents the parameters of each axle's equivalent formula. The three axle types include single-axle single-wheel, single-axle double-wheel and double-axle double-wheel. According to analyses of influential factors such as climate, environment, traffic and stress condition, the developed axle equivalent formula and the parameters modified by the field test data can be applied in the design of a new bridge deck pavement and the assessment of an existing bridge deck pavement.展开更多
文摘In 1997 the Michigan Department of Transportation (MDOT) established an ambitious set of condition targets for its pavements and bridges, and the Department received increased revenue from a 4-cent-per-gallon increase in the state motor fuels tax to help meet its targets. However, over time, actual revenue was less than both what was initially estimated as needed to meet the targets and what was projected from the tax increase. Consequently, actual conditions were projected to fall short of the target levels, so the department issued bonds to address the shortfall through 2012. To support deliberations on future funding, in 2013 MDOT performed an analysis of historic conditions to determine what additional fuel tax revenues would have been required beginning in 1997 to: replace bond revenues used to fund pavement and bridge projects from 1997 to 2012;and enable MDOT to meet its condition targets. The analysis was performed using data on actual pavement and bridge funding and conditions;as well as predicted funding and conditions for different hypothetical increases in fuel taxes. The analysis concluded that, in addition to the actual increase of 4 cents per gallon, a fuel tax increase of another 10 cents per gallon would have been required in 1997 to replace bond revenue used for pavement and bridges and allow MDOT to meet its condition targets. The analysis results were used to help inform the discussion of Michigan’s target asset conditions and funding, and demonstrate application of MDOT’s pavement and bridge management systems for performing historic analyses.
文摘With the continuous development of China’s economy,the construction of roads and bridges work has put forward higher requirements.Due to various factors,the long-term use of roads and bridges will produce a settlement phenomenon.Therefore,it is crucial to address settlement issues during the construction of roads and bridges to ensure that the quality of subgrade and pavement construction meets national regulations.This paper introduces the harm of subgrade pavement subsidence,analyzes the causes of subgrade pavement deformation,and discusses the technical points of subgrade pavement construction,hoping to provide some reference for relevant practitioners.
文摘As the lifeline of social development,road and bridge projects are the main channel to realize resource transportation and economic circulation.Ensuring the quality of road and bridge project construction is crucial for the development of society,the economy,and people’s livelihoods.This paper studies the design of roadbed pavement structures in road and bridge transition sections.It aims to provide technical references and significance for China’s road and bridge engineering design and construction units,promoting scientific and standardized design in these actions.This will contribute to the safety and stable operation of road and bridge projects,offering effective technical support.Furthermore,it seeks to foster the sustainable and healthy development of China’s road and bridge engineering on a macro level.
基金The authors appreciate the financial support from the National Natural Science Foundation of China(No.51878167)Qing Lan Project of Jiangsu Province。
文摘As an important part of steel bridge deck,the engineering quality and service condition of steel bridge deck pavement(SBDP)directly affects the capacity and operational efficiency of the bridge.This paper reviews the history of the development of SBDP in China over the past 20 years from the exploration stage,rapid development stage and prosperity stage.The development and application of SBDP at different stages are discussed in terms of materials,structure,design,performance evaluation,maintenance and rehabilitation,respectively.The advantages and disadvantages of different pavement materials and structures,and the application of different research methods are summarized.The review shows that the improvement of pavement materials and structures and the development of new materials should be further studied on the multi-scale to enhance the durability of pavement materials,so as to extend the service life of pavements.The design method of SBDP related to the synergistic effect of vehicle,pavement and bridge should be established,and the design concept and method standard of rigid base pavement structure should be improved and formulate a complete design standard.In addition,multi-disease intelligent identification system and equipment should be studied to track the entire course of disease development in real time.And it is necessary to develop appropriate algorithms to select and classify the complex data of disease and maintenance history.
文摘Asphalt pavement is currently one of the main components in the construction of roads and bridges.However,from a practical point of view,various quality problems are prone to occur in the surface layer of asphalt pavement,which will lead to the poor overall quality of road and bridge projects.Therefore,it should be applied reasonably.Advanced testing technologies are used to test the mixture quality,compaction,segregation,thickness,and other aspects of the asphalt pavement surface layer,so as to improve the quality of the asphalt pavement surface layer,and then improve the overall quality of road and bridge construction.Therefore,this paper mainly analyzes the technologies for asphalt pavement surface layer testing in road and bridge engineering construction.
文摘Based on four-year field inspection and investigation on deck pavement of mastic asphalt on Jiangyin Bridge, cracking causes of mastic asphalt are studied. Cracks of deck pavement are summarized on crack length and width to get a clear view of their propagations. Traffic surveys including traffic volume, axle load and vehicle speed were also conducted to assess their influences. Samples taken on-site were tested with pulling-out test and fatigue test to benchmark their properties. According to the inspection and tests results, it is concluded that the cracks are induced by rutting and fatigue. Lack of fatigue resistance, not well bonded to the steel deck and insufficient high temperature stability are supposed to be the main reasons as well as high density of low speed, excessively overloaded trucks.
基金China Postdoctoral Science Foundation(No. 20110491342)Jiangsu Postdoctoral Science Foundation(No. 1101018C)the National Natural Science Foundation of China(No. 51178114,50908054)
文摘The high temperature anti-rutting performance,water stability and low temperature bending property of epoxy asphalt mixture with 0%,15%,25%,40%,and 70% granulated and circular lightweight aggregates by weight are tested,respectively.The dynamic responses under the vehicle load and in the opening process are analyzed to obtain the mechanical responses of pavements by using the finite element method.The complicated structure including a steel deck and a waterproof adhesive layer is made to verify the bond strength of the 2451-type epoxy asphalt binder.Research results show that the epoxy asphalt mixtures with lightweight aggregate replacement percentages from 0% to 70% all satisfy the requirements for steel bridge pavements.The epoxy asphalt mixture with a 70% circular lightweight aggregate replacement percentage is recommended because of its smaller density when compared with other epoxy asphalt mixtures.The shear stress increases with the increase in the opening angle and achieves its maximum at the maximum opening angle of 85°.Test results show that the Tianjin Bascule Bridge can be used for first opening after a 3 d pavement conditioning.
基金The National Natural Science Foundation of China(No.51378122)
文摘In order to improve the surface performace of epoxy asphalt pavement (EAP) for steel bridge deck, an epoxy asphalt chip seal ( ECS) covered by a cationic emulsified asphalt fog seal (i. e., fog-sealed chip seal) isproposed and a laboratory study is conducted to design and evaluate te fog-sealed chip seal. First, the evaluation indices and methods of te chip seal on steel bridge deck pavement were proposed. Secondly, the worst pavement conditions during te maintenance time were simulated by te small traffic load simulation system MMLS3 and the short-term aging test for minimizing the failure probability of chip seal. Finally, the design parameters of fog-sealed chip seal were determined by the experimental analysis and the performance of the designed fog-sealed chip seal was evaluated in thelaboratory. Results indicate that the proposed simulation method of pavement conditions is effective and the maximal load repetitions on the EAPslab specimen are approximately 925 300 times. Moreover, the designed fog-sealedchip sealcan provide a dense surface with sufficient skid resistance,aggregate-asphalt aahesive performance and interlayer shearing resistance.
基金The National Natural Science Foundation of China(Nos.51378122,51678146)the Scientific Research Foundation of Graduate School of Southeast University(No.YBJJ1680)
文摘To investigate the fatigue damage of epoxy asphalt pavement(EAP)under a heavy load and a d temperature load,the load-figure of the heavy load on the steel bridge deck pavement(SBDP)was simulated first,and the temperature distribution of SBDP during the temperature-fall period in winter was also calculated.Secondly,t e moving heavy load coupled W t the most unfavorable temperatre load was applied to the SBDP,and the tensile stress on the top of SBDP was calculated.Finally,the fatigue damage of EAP was evaluated considering the extreme situation of heavily overloaded and severe environments.The results show that botte heavy load and the temperature load during t e temperature-fall period c n increase the tensile stress on the top of SBDP significantly.In the exteme situation of heavily overloaded and severe environments,a fatigue crack is easily generated,and thus the SBDP should avoid t e coupling effects of the heavy loadand the temperature load in winter.
基金Funded by the National Natural Science Foundation of China (No. 50878171)
文摘Three beam samples of bridge deck pavement were prepared, with gradation types of AC-13, and AC-16 and combined AC-13+AC-16. Four-point bending test was adopted to investigate the fatigue performance of these beam samples. The experimental results indicate that the initial bending stiffness is related to the type of beam sample samples decreases as the increase of the controlled strain fatigue resistance and bigger limiting bending strain at pared with single beam sample, the fatigue performance and testing temperature. Fatigue life of these level. The AC-13 beam sample exhibits better the given strain level and temperature. Corn- of combining beam samnle is relatively poor.
基金The Science Foundation of Ministry of Transport of the People's Republic of China(No.200731822301-7)
文摘In order to research the mechanical response of continuously reinforced concrete pavement on foam concrete interlayer for a two-way curved arch bridge, the elliptical vehicle load is translated into the rectangular load based on the equivalence method. Then, a three-dimensional finite element model of the whole bridge is established. The reliability of the model is verified. Additionally, the mechanical response of continuously reinforced concrete pavement under vehicle loading is analyzed. Finally, the most unfavorable loading conditions of tensile stress, shear stress and vertical displacement are determined. The results show that the most unfavorable loading condition of tensile stress, which is at the bottom of continuously reinforced concrete pavement on the two-way curved arch bridge, is changed compared with that on homogeneous foundation. The most unfavorable loading condition of shear stress at the top is also changed. However, the most unfavorable loading condition of vertical displacement remains unchanged. The tensile stress at the bottom of about 1/4 span of the longitudinal joint, the shear stress at the top of intersection of transverse and longitudinal joint, together with the vertical displacement at the central part of longitudinal joint, are taken as design indices during the structural design of continuously reinforced concrete pavement on the two-way curved arch bridge. The results are helpful for the design of continuously reinforced concrete pavement on unequal- thickness base for the two-way curved arch bridge.
基金This paper was financially supported by the National Natural Science Foundation of China(52038001,52122809).
文摘With the continuous development of bridge and tunnel construction technologies,large-scale sea-crossing bridges and tunnels have gradually become the preferred choice for regional traffic.The construction technology of Hong Kong-Zhuhai-Macao Bridge(HZMB),one of the most representative sea-crossing passageways,is instructive for the construction of other large sea-crossing infrastructures.At present,the pavement design method of sea-crossing passageways lacks pertinence as it still refers to specifications for design of common pavement.Therefore,it is necessary to consider the bridge and tunnel pavement of HZMB as a typical example to analyze key technical problems encountered in its design,construction and operation.Novel solutions for material selection and structural design built upon the analysis of such critical problems should thus follow up.Based on comprehensive literature research,it can be found that environmental variability,tunnel closure,structural differential settlement and expansion deformation are the key technical problems faced by pavement of sea-crossing passageways.In view of the environmental variability,the steel deck-paving material and structure design of GMA-10 t SMA-13 is innovatively proposed.As for the closure of immersed tube tunnel,warm-mix flame retardant asphalt mixture is used to control pavement design through key indexes such as temperature and limit oxygen index.Regarding the deformation of immersed pipe joints,BJ200 asphalt seamless expansion joint material is introduced,which effectively satisfies the multi-directional deformation between pipe joints and ensures the smoothness of the road surface and driving comfort.For segmental joints,double-layer waterproof-coiled material is used to effectively prevent reflective cracks while ensuring the continuity of asphalt concrete pavement.Therefore,this paper provides a panel of ideas and methods for the pavement design of the same type of sea-crossing passageways.
基金National Science and Technology Support Program of China ( No. 2009BAG15B03)
文摘The effect of multiple span suspension structure on the mechanical response of bridge deck pavement was studied, and finite element analysis (FEM) of stress and strain of pavement according to the bridge floor system features of super-long and high flexibility was made. Meanwhile, the FEM results were compared with those of the single span suspension structure. Three-stage analytic hierarchy process (AHP) is developed to analyze the mechanical response including whole bridge analysis, partial beams section analysis and orthotropic plate analysis. The most unfavorable load position was determined by the numerical solutions acquired from each stage to study the main mechanical index of multiple span suspension structure. The FEM results showed that the mechanical response numerical solutions by using the three-stage AHP are greater than those by simplified boundary condition, and the force condition of multiple span suspension structure is worse than that of the single span suspension structure.
文摘The construction of municipal roads and bridges is an important foundation for the smooth traveling and transportation.However,if there a reduction in the subgrade and pavement part,the safety and the comfort of the driver will be seriously affected,therefore,reasonable measures should be taken on time to tackle the related issues.The significance of subgrade and pavement construction in the subsidence section,the key points of the construction,and the appropriate control measures that are should be taken in the actual construction,was discussed in this paper.Further,this paper analyzes the availability of the subgrade and pavement construction technology for the municipal roads and bridges,to provide a reference for engineers.
文摘This paper provides a review on the development of structural monitoring in Japan, with an emphasis on the type, strategy, and utilization of monitoring systems. The review focuses on bridge and building structures using vibration-based techniques. Structural monitoring systems in Japan historically started with the objective of evaluating structural responses against extreme events. In the development of structural monitoring, monitoring systems and collected data were used to verify design assumptions, update speci cations, and facilitate the ef cacy of vibration control systems. Strategies and case studies on monitoring for the design veri cation of long-span bridges and tall buildings, the performance of seismic isolation systems in building and bridges, the veri cation of structural retro t, the veri cation of structural control systems (passive, semi-active, and active), structural assessment, and damage detec- tion are described. More recently, the application of monitoring systems has been extended to facilitate ef cient operation and effective maintenance through the rationalization of risk and asset management using monitoring data. This paper also summarizes the lessons learned and feedback obtained from case studies on the structural monitoring of bridges and buildings in Japan.
基金The National Natural Science Foundation of China(No.50578038)the Ph.D. Programs Foundation of Ministry of Ed-ucation of China (No.20050286008)Runyang Yangtze River High-way Bridge Technology Study for Steel-Deck Pavement.
文摘An index system of steel deck pavement design is proposed according to the study and classification of failure types. Furthermore the axle-equivalent equation is presented according to the fatigue principle of pavement structures. Based on indoor experiments and theoretical analysis, this paper studies the stress characteristics of three different axle types which are corresponding with the other three typical pavement structures, and also presents the parameters of each axle's equivalent formula. The three axle types include single-axle single-wheel, single-axle double-wheel and double-axle double-wheel. According to analyses of influential factors such as climate, environment, traffic and stress condition, the developed axle equivalent formula and the parameters modified by the field test data can be applied in the design of a new bridge deck pavement and the assessment of an existing bridge deck pavement.