This paper presents the effect of thickness of Buffer layer on the safety of cut-and-cover tunnel under the given magnitude and height of rockfall, and the limit load of the structure. To establish calculating models ...This paper presents the effect of thickness of Buffer layer on the safety of cut-and-cover tunnel under the given magnitude and height of rockfall, and the limit load of the structure. To establish calculating models of rockfall in different conditions, the dynamics of the fall down to the surface of the slope is taken into account and the exterior characteristics of the rockfall is analyzed. We have derived the formula for calculating velocity of rocks before and after collision, calculated the impact load upon the structures below and the limit load, and compared the impact force and limit load to judge the safety of the structure. Finally, the validity of models is approved by the safety evaluation of cut-and-cover tunnel in the mouth of Heshang Mountain in Nandan County.展开更多
Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a n...Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method.展开更多
文摘This paper presents the effect of thickness of Buffer layer on the safety of cut-and-cover tunnel under the given magnitude and height of rockfall, and the limit load of the structure. To establish calculating models of rockfall in different conditions, the dynamics of the fall down to the surface of the slope is taken into account and the exterior characteristics of the rockfall is analyzed. We have derived the formula for calculating velocity of rocks before and after collision, calculated the impact load upon the structures below and the limit load, and compared the impact force and limit load to judge the safety of the structure. Finally, the validity of models is approved by the safety evaluation of cut-and-cover tunnel in the mouth of Heshang Mountain in Nandan County.
基金Beijing Science and Technology Planning Project(No.D0604003040921)
文摘Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method.