期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Analysis of Rockfall and Its Impact on the Cut-and-Cover Tunnel in Dynamics 被引量:5
1
作者 SONG Shuzhi KONG Jiming +2 位作者 WANG Chenghua CHENG Zefu YANG Zongji 《Wuhan University Journal of Natural Sciences》 EI CAS 2006年第4期905-909,共5页
This paper presents the effect of thickness of Buffer layer on the safety of cut-and-cover tunnel under the given magnitude and height of rockfall, and the limit load of the structure. To establish calculating models ... This paper presents the effect of thickness of Buffer layer on the safety of cut-and-cover tunnel under the given magnitude and height of rockfall, and the limit load of the structure. To establish calculating models of rockfall in different conditions, the dynamics of the fall down to the surface of the slope is taken into account and the exterior characteristics of the rockfall is analyzed. We have derived the formula for calculating velocity of rocks before and after collision, calculated the impact load upon the structures below and the limit load, and compared the impact force and limit load to judge the safety of the structure. Finally, the validity of models is approved by the safety evaluation of cut-and-cover tunnel in the mouth of Heshang Mountain in Nandan County. 展开更多
关键词 ROCKFALL cut-and-cover tunnel (CCT) impact force buffer layer
下载PDF
Risk identification and risk mitigation during metro station construction by enlarging shield tunnel combined with cut-and-cover method 被引量:3
2
作者 Zhang, Xinjin Liu, Weining Lu, Meili 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期142-146,共5页
Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a n... Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method. 展开更多
关键词 shield tunnel cut-and-cover method metro station risk identification risk mitigation
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部