振冲碎石桩是软弱土坝基重要的加固手段,在实际的工程实践中,振冲碎石桩加固手段对于软弱坝基的处理是否有效需要基于现场试验进行检测。针对非洲卢旺达Nyabarongo II HPP工程的坝基振冲碎石桩加固措施难题,在国内选址了地质条件相似的...振冲碎石桩是软弱土坝基重要的加固手段,在实际的工程实践中,振冲碎石桩加固手段对于软弱坝基的处理是否有效需要基于现场试验进行检测。针对非洲卢旺达Nyabarongo II HPP工程的坝基振冲碎石桩加固措施难题,在国内选址了地质条件相似的温州仙湖试验区进行振冲碎石桩的现场试验,验证了振冲碎石桩加固深厚软土层的有效性。采用孔压静力触探试验、十字剪切板试验、动力触探试验、载荷试验检测振冲碎石桩的加固效果和地基承载力。相关研究可丰富软弱土坝基的振冲碎石桩施工处理工艺,为后续类似工程加固实践提供参考。展开更多
The first author proposed the concept of the cemented material dam (CMD) in 2009. This concept was aimed at building an environmentally friendly dam in a safer and more economical way for both the dam and the area d...The first author proposed the concept of the cemented material dam (CMD) in 2009. This concept was aimed at building an environmentally friendly dam in a safer and more economical way for both the dam and the area downstream. The concept covers the cemented sand, gravel, and rock dam (CSGRD), the rockfill concrete (RFC) dam (or the cemented rockfill dam, CRD), and the cemented soil dam (CSD). This paper summarizes the concept and principles of the CMD based on studies and practices in projects around the world. It also introduces new developments in the CSGRD, CRD, and CSD.展开更多
文摘振冲碎石桩是软弱土坝基重要的加固手段,在实际的工程实践中,振冲碎石桩加固手段对于软弱坝基的处理是否有效需要基于现场试验进行检测。针对非洲卢旺达Nyabarongo II HPP工程的坝基振冲碎石桩加固措施难题,在国内选址了地质条件相似的温州仙湖试验区进行振冲碎石桩的现场试验,验证了振冲碎石桩加固深厚软土层的有效性。采用孔压静力触探试验、十字剪切板试验、动力触探试验、载荷试验检测振冲碎石桩的加固效果和地基承载力。相关研究可丰富软弱土坝基的振冲碎石桩施工处理工艺,为后续类似工程加固实践提供参考。
文摘The first author proposed the concept of the cemented material dam (CMD) in 2009. This concept was aimed at building an environmentally friendly dam in a safer and more economical way for both the dam and the area downstream. The concept covers the cemented sand, gravel, and rock dam (CSGRD), the rockfill concrete (RFC) dam (or the cemented rockfill dam, CRD), and the cemented soil dam (CSD). This paper summarizes the concept and principles of the CMD based on studies and practices in projects around the world. It also introduces new developments in the CSGRD, CRD, and CSD.