The paper studies the behavior of reinforced concrete raft foundations for multi-story buildings. It also develops a reliability assessment tool for multi- story building raft foundations subjected to earthquake loadi...The paper studies the behavior of reinforced concrete raft foundations for multi-story buildings. It also develops a reliability assessment tool for multi- story building raft foundations subjected to earthquake loading. Several multi-story buildings with various configurations, heights, and soil profiles, were subjected to several ACI code combinations of gravity and earthquake loads from different seismic zones. The reliability of the raft foundations of these buildings was assessed using the reliability index approach based on their resistance to the applied loads. Also, the responses of the multi-story buildings under these loading combinations were studied and analyzed in order to draw recommendations and guidelines for the preliminary design of structurally efficient and reliable raft foundations in earthquake zones.展开更多
Adjacent high-rise building with CFG pile composite foundation was studied using model test method to investigate stress and displacement of the foundation pile retaining structure, the subsidence and transmogrificati...Adjacent high-rise building with CFG pile composite foundation was studied using model test method to investigate stress and displacement of the foundation pile retaining structure, the subsidence and transmogrification law of the composite foundation. Two different project cases with and without high-rise building adjacent to pile foundation were compared. The relationships of slope pile bending moment, earth pressure, pile top displacement and complex settlement with respect to time were obtained. 1) When there is no adjacent building, the displacement of supporting system caused by excavation is mainly in the horizontal direction; while when the adjacent building exists, the displacement of supporting system will be vertical. 2) When the excavation depth is less than or equal to the adjacent building's composite foundation depth, the force of supporting structure is uniform and has small value, at the same time, the pile strength is in fully use and the foundation is stable; while when the excavation depth is greater than the depth of adjacent building's composite foundation, the results will be opposite. 3) During the excavation process, the adjustment of the composite ground loads on the supporting structure is carried out downward and the force of the supporting structure is reduced through the deformation of the bearing layer.展开更多
文摘The paper studies the behavior of reinforced concrete raft foundations for multi-story buildings. It also develops a reliability assessment tool for multi- story building raft foundations subjected to earthquake loading. Several multi-story buildings with various configurations, heights, and soil profiles, were subjected to several ACI code combinations of gravity and earthquake loads from different seismic zones. The reliability of the raft foundations of these buildings was assessed using the reliability index approach based on their resistance to the applied loads. Also, the responses of the multi-story buildings under these loading combinations were studied and analyzed in order to draw recommendations and guidelines for the preliminary design of structurally efficient and reliable raft foundations in earthquake zones.
基金Project(41202220) supported by the National Natural Science Foundation of ChinaProject(20120022120003) supported by the Research Fund for the Doctoral Program of Higher Education,ChinaProject(2-9-2012-65) supported by the Fundamental Research Funds for the Central Universities,China
文摘Adjacent high-rise building with CFG pile composite foundation was studied using model test method to investigate stress and displacement of the foundation pile retaining structure, the subsidence and transmogrification law of the composite foundation. Two different project cases with and without high-rise building adjacent to pile foundation were compared. The relationships of slope pile bending moment, earth pressure, pile top displacement and complex settlement with respect to time were obtained. 1) When there is no adjacent building, the displacement of supporting system caused by excavation is mainly in the horizontal direction; while when the adjacent building exists, the displacement of supporting system will be vertical. 2) When the excavation depth is less than or equal to the adjacent building's composite foundation depth, the force of supporting structure is uniform and has small value, at the same time, the pile strength is in fully use and the foundation is stable; while when the excavation depth is greater than the depth of adjacent building's composite foundation, the results will be opposite. 3) During the excavation process, the adjustment of the composite ground loads on the supporting structure is carried out downward and the force of the supporting structure is reduced through the deformation of the bearing layer.