Self-build housing projects (SBHPs) among middle and high income developers are faced with many challenges that cause delay in the delivery time of the house(s). The focus of this paper is to analyse the factors that ...Self-build housing projects (SBHPs) among middle and high income developers are faced with many challenges that cause delay in the delivery time of the house(s). The focus of this paper is to analyse the factors that cause delay in SBHPs in order to identify the critical delay factors. Review of literature and expert input revealed 20 variables which were used in a structured questionnaire for data collection from owners, consultants and builders in Wa Municipality. Reliability test, t-test analysis and mean ranking were used in the data analysis. The results revealed that “Delay in obtaining permit from Local Authorities” was the first delay factor followed by “Poor site management and supervision”. The delay factor ranked least was “Inadequate cost estimation and related details” from consultants. The paper recommends that Government agencies that regulate physical development should intensify public education, particularly on responsibilities and obligations, especially among self-builders. The paper recommends further study into labour-related issues as well as communication and information management among participants and its impact on self-build project success.展开更多
Through questionnaire survey and field interview of farmers and herdsmen,this paper studied the comfortable housing projects implemented since 2006 in Namling County of Shigatse City.Taking the comfortable housing pro...Through questionnaire survey and field interview of farmers and herdsmen,this paper studied the comfortable housing projects implemented since 2006 in Namling County of Shigatse City.Taking the comfortable housing projects in Namling County as an example,this paper elaborated the relationship between the poverty alleviation and the comfortable housing projects for farmers and herdsmen and discussed the necessities for implementing comfortable housing projects in the context of the poverty alleviation.There are some problems at the same time of social,economic and ecological benefits of implementing the comfortable housing projects for farmers and herdsmen.Finally,it came up with pertinent recommendations for strengthening and improving the construction of comfortable housing projects in Namling County.展开更多
Real estate has been one of the fastest growing sectors in China since its opening to the outside world. The sustained, steady growth of the national economy has provided favourable conditions for the rapid growth of ...Real estate has been one of the fastest growing sectors in China since its opening to the outside world. The sustained, steady growth of the national economy has provided favourable conditions for the rapid growth of the real estate industry, and the higher profits anticipated have attracted a large volume of overseas capital into the industry. Various real estate companies have flourished, and a number of luxury hotels, villas and holiday展开更多
This paper establishes a 3D numerical model for 15# hydropower house of the Three Gorges Project (TGP) and performs a nonlinear static and dynamic damage analysis. In this numerical model, a coupling model of finite a...This paper establishes a 3D numerical model for 15# hydropower house of the Three Gorges Project (TGP) and performs a nonlinear static and dynamic damage analysis. In this numerical model, a coupling model of finite and infinite elements for simulating infinite foundation of hydropower station is adopted. A plastic-damage model based on continuum damage mechanics, which includes the softening and damage behavior under tension is considered for the concrete material. The dynamic equilibrium equations of motion are solved by using the HilberHughes-Taylor (HHT) time integration method. Firstly, the static damage response analysis of the hydropower station is conducted due to high tensile stress resulting from large water head and diameter of an inlet pipe. Then, on the basis of static simulation, the dynamic damage analysis of hydropower house subjected to earthquake motion is simulated. Numerical results show that under large water head and diameter of an inlet pipe of the project, the damages are mainly located near the top of the spiral case from the inlet section to the 0° section; under combined loadings of static loads and earthquake, the damages of the concrete surrounding the spiral case increase insignificantly; however, some damages occur on the side walls of the main powerhouse.展开更多
文摘Self-build housing projects (SBHPs) among middle and high income developers are faced with many challenges that cause delay in the delivery time of the house(s). The focus of this paper is to analyse the factors that cause delay in SBHPs in order to identify the critical delay factors. Review of literature and expert input revealed 20 variables which were used in a structured questionnaire for data collection from owners, consultants and builders in Wa Municipality. Reliability test, t-test analysis and mean ranking were used in the data analysis. The results revealed that “Delay in obtaining permit from Local Authorities” was the first delay factor followed by “Poor site management and supervision”. The delay factor ranked least was “Inadequate cost estimation and related details” from consultants. The paper recommends that Government agencies that regulate physical development should intensify public education, particularly on responsibilities and obligations, especially among self-builders. The paper recommends further study into labour-related issues as well as communication and information management among participants and its impact on self-build project success.
文摘Through questionnaire survey and field interview of farmers and herdsmen,this paper studied the comfortable housing projects implemented since 2006 in Namling County of Shigatse City.Taking the comfortable housing projects in Namling County as an example,this paper elaborated the relationship between the poverty alleviation and the comfortable housing projects for farmers and herdsmen and discussed the necessities for implementing comfortable housing projects in the context of the poverty alleviation.There are some problems at the same time of social,economic and ecological benefits of implementing the comfortable housing projects for farmers and herdsmen.Finally,it came up with pertinent recommendations for strengthening and improving the construction of comfortable housing projects in Namling County.
文摘Real estate has been one of the fastest growing sectors in China since its opening to the outside world. The sustained, steady growth of the national economy has provided favourable conditions for the rapid growth of the real estate industry, and the higher profits anticipated have attracted a large volume of overseas capital into the industry. Various real estate companies have flourished, and a number of luxury hotels, villas and holiday
基金Supported by National Natural Science Foundation of China (No.50679009)Key Laboratory for Scientific Research of Department of Education in Liaoning Province (No.2008S045)
文摘This paper establishes a 3D numerical model for 15# hydropower house of the Three Gorges Project (TGP) and performs a nonlinear static and dynamic damage analysis. In this numerical model, a coupling model of finite and infinite elements for simulating infinite foundation of hydropower station is adopted. A plastic-damage model based on continuum damage mechanics, which includes the softening and damage behavior under tension is considered for the concrete material. The dynamic equilibrium equations of motion are solved by using the HilberHughes-Taylor (HHT) time integration method. Firstly, the static damage response analysis of the hydropower station is conducted due to high tensile stress resulting from large water head and diameter of an inlet pipe. Then, on the basis of static simulation, the dynamic damage analysis of hydropower house subjected to earthquake motion is simulated. Numerical results show that under large water head and diameter of an inlet pipe of the project, the damages are mainly located near the top of the spiral case from the inlet section to the 0° section; under combined loadings of static loads and earthquake, the damages of the concrete surrounding the spiral case increase insignificantly; however, some damages occur on the side walls of the main powerhouse.