期刊文献+
共找到172篇文章
< 1 2 9 >
每页显示 20 50 100
Optimal Design of High-Speed Partial Flow Pumps using Orthogonal Tests and Numerical Simulations
1
作者 Jiaqiong Wang Tao Yang +2 位作者 Chen Hu Yu Zhang Ling Zhou 《Fluid Dynamics & Materials Processing》 EI 2024年第6期1203-1218,共16页
To investigate the influence of structural parameters on the performances and internal flow characteristics of partial flow pumps at a low specific speed of 10000 rpm,special attention was paid to the first and second... To investigate the influence of structural parameters on the performances and internal flow characteristics of partial flow pumps at a low specific speed of 10000 rpm,special attention was paid to the first and second stage impeller guide vanes.Moreover,the impeller blade outlet width,impeller inlet diameter,blade inclination angle,and number of blades were considered for orthogonal tests.Accordingly,nine groups of design solutions were formed,and then used as a basis for the execution of numerical simulations(CFD)aimed at obtaining the efficiency values and heads for each design solution group.The influence of impeller geometric parameters on the efficiency and head was explored,and the“weight”of each factor was obtained via a range analysis.Optimal structural parameters were finally chosen on the basis of the numerical simulation results,and the performances of the optimized model were verified accordingly(yet by means of CFD).Evidence is provided that the increase in the efficiency and head of the optimized model was 12.11%and 23.5 m,respectively,compared with those of the original model. 展开更多
关键词 high-speed partial flow pump orthogonal test optimal design numerical calculation
下载PDF
Research on the strain gauge mounting scheme of track wheel force measurement system based on high-speed wheel/rail relationship test rig
2
作者 Yuanwu Cai Bo Chen Chongyi Chang 《Railway Sciences》 2024年第4期503-513,共11页
Purpose-This paper aims to analyze the stress and strain distribution on the track wheel web surface and study the optimal strain gauge location for force measurement system of the track wheel.Design/methodology/appro... Purpose-This paper aims to analyze the stress and strain distribution on the track wheel web surface and study the optimal strain gauge location for force measurement system of the track wheel.Design/methodology/approach-Finite element method was employed to analyze the stress and strain distribution on the track wheel web surface under varying wheel-rail forces.Locations with minimal coupling interference between vertical and lateral forces were identified as suitable for strain gauge installation.Findings-The results show that due to the track wheel web’s unique curved shape and wheel-rail force loading mechanism,both tensile and compressive states exit on the surface of the web.When vertical force is applied,Mises stress and strain are relatively high near the inner radius of 710 mm and the outer radius of 1110mmof the web.Under lateral force,high Mises stress and strain are observed near the radius of 670mmon the inner and outer sides of the web.As the wheel-rail force application point shifts laterally toward the outer side,the Mises stress and strain near the inner radius of 710 mm of the web gradually decrease under vertical force while gradually increasing near the outer radius of 1110 mm of the web.Under lateral force,the Mises stress and strain on the surface of the web remain relatively unchanged regardless of the wheel-rail force application point.Based on the analysis of stress and strain on the surface of the web under different wheel-rail forces,the inner radius of 870 mm is recommended as the optimal mounting location of strain gauges for measuring vertical force,while the inner radius of 1143 mm is suitable for measuring lateral force.Originality/value-The research findings provide valuable insights for determining optimal strain gauge locations and designing an effective track wheel force measurement system. 展开更多
关键词 Track wheel high-speed wheel/rail relationship test rig Instrumented wheelset Strain gauge Finite element
下载PDF
Torque effect on vibration behavior of high-speed train gearbox under internal and external excitations
3
作者 Yue Zhou Xi Wang +5 位作者 Hongbo Que Rubing Guo Xinhai Lin Siqin Jin Chengpan Wu Yu Hou 《Railway Engineering Science》 EI 2024年第2期229-243,共15页
The high-speed train transmission system,experiencing both the internal excitation originating from gear meshing and the external excitation originating from the wheel-rail interaction,exhibits complex dynamic behavio... The high-speed train transmission system,experiencing both the internal excitation originating from gear meshing and the external excitation originating from the wheel-rail interaction,exhibits complex dynamic behavior in the actual service environment.This paper focuses on the gearbox in the high-speed train to carry out the bench test,in which various operat-ing conditions(torques and rotation speeds)were set up and the excitation condition covering both internal and external was created.Acceleration responses on multiple positions of the gearbox were acquired in the test and the vibration behavior of the gearbox was studied.Meanwhile,a stochastic excitation modal test was also carried out on the test bench under different torques,and the modal parameter of the gearbox was identified.Finally,the sweep frequency response of the gearbox under gear meshing excitation was analyzed through dynamic modeling.The results showed that the torque has an attenuating effect on the amplitude of gear meshing frequency on the gearbox,and the effect of external excitation on the gearbox vibration cannot be ignored,especially under the rated operating condition.It was also found that the torque affects the modal param-eter of the gearbox significantly.The torque has a great effect on both the gear meshing stiffness and the bearing stiffness in the transmission system,which is the inherent reason for the changed modal characteristics observed in the modal test and affects the vibration behavior of the gearbox consequently. 展开更多
关键词 high-speed train GEARBOX Bench test Vibration behavior Modal identification
下载PDF
Study of the Lift Force Induced by An Interceptor on A High-Speed Mono-Hull:The Affecting Factors and Estimation Formula
4
作者 DENG Rui HU Yu-xiao +3 位作者 HUANG Si-chong SONG Zhi-jie WANG Shi-gang WU Tie-cheng 《China Ocean Engineering》 SCIE EI CSCD 2024年第4期557-571,共15页
To find a better way to estimate the lift force induced by an interceptor on a high-speed mono-hull ship,a series of high-speed mono-hull ship models are designed and investigated under different conditions.Different ... To find a better way to estimate the lift force induced by an interceptor on a high-speed mono-hull ship,a series of high-speed mono-hull ship models are designed and investigated under different conditions.Different lift forces are obtained by numerical calculations and validated by a model test in a towing tank.The factors that influence the force are the interceptor height,velocity,draft,and deadrise angle.The relationship between each factor and the induced lift force is investigated and obtained.We found that the induced lift mainly depends on the interceptor height and advancing velocity,and is proportional to the square of the interceptor height and velocity.The results also showed that the effects of the draft and deadrise angle are relatively less important,and the relationship between the induced lift and these two factors is generally linear.Based on the results,a formula including the combined effect of all factors used to estimate the lift force induced by the interceptor is developed based on systematic analysis.The proposed formula could be used to estimate the lift force induced by interceptors,especially under high-speed condition. 展开更多
关键词 high-speed mono-hull ship INTERCEPTOR lift force formula lift force towing tank test computational fluid dynamics
下载PDF
Methodology to Evaluate Fatigue Damage of High-Speed Train Welded Bogie Frames Based on On-Track Dynamic Stress Test Data 被引量:5
5
作者 Guangxue Yang Meng Wang +1 位作者 Qiang Li Ran Ding 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2019年第3期181-188,共8页
The current method of estimating the fatigue life of railway structures is to calculating the equivalent stress amplitude based on the measured stress data. However, the random of the measured data is not considered. ... The current method of estimating the fatigue life of railway structures is to calculating the equivalent stress amplitude based on the measured stress data. However, the random of the measured data is not considered. In this paper, a new method was established to compute the equivalent stress amplitude to evaluate the fatigue damage based on the measurable randomness, since the equivalent stress is the key parameter for assessment of structure fatigue life and load derivation. The equivalent stress amplitude of a high-speed train welded bogie frame was found to obey normal distribution under uniform operation route that verified by on-track dynamic stress data, and the proposed model is, in effect, an improved version of the mathematical model used to calculate the equivalent stress amplitude. The data of a long-term, on-track dynamic stress test program was analyzed to find that the normal distribution parameters of equivalent stress amplitude values differ across different operation route. Thus, the fatigue damage of the high-speed train welded bogie frame can be evaluated by the proposed method if the running schedule of the train is known a priori. The results also showed that the equivalent stress amplitude of the region connected to the power system is more random than in other regions of the bogie frame. 展开更多
关键词 Fatigue damage evaluation Equivalent STRESS amplitude On-track dynamic STRESS test Welded BOGIE frame of high-speed TRAIN
下载PDF
An Investigation into the Effects of the Reynolds Number on High-Speed Trains Using a Low Temperature Wind Tunnel Test Facility 被引量:6
6
作者 Yundong Han Dawei Chen +1 位作者 Shaoqing Liu Gang Xu 《Fluid Dynamics & Materials Processing》 EI 2020年第1期1-19,共19页
A series of tests have been conducted using a Cryogenic Wind Tunnel to study the effect of Reynolds number(Re)on the aerodynamic force and surface pressure experienced by a high speed train.The test Reynolds number ha... A series of tests have been conducted using a Cryogenic Wind Tunnel to study the effect of Reynolds number(Re)on the aerodynamic force and surface pressure experienced by a high speed train.The test Reynolds number has been varied from 1 million to 10 million,which is the highest Reynolds number a wind tunnel has ever achieved for a train test.According to our results,the drag coefficient of the leading car decreases with higher Reynolds number for yaw angles up to 30º.The drag force coefficient drops about 0.06 when Re is raised from 1 million to 10 million.The side force is caused by the high pressure at the windward side and the low pressure generated by the vortex at the lee side.Both pressure distributions are not appreciably affected by Reynolds number changes at yaw angles up to 30°.The lift force coefficient increases with higher Re,though the change is small.At a yaw angle of zero the down force coefficient is reduced by a scale factor of about 0.03 when the Reynolds number is raised over the considered range.At higher yaw angles the lift force coefficient is reduced about 0.1.Similar to the side force coefficient,the rolling moment coefficient does not change much with Re.The magnitude of the pitching moment coefficient increases with higher Re.This indicates that the load on the front bogie is higher at higher Reynolds numbers.The yawing moment coefficient increases with Re.This effect is more evident at higher yaw angles.The yawing moment coefficient increases by about 6%when Re is raised from 1 million to 10 million.The influence of Re on the rolling moment coefficient around the leeward rail is relatively smaller.It increases by about 2%over the considered range of Re. 展开更多
关键词 high-speed train wind tunnel test reynolds number effect aerodynamic performance yaw angle
下载PDF
Model tests on XCC-piled embankment under dynamic train load of high-speed railways 被引量:6
7
作者 Niu Tingting Liu Hanlong +1 位作者 Ding Xuanming Zheng Changjie 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2018年第3期581-594,共14页
Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under... Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under the dynamic train load of a high-speed railway is not yet understood.In light of this,a heavily instrumented piled embankment model was set up,and a model test was carried out,in which a servo-hydraulic actuator outputting M-shaped waves was adopted to simulate the process of a running train.Earth pressure,settlement,strain in the geogrid and pile and excess pore water pressure were measured.The results show that the soil arching height under the dynamic train load of a high-speed railway is shorter than under static loading.The growth trend for accumulated settlement slowed down after long-term vibration although there was still a tendency for it to increase.Accumulated geogrid strain has an increasing tendency after long-term vibration.The closer the embankment edge,the greater the geogrid strain over the subsoil.Strains in the pile were smaller under dynamic train loads,and their distribution was different from that under static loading.At the same elevation,excess pore water pressure under the track slab was greater than that under the embankment shoulder. 展开更多
关键词 piled embankment model test dynamic train load of high-speed railways XCC-pile M-shaped wave
下载PDF
PIV analysis and high-speed photographic observation of cavitating flow field behind circular multi-orifice plates 被引量:2
8
作者 Zhi-ping Guo Xi-huan Sun Zhi-yong Dong 《Water Science and Engineering》 EI CAS CSCD 2020年第2期145-153,共9页
Based on a self-developed hydrodynamic cavitation device with different geometric parameters for circular multi-orifice plates,turbulence characteristics of cavitating flow behind multi-orifice plates,including the ef... Based on a self-developed hydrodynamic cavitation device with different geometric parameters for circular multi-orifice plates,turbulence characteristics of cavitating flow behind multi-orifice plates,including the effects of orifice number and orifice layout on longitudinal velocity,turbulence intensity,and Reynolds stress,were measured with the particle image velocimetry(PIV)technique.Flow regimes of the cavitating flow were also observed with high-speed photography.The experimental results showed the following:(1)high-velocity multiple cavitating jets occurred behind the multi-orifice plates,and the cavitating flow fields were characterized by topological structures;(2)the longitudinal velocity at each cross-section exhibited a sawtooth-like distribution close to the multi-orifice plate,and each sawtooth indicated one jet issuing from one orifice;(3)there were similar magnitudes and forms for the longitudinal and vertical turbulence intensities at the same cross-section;(4)the variation in amplitude of Reynolds stress increased with an increase in orifice number;and(5)the cavitation clouds in the flow fields became denser with the increase in orifice number,and the clouds generated by the staggered layout of orifices were greater in number than those generated by the checkerboard-type one for the same orifice number.The experimental results can be used to analyze the mechanism of killing pathogenic microorganisms through hydrodynamic cavitation. 展开更多
关键词 Cavitating flow Circular multi-orifice plate PIV technique high-speed photography Turbulence characteristics
下载PDF
In-Situ Test on Fatigue Characteristics of Top-Mounted Dividable Pile-Board Subgrade for High-Speed Railway 被引量:5
9
作者 苏谦 白皓 +1 位作者 王迅 蒋浩然 《Journal of Southwest Jiaotong University(English Edition)》 2010年第1期8-12,共5页
To simulate the fatigue characteristics of the pile-board structure under long-term dynamic load, using the in-situ dynamic testing system DTS-1, the forced vibration loading was repeated one million times at differen... To simulate the fatigue characteristics of the pile-board structure under long-term dynamic load, using the in-situ dynamic testing system DTS-1, the forced vibration loading was repeated one million times at different cross-sections of the pile-board structure for high-speed railway. The dynamic deformation, permanent deformation and dynamic stress of main reinforcements were measured. The test results show that the dynamic responses of the pile-board structure almost did not vary with the forced vibration times under the simulated trainload. After one million times of forced vibration, the permanent deformations of the midspan section of intermediate span and midspan section of side span were 0.7 mm and 0. 6 mm, respectively, and there was no accumulative plastic deformation at the bearing section of intermediate span. 展开更多
关键词 high-speed railway Top-mounted dividable pile-board structure In-situ test Forced vibration test Fatigue characteristics
下载PDF
Image-Aided Analysis of Ballast Particle Movement Along a High-Speed Railway
10
作者 Xuecheng Bian Wenqing Cai +2 位作者 Zheng Luo Chuang Zhao Yunmin Chen 《Engineering》 SCIE EI CAS CSCD 2023年第8期161-177,共17页
As a core infrastructure of high-speed railways,ballast layers constituted by graded crushed stones feature noteworthy particle movement compared with normal railways,which may cause excessive settlement and have detr... As a core infrastructure of high-speed railways,ballast layers constituted by graded crushed stones feature noteworthy particle movement compared with normal railways,which may cause excessive settlement and have detrimental effects on train operation.However,the movement behavior remains ambiguous due to a lack of effective measurement approaches and analytical methods.In this study,an image-aided technique was developed in a full-scale model test using digital cameras and a colorbased identification approach.A total of 1274 surface ballast particles were manually dyed by discernible colors to serve as tracers in the test.The movements of the surface ballast particles were tracked using the varied pixels displaying tracers in the photos that were intermittently taken during the test in the perpendicular direction.The movement behavior of ballast particles under different combinations of train speeds and axle loads was quantitatively evaluated.The obtained results indicated that the surface ballast particle movements were slight,mainly concentrated near sleepers under low-speed train loads and greatly amplified and extended to the whole surface when the train speed reached 360 km.h-1.Additionally,the development of ballast particle displacement statistically resembled its rotation.Track vibration contributed to the movements of ballast particles,which specifically were driven by vertical acceleration near the track center and horizontal acceleration at the track edge.Furthermore,the development trends of ballast particle movements and track settlement under long-term train loading were similar,and both stabilized at nearly the same time.The track performance,including the vibration characteristics,accumulated settlement,and sleeper support stiffness,was determined to be closely related to the direction and distribution of ballast particle flow,which partly deteriorated under high-speed train loads. 展开更多
关键词 high-speed railway Full-scale model test Image-aided technique Ballast particle movement Track vibration Accumulated settlement
下载PDF
Novel dynamic test system for simulating high-speed train moving on bridge under earthquake excitation 被引量:1
11
作者 LIU Han-yun YU Zhi-wu +1 位作者 GUO Wei JIANG Li-zhong 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第8期2485-2501,共17页
China’s high-speed railways are always facing the potential damage risk induced by strong earthquakes.And the route design concept of“using bridge instead of embankment”has also greatly increased the probability of... China’s high-speed railways are always facing the potential damage risk induced by strong earthquakes.And the route design concept of“using bridge instead of embankment”has also greatly increased the probability of high speed trains moving on bridges when a strong earthquake happens.In the past decades,a bunch of theoretical and numerical studies have been conducted in the seismic dynamic field of high-speed railway.However,the effective dynamic test system for verifying the given method and theoretical results is still lacking.Therefore,a novel dynamic test system(DTS)consisting of a shaking table array and a train-pass-bridge reduced-scale model is proposed in this paper.Through some crucial technical problems discussion,the effectiveness of similar design scheme and the feasibility of reduced-scale DTS are elaborated,and then the detailed DTS structures are given and displayed as part-by-part.On this basis,the demonstration tests are conducted and compared with the numerical simulation.The results show that the proposed DTS is accurate and effective.Therefore,the DTS can provide a new physical simulation approach to study the high-speed train’s running safety on bridges under earthquakes and can also provide a reference for the construction of related systems. 展开更多
关键词 strong earthquake high-speed train shaking table test dynamic test system similar design BRIDGE
下载PDF
Analysis of droplet transfer of pulsed MIG welding based on electrical signal and high-speed photography 被引量:1
12
作者 姚屏 薛家祥 +1 位作者 黄文超 张瑞 《China Welding》 EI CAS 2009年第1期67-72,共6页
In order to study how welding parameters affect welding quality and droplet transfer, a synchronous acquisition and analysis system is established to acquire and analyze electrical signal and instantaneous images of d... In order to study how welding parameters affect welding quality and droplet transfer, a synchronous acquisition and analysis system is established to acquire and analyze electrical signal and instantaneous images of droplet transfer simultaneously, which is based on a self-developed soft-switching inverter. On the one hand, welding current and voltage signals are acquired and analyzed by a self-developed dynamic wavelet analyzer. On the other hand, images are filtered and optimized after they are captured by high-speed camera. The results show that instantaneous waveforms and statistical data of electrical signal contribute to make an overall assessment of welding quality, and that optimized high-speed images allow a visual and clear observation of droplet transfer process. The analysis of both waveforms and images leads to a further research on droplet transfer mechanism and provides a basis for precise control of droplet transfer. 展开更多
关键词 pulsed MIG welding droplet transfer high-speed photography image processing wavelet analysis
下载PDF
TEST METHOD OF HIGH-SPEED ON-OFF VALVE DYNAMIC CHARACTERISTICS 被引量:2
13
作者 FU Linjian KONG Xiaowu QIU Minxiu 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2006年第1期63-66,共4页
According to the valve port features of high speed on-off valve and its actions, the valve port can be simplified into an a-type half bridge construction. A method that tests the dynamic characteristics of the high sp... According to the valve port features of high speed on-off valve and its actions, the valve port can be simplified into an a-type half bridge construction. A method that tests the dynamic characteristics of the high speed on-off valve by the output pressure signal of the a-type half bridge is proposed. Having analyzed the factors related to the dynamic characteristics of an a-type half bridge, a rule for designing the outlet chamber's volume is worked out. According to the rule, a test stand is built to test the self-developed high-speed on-off valve. From the test results, it can be seen that with the outlet chamber's volume controlled by the rule the rise time of the pressure signals driven by signals with different frequencies changes very little. The test results conform to the simulation results, which nroves the correctness of the method. 展开更多
关键词 high-speed on-off valve Dynamic characteristics test method
下载PDF
Full-scale multi-functional test platform for investigating mechanical performance of track–subgrade systems of high-speed railways 被引量:2
14
作者 Wanming Zhai Kaiyun Wang +3 位作者 Zhaowei Chen Shengyang Zhu Chengbiao Cai Gang Liu 《Railway Engineering Science》 2020年第3期213-231,共19页
Motivated by the huge practical engineering demand for the fundamental understanding of mechanical characteristics of high-speed railway infrastructure,a fullscale multi-functional test platform for high-speed railway... Motivated by the huge practical engineering demand for the fundamental understanding of mechanical characteristics of high-speed railway infrastructure,a fullscale multi-functional test platform for high-speed railway track–subgrade system is developed in this paper,and its main functions for investigating the mechanical performance of track–subgrade systems are elaborated with three typical experimental examples.Comprising the full-scale subgrade structure and all the five types of track structures adopted in Chinese high-speed railways,namely the CRTS I,the CRTS II and the CRTS III ballastless tracks,the double-block ballastless track and the ballasted track,the test platform is established strictly according to the construction standard of Chinese high-speed railways.Three kinds of effective loading methods are employed,including the real bogie loading,multi-point loading and the impact loading.Various types of sensors are adopted in different components of the five types of track–subgrade systems to measure the displacement,acceleration,pressure,structural strain and deformation,etc.Utilizing this test platform,both dynamic characteristics and long-term performance evolution of high-speed railway track–subgrade systems can be investigated,being able to satisfy the actual demand for large-scale operation of Chinese high-speed railways.As examples,three typical experimental studies are presented to elucidate the comprehensive functionalities of the full-scale multi-functional test platform for exploring the dynamic performance and its long-term evolution of ballastless track systems and for studying the long-term accumulative settlement of the ballasted track–subgrade system in high-speed railways.Some interesting phenomena and meaningful results are captured by the developed test platform,which provide a useful guidance for the scientific operation and maintenance of high-speed railway infrastructure. 展开更多
关键词 Full-scale test high-speed railway Track–subgrade system Ballastless track Ballasted track Mechanical performance Long-term performance evolution Damage and degradation
下载PDF
Review of aerodynamics of high-speed train-bridge system in crosswinds 被引量:20
15
作者 HE Xu-hui LI Huan 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第4期1054-1073,共20页
Serviceability and running safety of the high-speed train on/through a bridge are of major concern in China. Due to the uncertainty chain of the train dynamic analysis in crosswinds originating mainly from the aerodyn... Serviceability and running safety of the high-speed train on/through a bridge are of major concern in China. Due to the uncertainty chain of the train dynamic analysis in crosswinds originating mainly from the aerodynamic assessment, this paper primarily reviews five meaningful progresses on the aerodynamics of the train-bridge system done by Wind Tunnel Laboratory of Central South University in the past several years. Firstly, the flow around the train and the uncertainty origin of the aerodynamic assessment are described from the fluid mechanism point of view. After a brief introduction of the current aerodynamic assessment methods with their strengths and weaknesses, a new-developed TRAIN-INFRASTRUCTURE rig with the maximum launch speed of 35 m/s is introduced. Then, several benchmark studies are presented, including the statistic results of the characterized geometry parameters of the currently utilized bridge-decks, the aerodynamics of the train, and the aerodynamics of the flat box/truss bridge-decks. Upon compared with the foregoing mentioned benchmarks, this paper highlights the aerodynamic interference of the train-bridge system associated with its physical natures. Finally, a porosity-and orientation-adjustable novel wind barrier with its effects on the aerodynamics of the train-bridge system is discussed. 展开更多
关键词 high-speed railway train-bridge system wind barrier crosswinds aerodynamic assessment wind tunnel test
下载PDF
Ground-borne vibration generated by high-speed train viaduct systems in soft-upper/hard-lower rock strata 被引量:4
16
作者 XING Meng-ting WANG Ping +2 位作者 ZHAO Cai-you WU Xue KANG Xiu-shan 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第7期2140-2157,共18页
An experimental study and theoretical analysis were carried out to explore the ground-borne vibration generated by elevated high-speed railway in rock strata.Taking a typical rail line constructed on rock area in Chin... An experimental study and theoretical analysis were carried out to explore the ground-borne vibration generated by elevated high-speed railway in rock strata.Taking a typical rail line constructed on rock area in China as the research object,a set of field tests was performed on Rizhao-Lankao High-Speed Railway,the bridge and ground vibrations were measured as trains passed at 330−340 km/h,then the transferring law and spatial distribution under individual frequencies were investigated.The experiment results indicate that the bridge frequency spectrum exhibited relatively high-frequency vibration peaks caused by short-wavelength irregularity;ground vibration farther than 30 m away can be amplified with a higher frequency and numerous components.Furthermore,the wave propagation equation of a stratified rock strata was established based on direct-stiffness method to explore the vibration attenuation rules via frequency-domain analysis.It is found that the rock area has a weaker correlation between vibration transmissibility and frequency,thicker and harder rock strata loss their vibration attenuation capacity.It can be concluded that the high-speed railways induced vibration on rock strata shows a wide frequency band and large amplitude,the design of reducing vibration aimed at specific frequency is important according to next more detailed numerical study. 展开更多
关键词 rock stratum vibration and wave elevated high-speed railways in situ test transferring law
下载PDF
Fatigue Characterization on a Cast Aluminum Beam of a High-Speed Train Through Numerical Simulation and Experiments 被引量:1
17
作者 Weiyuan Dou Lele Zhang +2 位作者 Haifeng Chang Haifeng Zhang Changqing Liu 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2021年第5期349-359,共11页
The cast aluminum beam is a key structure for carrying the body-hung traction motor of a high-speed train;its fatigue property is fundamental for predicting the residual life and service mileage of the structure.To ch... The cast aluminum beam is a key structure for carrying the body-hung traction motor of a high-speed train;its fatigue property is fundamental for predicting the residual life and service mileage of the structure.To characterize the structural fatigue property,a finite element-based method is developed to compute the stress concentration factor,which is used to obtain the structural fatigue strength reduction factors.A full-scale fatigue test on the cast aluminum beam is designed and implemented for up to ten million cycles,and the corresponding finite element model of the beam is validated using the measured data of the gauges.The results show that the maximum stress concentration occurs at the fillet of the supporting seat,where the structural fatigue strength reduction factor is 2.45 and the calculated fatigue limit is 35.4 MPa.Moreover,no surface cracks are detected using the liquid penetrant test.Both the experimental and simulation results indicate that the cast aluminum beam can satisfy the service life requirements under the designed loading conditions. 展开更多
关键词 high-speed train Cast aluminum beam Fatigue test Stress concentration Fatigue strength reduction factor
下载PDF
Experimental and Numerical Investigation on the External Aerodynamic Noise of High-Speed Train 被引量:1
18
作者 Shijie Jiang Song Yang +1 位作者 Bohong Zhang Bangchun Wen 《Sound & Vibration》 2019年第4期129-138,共10页
Aerodynamic noise is the dominant noise source of the high-speed train.It not only seriously affects the passenger comfort and people’s normal life along the railway line,but also may cause fatigue damage to the surr... Aerodynamic noise is the dominant noise source of the high-speed train.It not only seriously affects the passenger comfort and people’s normal life along the railway line,but also may cause fatigue damage to the surrounding equipment and buildings.This manuscript carried out the simulation and experimental study on the external aerodynamic noise of high-speed train,in order to increase the understanding of the noise and hence to be better able to control it.The on-line tests were performed to verify that it is reasonable to simplify the high-speed train model.The turbulent air flow model was then developed,and the external steady flow field was computed by Realizable k-εturbulence model.Based on the steady flow field,aerodynamic noise sources on the train surface and the external transient flow field were calculated by broadband acoustics source model and large eddy simulation(LES)respectively.The pressures on the train surface were obtained from the results of the transient model.Considering the transient flow field,the far-field aerodynamic noise generated by the high-speed train was finally obtained based on Lighthill-Curle theory.Through the comparison between simulations and on-line tests,it is shown that the numerical model gives reliable aerodynamic noise predictions.This research is significant to the study and control of the aerodynamic noise of high-speed train. 展开更多
关键词 high-speed train aerodynamic noise Lighthill-Curle theory simulated analysis on-line test
下载PDF
RESEARCH ON SCHEME OF HIGH-SPEED ROTOR/WING TRANSITION HELICOPTER RD15
19
作者 WANGHuan-jin GAOZheng 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI 2004年第4期247-252,共6页
To analyze the existing schemes of high-speed rotorcrafts and some new technologies, a new conceptual sketch of the high-speed rotor/wing transition helicopter RD15 is proposed. The overall layout of the RD15 is given... To analyze the existing schemes of high-speed rotorcrafts and some new technologies, a new conceptual sketch of the high-speed rotor/wing transition helicopter RD15 is proposed. The overall layout of the RD15 is given out and the transition process from the helicopter mode to the airplane mode is designed. The lift system consists of a circular disk-wing with four retractable blades. The technology of individual blade control is adopted for flight control in hover and low speed flight. The tail is a vectored thrust duct propeller. It can provide the anti-torque in hover, and offer the multi-directional controls and propulsion drive for the airplane mode flight. The aerodynamic characteristics and key technologies in the transition process for this layout, including the nose up angle of disk-wing, the length of the blade, rotation speed, pitch angle and other parameters, are theoretically ana lyzed and experimentally tested. Calculation and experiments show that the shift process of the lift, the power and controls are smooth, and the designed scheme is feasible. 展开更多
关键词 high-speed rotor/wing transition helicopter vectored thrust duct propeller conceptual sketch aerodynamic analysis and test
下载PDF
Settlement Characteristics of Cement Fly-Ash GravelPile-Plate Composite Foundation of High-Speed Railway
20
作者 朱明 冷旷代 马建林 《Journal of Southwest Jiaotong University(English Edition)》 2010年第1期13-18,共6页
Field tests on settlement characteristics were carried out on the cement fly-ash gravel (CFG) pile-plate composite foundation on Beijing-Xuzhou section of Beijing-Shanghai high-speed railway. The settlements of the ... Field tests on settlement characteristics were carried out on the cement fly-ash gravel (CFG) pile-plate composite foundation on Beijing-Xuzhou section of Beijing-Shanghai high-speed railway. The settlements of the piles and the soil between pries were measured and analyzed. The results show that the settlement-time dependency experienced three phases: rapid development phase, stable development phase and stable phase. Therefore, surcharge preloading was necessary to reduce the settlement after construction. The finite element software Plaxis was used to calculate the deformations of the pile top and the soil between piles at the embankment center, as well as the settlements of CFG pile reinforcement area and the underlying stratum under surcharge preloading. The calculation results and the field test results were compared and analyzed. Both the results show that the settlement of the composite foundation mainly occured in underlying stratum. The settlement characteristics of pile-plate composite foundation under high embankment are also concluded. 展开更多
关键词 high-speed railway CFG pile-plate composite foundation Settlement characteristics Field test
下载PDF
上一页 1 2 9 下一页 到第
使用帮助 返回顶部