期刊文献+
共找到197篇文章
< 1 2 10 >
每页显示 20 50 100
Human intrusion detection for high-speed railway perimeter under all-weather condition
1
作者 Pengyue Guo Tianyun Shi +1 位作者 Zhen Ma Jing Wang 《Railway Sciences》 2024年第1期97-110,共14页
Purpose – The paper aims to solve the problem of personnel intrusion identification within the limits of highspeed railways. It adopts the fusion method of millimeter wave radar and camera to improve the accuracy ofo... Purpose – The paper aims to solve the problem of personnel intrusion identification within the limits of highspeed railways. It adopts the fusion method of millimeter wave radar and camera to improve the accuracy ofobject recognition in dark and harsh weather conditions.Design/methodology/approach – This paper adopts the fusion strategy of radar and camera linkage toachieve focus amplification of long-distance targets and solves the problem of low illumination by laser lightfilling of the focus point. In order to improve the recognition effect, this paper adopts the YOLOv8 algorithm formulti-scale target recognition. In addition, for the image distortion caused by bad weather, this paper proposesa linkage and tracking fusion strategy to output the correct alarm results.Findings – Simulated intrusion tests show that the proposed method can effectively detect human intrusionwithin 0–200 m during the day and night in sunny weather and can achieve more than 80% recognitionaccuracy for extreme severe weather conditions.Originality/value – (1) The authors propose a personnel intrusion monitoring scheme based on the fusion ofmillimeter wave radar and camera, achieving all-weather intrusion monitoring;(2) The authors propose a newmulti-level fusion algorithm based on linkage and tracking to achieve intrusion target monitoring underadverse weather conditions;(3) The authors have conducted a large number of innovative simulationexperiments to verify the effectiveness of the method proposed in this article. 展开更多
关键词 high-speed rail perimeter Personnel invasion Object detection ALL-WEATHER Radar-camera fusion
下载PDF
Wireless channel estimation for high-speed rail communications:Challenges,solutions and future directions
2
作者 Xuying Chen Wei Chen +2 位作者 Xiao Gong Bo Ai Ian Wassell 《High-Speed Railway》 2023年第1期18-22,共5页
With the development of High-Speed Rail(HSR),countries and individual passengers alike have enjoyed far ranging benefits as a result-economic,social,environment and in added convenience.One of the important parts of H... With the development of High-Speed Rail(HSR),countries and individual passengers alike have enjoyed far ranging benefits as a result-economic,social,environment and in added convenience.One of the important parts of HSR construction is the signaling system,where wireless communications play a key role in the transmission of train control data.Channel estimation has a significant impact on the quality of the wireless communication,however,whose performance is degraded due to the fast mobility of HSR.This paper focuses on the channel estimation technology in HSR.We first summarize the key challenges for HSR channel estimation,especially the Inter-Carrier Interference(ICI)faced by Orthogonal Frequency Division Multiplexing(OFDM)systems.Then we provide a comprehensive review of existing pilot-aided channel estimation schemes from three points:channel model,estimation algorithm,joint channel estimation and ICI mitigation schemes.Lastly,we present the challenges of channel estimation for the Orthogonal Time Frequency Space(OTFS)system and Reconfigurable Intelligent Surface(RIS),which are promising techniques for HSR systems in the future sixth Generation(6G)wireless communication. 展开更多
关键词 Channel estimation high-speed rail Inter carrier interference
下载PDF
A review of high performance computing applications in high-speed rail systems
3
作者 Shenyuan Ren Yidong Li 《High-Speed Railway》 2023年第2期92-96,共5页
Further improving the railway innovation capacity and technological strength is the important goal of the 14th Five-Year Plan for railway scientific and technological innovation.It includes promoting the deep integrat... Further improving the railway innovation capacity and technological strength is the important goal of the 14th Five-Year Plan for railway scientific and technological innovation.It includes promoting the deep integration of cutting-edge technologies with the railway systems,strengthening the research and application of intelligent railway technologies,applying green computing technologies and advancing the collaborative sharing of transportation big data.The high-speed rail system tasks need to process huge amounts of data and heavy workload with the requirement of ultra-fast response.Therefore,it is of great necessity to promote computation efficiency by applying High Performance Computing(HPC)to high-speed rail systems.The HPC technique is a great solution for improving the performance,efficiency,and safety of high-speed rail systems.In this review,we introduce and analyze the application research of high performance computing technology in the field of highspeed railways.These HPC applications are cataloged into four broad categories,namely:fault diagnosis,network and communication,management system,and simulations.Moreover,challenges and issues to be addressed are discussed and further directions are suggested. 展开更多
关键词 High performance computing high-speed rail
下载PDF
Study on wear characteristics and authorized limits of switch rails of high-speed turnout
4
作者 Pu Wang Shuguo Wang +2 位作者 Jing Ge Daolin Si Dongsheng Yang 《Railway Sciences》 2023年第2期157-169,共13页
Purpose-It is quite universal for high-speed turnouts to be exposed to the wear of the stock rail of the switch rail during the service process.The wear will cause the change of railhead profile and the relative posit... Purpose-It is quite universal for high-speed turnouts to be exposed to the wear of the stock rail of the switch rail during the service process.The wear will cause the change of railhead profile and the relative positions of the switch rail and the stock rail,which will directly affect the wheel-rail contact state and wheel load transition when a train passes the turnout and will further impose serious impacts on the safety and stability of train operation.The purpose of this paper is to provide suggestions for wear management of high-speed turnout.Design/methodology/approach-The actual wear characteristics of switch rails of high-speed turnouts in different guiding directions were studied based on the monitoring results on site;the authorized wear limits for the switch rails of high-speed turnout were studied through derailment risk analysis and switch rail strength analysis.Findings-The results show that:the major factor for the service life of a curved switch rail is the lateral wear.The wear characteristics of the curved switch rail of a facing turnout are significantly different from those of a trailing turnout.To be specific,the lateral wear of the curved switch rail mainly occurs in the narrower section at its front end for a trailing turnout,but in the wider section at its rear end when for a facing turnout.The maximum lateral wear of a dismounted switch rail from a trailing turnout is found on the 15-mm wide section and is 3.9 mm,which does not reach the specified limit of 6 mm.For comparison,the lateral wear of a dismounted switch rail from a facing turnout is found from the 35-mm wide section to the full-width section and is greater than 7.5 mm,which exceeds the specified limit.Based on this,in addition to meeting the requirements of maintenance rules,the allowed wear of switch rails of high-speed turnout shall be so that the dangerous area with a tangent angle of wheel profile smaller than 43.68 will not contact the switch rail when the wheel is lifted by 2 mm.Accordingly,the lateral wear limit at the 5-mm wide section of the curved switch rail shall be reduced from 6 mm(as specified)to 3.5 mm.Originality/value-The work in this paper is of reference significance to the research on the development law of rail wear in high-speed turnout area and the formulation of relevant standards. 展开更多
关键词 high-speed turnout Switch rail Wear characteristics Authorized limit DErailMENT STRENGTH On-site monitoring
下载PDF
Dispatch coordination between high-speed and conventional rail systems 被引量:6
5
作者 Qiyuan PENG Chao WEN 《Journal of Modern Transportation》 2011年第1期19-25,共7页
Cross-line trains, as a link between high-speed and conventional rail networks, will increase the complexity of transport organization and lead to significant challenges in dispatch coordination between the two system... Cross-line trains, as a link between high-speed and conventional rail networks, will increase the complexity of transport organization and lead to significant challenges in dispatch coordination between the two systems. Based on the characteristics of high-speed transport organization, this paper deals with the necessity of dispatch coordination between high-speed and conventional lines from the following two perspectives: the operation of cross-line trains and work coordination in connection stations. An adjustment model for the operation of high-speed trains, taking cross-line trains into account, is established. Finally, the dispatch system is described in terms of construction and process. Methods for organizing dispatch are proposed, and the processes of coordination adjustment under normal and unexpected situations are analyzed. The discussion in this paper may serve as a theoretical basis for the development of high-speed rail dispatch systems. 展开更多
关键词 high-speed rail conventional rail DISPATCH COORDINATION
下载PDF
Dynamic responses of bridge-approach embankment transition section of high-speed rail 被引量:2
6
作者 杨长卫 孙海玲 +2 位作者 张建经 朱传彬 颜利平 《Journal of Central South University》 SCIE EI CAS 2013年第10期2830-2839,共10页
Based on the vehicle track coupling dynamics theory, a new spatial dynamic numerical model of vehicle track subgrade coupling system was established considering the interaction among different structural layers in the... Based on the vehicle track coupling dynamics theory, a new spatial dynamic numerical model of vehicle track subgrade coupling system was established considering the interaction among different structural layers in the subgrade system. The dynamic responses of the coupled system were analyzed when the speed of train was 350 km/h and the transition was filled with graded broken stones mixed with 5% cement. The results indicate that the setting form of bridge-approach embankment section has little effect on the dynamic responses, thus designers can choose it on account of the practical circumstances. Because the location about 5 m from the bridge abutment has the greatest deformation, the stiffness within 0 5 m zone behind the abutment should be specially designed. The results of the study from vehicle track dynamics show that the maximum allowable track deflection angle should be 0.09% and the coefficient of subgrade reaction(K30) is greater than 190 MPa within the 0 5 m zone behind the abutment and greater than 150 MPa in other zones. 展开更多
关键词 high-speed rail bridge-approach EMBANKMENT section numerical model TRACK DEFLECTION angle
下载PDF
Parameters studies for rail wear in high-speed railway turnouts by unreplicated saturated factorial design 被引量:2
7
作者 徐井芒 王平 +2 位作者 马晓川 钱瑶 陈嵘 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第4期988-1001,共14页
Rail wear is one of the main reasons for reducing the service life of high-speed railway turnouts in China. The rail wear characteristics of high-speed railway turnouts are influenced by a large number of input parame... Rail wear is one of the main reasons for reducing the service life of high-speed railway turnouts in China. The rail wear characteristics of high-speed railway turnouts are influenced by a large number of input parameters of the complex train-turnout system. To reproduce the actual operation conditions of railway turnouts, random distributions of these inputs need to be considered in rail wear simulation. For a given nominal layout of the high-speed railway turnout, 19 input parameters for rail wear simulation in high-speed railway turnouts are investigated based on orthogonal design of experiment. Three dynamic responses(wheel-rail friction work, normal contact force and size of contact patch) are defined as observed values and the significant factors(direction of passage, axle load, running speed, friction coefficient, and wheel and rail profiles) are determined by two unreplicated saturated factorial design methods, including the half-normal probability plot method and Dong 93 method. As part of the associated rail wear simulation, the influence of the wear models and the local elastic deformation on the rail wear was separately investigated. The calculation results for the wear models are quite different, especially for large creep mode. The local elastic deformation has a large effect on the sliding speed and rail wear and needs to be considered in the rail wear simulation. 展开更多
关键词 high-speed railWAY turnouts rail WEAR unreplicated saturated FACTORIAL design WEAR simulation
下载PDF
Prediction of high-speed train delay propagation based on causal text information
8
作者 Qianyi Liu Shengjie Wang +3 位作者 Zhongcan Li Li Li Jun Zhang Chao Wen 《Railway Engineering Science》 2023年第1期89-106,共18页
The delay-causing text data contain valuable information such as the specific reasons for the delay,location and time of the disturbance,which can provide an efficient support for the prediction of train delays and im... The delay-causing text data contain valuable information such as the specific reasons for the delay,location and time of the disturbance,which can provide an efficient support for the prediction of train delays and improve the guidance of train control efficiency.Based on the train operation data and delay-causing data of the Wuhan-Guangzhou high-speed railway,the relevant algorithms in the natural language processing field are used to process the delay-causing text data.It also integrates the train operatingenvironment information and delay-causing text information so as to develop a cause-based train delay propagation prediction model.The Word2vec model is first used to vectorize the delay-causing text description after word segmentation.The mean model or the term frequency-inverse document frequency-weighted model is then used to generate the delay-causing sentence vector based on the original word vector.Afterward,the train operating-environment features and delay-causing sentence vector are input into the extreme gradient boosting(XGBoost)regression algorithm to develop a delay propagation prediction model.In this work,4 text feature processing methods and 8 regression algorithms are considered.The results demonstrate that the XGBoost regression algorithm has the highest prediction accuracy using the test features processed by the continuous bag of words and the mean models.Compared with the prediction model that only considers the train-operating-environment features,the results show that the prediction accuracy of the model is significantly improved with multi-ple regression algorithms after integrating the delay-causing feature. 展开更多
关键词 high-speed rail Delay propagation Cause of delay Word2vec Natural language processing
下载PDF
Network analysis and spatial agglomeration of China’s high-speed rail: A dual network approach 被引量:1
9
作者 王微 杜文博 +2 位作者 李威翰 佟路 王姣娥 《Chinese Physics B》 SCIE EI CAS CSCD 2021年第1期612-622,共11页
China has the largest high-speed railway(HSR) system in the world, and it has gradually reshaped the urban network.The HSR system can be represented as different types of networks in terms of the nodes and various rel... China has the largest high-speed railway(HSR) system in the world, and it has gradually reshaped the urban network.The HSR system can be represented as different types of networks in terms of the nodes and various relationships(i.e.,linkages) between them. In this paper, we first introduce a general dual network model, including a physical network(PN)and a logical network(LN) to provide a comparative analysis for China’s high-speed rail network via complex network theory. The PN represents a layout of stations and rail tracks, and forms the basis for operating all trains. The LN is a network composed of the origin and destination stations of each high-speed train and the train flows between them. China’s high-speed railway(CHSR) has different topological structures and link strengths for PN in comparison with the LN. In the study, the community detection is used to analyze China’s high-speed rail networks and several communities are found to be similar to the layout of planned urban agglomerations in China. Furthermore, the hierarchies of urban agglomerations are different from each other according to the strength of inter-regional interaction and intra-regional interaction, which are respectively related to location and spatial development strategies. Moreover, a case study of the Yangtze River Delta shows that the hub stations have different resource divisions and are major contributors to the gap between train departure and arrival flows. 展开更多
关键词 China’s high-speed rail dual network network analysis urban agglomeration
下载PDF
Electromagnetic Tomography System for Defect Detection of High-Speed Rail Wheel 被引量:1
10
作者 Yu Miao Xianglong Liu +4 位作者 Ze Liu Yuanli Yue Jianli Wu Jiwei Huo Yong Li 《Journal of Beijing Institute of Technology》 EI CAS 2020年第4期474-483,共10页
A novel electromagnetic tomography(EMT)system for defect detection of high-speed rail wheel is proposed,which differs from traditional electromagnetic tomography systems in its spatial arrangements of coils.A U-shaped... A novel electromagnetic tomography(EMT)system for defect detection of high-speed rail wheel is proposed,which differs from traditional electromagnetic tomography systems in its spatial arrangements of coils.A U-shaped sensor array was designed,and then a simulation model was built with the low frequency electromagnetic simulation software.Three different algorithms were applied to perform image reconstruction,therefore the defects can be detected from the reconstructed images.Based on the simulation results,an experimental system was built and image reconstruction were performed with the measured data.The reconstructed images obtained both from numerical simulation and experimental system indicated the locations of the defects of the wheel,which verified the feasibility of the EMT system and revealed its good application prospect in the future. 展开更多
关键词 electromagnetic tomography(EMT) high-speed rail wheel defect detection image reconstruction
下载PDF
Investigation into rail corrugation in high-speed railway tracks from the viewpoint of the frictional self-excited vibration of a wheel–rail system 被引量:1
11
作者 G.X.Chen X.L.Cui W.J.Qian 《Journal of Modern Transportation》 2016年第2期124-131,共8页
A finite element vibration model of a multiple wheel-rail system which consists of four wheels, one rail, and a series of sleepers is established to address the problem of rail corrugation in high-speed tracks. In the... A finite element vibration model of a multiple wheel-rail system which consists of four wheels, one rail, and a series of sleepers is established to address the problem of rail corrugation in high-speed tracks. In the model, the creep forces between the wheels and rail are considered to be saturated and equal to the normal contact forces times the friction coefficient. The oscillation of the rail is coupled with that of wheels in the action of the saturated creep forces. When the coupling is strong, self- excited oscillation of the wheel-rail system occurs. The self-excited vibration propensity of the model is analyzed using the complex eigenvalue method. Results show that there are strong propensities of unstable self-excited vibrations whose frequencies are less than 1,200 Hz under some conditions. Preventing wheels from slipping on rails is an effective method for suppressing rail corrugation in high-speed tracks. 展开更多
关键词 rail corrugation WEAR Friction-induced vibration Self-excited vibration - Elastic vibration mode Wheel-rail system high-speed railway
下载PDF
Some Critical Issues in the Development of Chinese High-Speed Rail: Challenges and Coping Strategies 被引量:1
12
作者 Min Chen Hailong Tang Kun Zhang 《Journal of Transportation Technologies》 2014年第2期164-174,共11页
In this paper, several critical issues related to Chinese high-speed rails (CHSR) are analyzed, investigated and discussed, including development background, reasons for high ticket fare, some typical factors that inf... In this paper, several critical issues related to Chinese high-speed rails (CHSR) are analyzed, investigated and discussed, including development background, reasons for high ticket fare, some typical factors that influence the environmental life-cycle assessment, time and cost comparison of typical door-to-door travel routes between different transport modes and complementary strategies among different transport modes. First, the results show that the expanding high-speed rail network increased the pressure on the country's roads in the 2010 spring festival rush period due to the high ticket fare of CHSR. Second, due to lower than expected ridership because of the high ticket price and limited demand in less developed areas, some Chinese CHSR projects have become economically unsustainable. Third, without sufficient ridership and service life, the utilization of HSR was unable to show any advantages in the environmental impact compared with the other transport modes. In addition, the impact of shock from CHSR on Chinese domestic civil airlines is evident when the travel distance is below 1050 km. The key objective of the investigation is to enhance our understanding of the development and operation of Chinese high-speed rail. One of the key contributions of the current paper is the presented suggestions for complementary strategies between different transport modes to make full use of Chinese transportation resources to promote low carbon economy. 展开更多
关键词 CHINESE high-speed railS Development COST Time Environmental LIFE-CYCLE Assessment Strategies
下载PDF
Evaluation and optimization analysis of high-speed rail network structure in Northeast China under the background of northeast revitalization 被引量:1
13
作者 XU Shaojie WANG Fuyuan WANG Kaiyong 《Regional Sustainability》 2021年第4期349-362,共14页
The construction of high-speed rail(HSR)network has promoted the social-economic ties of cities,accelerated the compression of time and space,and changed the pattern of regional development.In this paper,with the adop... The construction of high-speed rail(HSR)network has promoted the social-economic ties of cities,accelerated the compression of time and space,and changed the pattern of regional development.In this paper,with the adoption of the operation frequency data of HSR from 12306 website,and based on the HSR connection strength model and social network analysis model,as well as according to the HSR connection strength,HSR network density,centrality,agglomeration subgroup,and other indicators,we analyzed the characteristics of HSR network structure in Northeast China.Results show that the number of HSR cities in Northeast China is small,cities in HSR network generally exhibit weak connectivity,and the existence of HSR network marginalizes cities such as Ulanhot,Baicheng,and Songyuan,which significantly reduce the overall network connectivity of Northeast China.The overall centrality of HSR network in Northeast China is characterized by“one axis,four edges”;specifically,the one axis is located in Harbin-Dalian transportation line and the four edges are located on both sides of the main axis of Harbin-Dalian transportation line.Eight agglomeration subgroups(four double city subgroups and four multi city subgroups)have formed in Northeast China.The core status of Shenyang in HSR network is improved significantly,and“one axis and two wings”HSR network in Liaoning Province is improved significantly.With the gradual expansion of Chaoyang-Fuxin,Dandong-Benxi,and Jilin-Yanji branch networks,the“point axis”HSR network mode in Northeast China has gradually developed and matured.In the future,it is recommended to rely on eight agglomerating subgroups to encrypt HSR network structure,create secondary node central cities,and gradually build a new pattern of opening up in Northeast China. 展开更多
关键词 Social network analysis high-speed rail network structure Operation frequency Intercity connection intensity Network density analysis Northeast China
下载PDF
Analysis of high-speed rail and airline transport cooperation in presence of non-purchase option 被引量:1
14
作者 Kimitoshi Sato Yihsu Chen 《Journal of Modern Transportation》 2018年第4期231-254,共24页
We study cooperation between the airline and high-speed rail(HSR) sectors by formulating their joint profit as a maximization problem using a multinomial logit choice model in a three-node setting. We allow the nonpur... We study cooperation between the airline and high-speed rail(HSR) sectors by formulating their joint profit as a maximization problem using a multinomial logit choice model in a three-node setting. We allow the nonpurchase option as an outside option available to consumers. The demand for each choice is not only a function of the price but also the service quality, such as the total trip time, frequency of service, and ease of connecting from the hub to a nearby HSR station. As a result, the following findings are presented. First, regardless of the service quality of either sector and the non-purchase option,cooperation decreases the total volume of the domestic market of a country. Second, when the attractiveness of the outside option is high, the HSR and air sectors can prevent a large reduction in the total volume by cooperation in the connecting market. However, this is not the case in the domestic market. Third, if the non-purchase quality in the domestic market is high, then cooperation increases the social welfare of the whole market. If the non-purchase quality is low, then cooperation increases the welfare of the whole market only in cases where the number of potential customers in the connecting market is relatively large. We also show the effect of improving air–rail service quality on each market share and on the total profit. 展开更多
关键词 INTEGRATION COMPETITION AIRLINE high-speed rail Multinomial logit model
下载PDF
Simulation Analysis Module of High-speed Rail Bearings Based on Secondary Development in ADAMS 被引量:4
15
《Computer Aided Drafting,Design and Manufacturing》 2013年第3期46-50,共5页
This paper develops a strong secondary development based on ADAMS feature which creates high-speed rail bearings for simulation analysis module. This thesis is in the case of non-circular pattern instructions of how t... This paper develops a strong secondary development based on ADAMS feature which creates high-speed rail bearings for simulation analysis module. This thesis is in the case of non-circular pattern instructions of how to achieve rapid roller modeling, with analysis of functions and parameters required for the design of the simulation module of the high-speed rail bearing, as well as the design of dialog boxes, the environment and file structure. The specific modules is based on the secondary development language provided by ADAMS ! View. Through the menus, dialog boxes which input parameters, it can achieve high iron bearing automatic modeling, dynamic analysis and post-processing to simplify the analysis of high-speed rail bearing operations, as well as improving the high-speed rail bearing development efficiency. 展开更多
关键词 ADAMS secondary development high-speed rail bearing simulation analysis
下载PDF
Application of On-Line Rail Milling in Rail Maintenance of High-Speed Railways
16
作者 周宇 许玉德 +1 位作者 李海锋 曹亮 《Journal of Southwest Jiaotong University(English Edition)》 2010年第2期140-144,共5页
On-line rail milling technologies have been applied in rail maintenance, and are proving to be efficient and environmental friendly. Based on the field data of on-line rail milling, a program for comparing rail transv... On-line rail milling technologies have been applied in rail maintenance, and are proving to be efficient and environmental friendly. Based on the field data of on-line rail milling, a program for comparing rail transverse profiles before and after milling was designed and the root mean square (RMS) amplitude of longitudinal profile was calculated. The application of on-line rail milling technology in removing rail surface defects, re-profiling railhead transverse profiles, smoothing longitudinal profiles and improving welding joint irregularity were analyzed. The results showed that the on-line rail milling technology can remove the surface defects at the rail crown and gauge comer perfectly, re-profile railhead transverse profile with a tolerance of - 1. 0-0.2 ram, improve longitudinal irregularity of rail surface, with the RMS amplitude of irregularity reduced more than 50% and the number of out-of- limited amplitude reduced by 42% - 82% in all wavelength ranges. The improvement of welding joint irregularity depends on the amount of metal removal determined by the milling equipment and the primal amplitude. 展开更多
关键词 high-speed railway rail rail maintenance rail defects rail profile MILLING
下载PDF
A fault prediction method for catenary of high-speed rails based on meteorological conditions
17
作者 Sheng Lin Qinyang Yu +2 位作者 Zhen Wang Ding Feng Shibin Gao 《Journal of Modern Transportation》 2019年第3期211-221,共11页
Fault frequency of catenary is related to meteo-rological conditions. In this work, based on the historical data, catenary fault frequency and weather-related fault rate are introduced to analyse the correlation betwe... Fault frequency of catenary is related to meteo-rological conditions. In this work, based on the historical data, catenary fault frequency and weather-related fault rate are introduced to analyse the correlation between catenary faults and meteorological conditions, and further the effect of meteorological conditions on catenary oper-ation. Moreover, machine learning is used for catenary fault prediction. As with the single decision tree, only a small number of training samples can be classified cor-rectly by each weak classifier, the AdaBoost algorithm is adopted to adjust the weights of misclassified samples and weak classifiers, and train multiple weak classifiers. Finally, the weak classifiers are combined to construct a strong classifier, with which the final prediction result is obtained. In order to validate the prediction method, an example is provided based on the historical data from a railway bureau of China. The result shows that the mapping relation between meteorological conditions and catenary faults can be established accurately by AdaBoost algorithm. The AdaBoost algorithm can accurately predict a catenary fault if the meteorological conditions are provided. 展开更多
关键词 high-speed rail CATENARY TRIP FAULT prediction Data processing METEOROLOGICAL conditions
下载PDF
A combined method for high-speed rail seismic monitoring and early warning
18
作者 Zhigao Chen Jun Huang 《Geodesy and Geodynamics》 2017年第5期356-360,共5页
The ground motion characteristics include the strength, frequency spectrum and duration time. In China, the PGA (peak ground acceleration) is commonly used in determination of whether an earthquake warning is necess... The ground motion characteristics include the strength, frequency spectrum and duration time. In China, the PGA (peak ground acceleration) is commonly used in determination of whether an earthquake warning is necessary when the high-speed train is on the rail. This method has not given an earthquake early warning time, and it only considers the strength factor of an earthquake, so the system may release an alarm for the near and small earthquakes which are no destructive. The new alarm method reconciles the timeliness and stability. It issues a P wave warning when the system receives seismic wave first, which will make the train to decelerate. Then, the system will confirm whether the P wave alarm is correct using the joint alarm result of CAV (cumulative absolute velocity) and PGA, and then take measures according to the result. The new method eliminates the interference from the near and small earthquakes, as well as the large and far earthquakes, and ensures the safety of the train when it is subjected to earthquakes. In this paper, we use seismic data to simulate the combined alarm of CAV and PGA, and then obtain the cumulative time of CAV and the time interval between CAV and PGA. Finally, we compare the new method with the double-station, earthquake monitoring alarm method which is currently used on China's high-speed rail. and find the new alarm method is better in the aspect of alarm timeliness. 展开更多
关键词 high-speed rail earthquake monitoringEarly warningAlarm parameterCumulative timeAlarm timeliness
下载PDF
An empirical study on impact of high-speed rail on eco-relationship of regional tourist
19
作者 HU Bei-ming LI Ya-nan 《Ecological Economy》 2016年第3期215-226,共12页
Study on the eco-relationship of regional tourism is a evaluation about the present situation and potential of regional tourist resources. In order to breaking the situation of the lack of coordination on tourist dest... Study on the eco-relationship of regional tourism is a evaluation about the present situation and potential of regional tourist resources. In order to breaking the situation of the lack of coordination on tourist destination in Guizhou province, understanding it after the opening of the Gui-Guang high-speed rail is beneficial. This paper constructs an evaluation index system about the eco-relationship of the regional tourist from five parts- the resource value, the tourist market, the traffic location, the reception conditions and the resource types. To summarize the changes of the tourist eco-relationship of samples before and after the opening of the high-speed rail,it calculates the weight by the judgment matrix, and then uses the cluster analysis of SPSS and the basis for judging the eco-relationship of regional tourist. To choose the emphasis and to guide the direction on tourism industry in Guizhou Province in the future high-speed rail era, a case study of the regional tourist destination in Guizhou section of the Gui-Guang high-speed rail is carried out. 展开更多
关键词 eco-relationship regional tourist Gui-Guang high-speed rail evaluation index system cluster analysis
下载PDF
Analysis of Dual-Core Type City and Its Hinterland Contact Pattern under the Background of High-Speed Rail Networking—Urban Agglomeration in Zhejiang Province as an Example
20
作者 Xiaohong Ren 《Journal of Transportation Technologies》 2016年第4期207-217,共12页
Under the background of high-speed rail networking, this paper uses the passenger trains, the type and direction of the railway via Hang Yong and its extension road line, to construct adsorption and dependency index a... Under the background of high-speed rail networking, this paper uses the passenger trains, the type and direction of the railway via Hang Yong and its extension road line, to construct adsorption and dependency index among cities, depict the contact pattern between the Hang Yong dual-core and its hinterland, measure the “net effect” that two center cities (Hangzhou, Ningbo) have on their hinterland, and estimate population agglomeration potential and future possible population flows of Zhejiang Province and the main sample cities. The result shows that, compared with Ningbo, Hangzhou has stronger radiation force to the vast majority of sample cities, and the sample cities affected more by Ningbo mainly concentrates in Ningbo-Taizhou-Wenzhou along;in addition, the sample cities such as Hangzhou, Ningbo and so on show better population agglomeration, then the population “scramble” phenomenon between cities has begun to appear. 展开更多
关键词 high-speed rail Networking Contact Pattern Measurement
下载PDF
上一页 1 2 10 下一页 到第
使用帮助 返回顶部