High-speed trains linking Xihn, capital of Northwest Chinas Shaanxi Province, and southwestern metropolis Chengdu, capital of Sichuan Province, began operation on December 6, 2017.
East Japan Railway Company(JR East)is aiming to“realize driverless train operation”as one of the key measures to respond to rapid changes in the business environment.Currently,Automatic Train Operation(ATO)equipment...East Japan Railway Company(JR East)is aiming to“realize driverless train operation”as one of the key measures to respond to rapid changes in the business environment.Currently,Automatic Train Operation(ATO)equipment is not installed on the Shinkansen,but there are plans to introduce ATO or driverless operation in the near future.From 2018-2021,the Ministry of Land,Infrastructure,Transport and Tourism(MLIT)held the“ATO Technology Study Group for Railways”in which the concept of technical requirements necessary for driverless operation was discussed.In 2021,JR East conducted the GOA4 demonstration test on the Joetsu Shinkansen.In this test,we were able to confirm the basic functions of Shinkansen vehicles such as automatic departure control,speed control,fixed position stop control,and remote stop control using ATO.We aim to realize unattended operation(GOA4)for deadhead trains between Niigata Station and the Niigata Shinkansen Rolling Stock Center by the end of the 2020 s,and driverless operation(GOA3)for passenger trains of the Joetsu Shinkansen by the mid-2030s and continue to develop the necessary technologies and build systems.展开更多
Purpose–This paper aims to propose a train timetable rescheduling(TTR)approach from the perspective of multi-train tracking optimization based on the mutual spatiotemporal information in the high-speed railway signal...Purpose–This paper aims to propose a train timetable rescheduling(TTR)approach from the perspective of multi-train tracking optimization based on the mutual spatiotemporal information in the high-speed railway signaling system.Design/methodology/approach–Firstly,a single-train trajectory optimization(STTO)model is constructed based on train dynamics and operating conditions.The train kinematics parameters,including acceleration,speed and time at each position,are calculated to predict the arrival times in the train timetable.A STTO algorithm is developed to optimize a single-train time-efficient driving strategy.Then,a TTR approach based on multi-train tracking optimization(TTR-MTTO)is proposed with mutual information.The constraints of temporary speed restriction(TSR)and end of authority are decoupled to calculate the tracking trajectory of the backward tracking train.The multi-train trajectories at each position are optimized to generate a timeefficient train timetable.Findings–The numerical experiment is performed on the Beijing-Tianjin high-speed railway line and CR400AF.The STTO algorithm predicts the train’s planned arrival time to calculate the total train delay(TTD).As for the TSR scenario,the proposed TTR-MTTO can reduce TTD by 60.60%compared with the traditional TTR approach with dispatchers’experience.Moreover,TTR-MTTO can optimize a time-efficient train timetable to help dispatchers reschedule trains more reasonably.Originality/value–With the cooperative relationship and mutual information between train rescheduling and control,the proposed TTR-MTTO approach can automatically generate a time-efficient train timetable to reduce the total train delay and the work intensity of dispatchers.展开更多
A multi-objective optimization model considering both reliability and maintenance cost is proposed to solve the contradiction between reliability and maintenance cost in high-speed railway catenary system maintenance ...A multi-objective optimization model considering both reliability and maintenance cost is proposed to solve the contradiction between reliability and maintenance cost in high-speed railway catenary system maintenance activities.The non-dominated sorting genetic algorithm 2(NSGA2)is applied to multi-objective optimization,and the optimization result is a set of Pareto solutions.Firstly,multistate failure mode analysis is conducted for the main devices leading to the failure of catenary,and then the reliability and failure mode of the whole catenary system is analyzed.The mathematical relationship between system reliability and maintenance cost is derived considering the existing catenary preventive maintenance mode to improve the reliability of the system.Secondly,an improved NSGA2(INSGA2)is proposed,which strengths population diversity by improving selection operator,and introduces local search strategy to ensure that population distribution is more uniform.The comparison results of the two algorithms before and after improvement on the zero-ductility transition(ZDT)series functions show that the population diversity is better and the solution is more uniform using INSGA2.Finally,the INSGA2 is applied to multi-objective optimization of system reliability and maintenance cost in different maintenance periods.The decision-makers can choose the reasonable solutions as the maintenance plans in the optimization results by weighing the relationship between the system reliability and the maintenance cost.The selected maintenance plans can ensure the lowest maintenance cost while the system reliability is as high as possible.展开更多
The focus of this study is to explore the statis-tical distribution models of high-speed railway (HSR) train delays. Based on actual HSR operational data, the delay causes and their classification, delay frequency, nu...The focus of this study is to explore the statis-tical distribution models of high-speed railway (HSR) train delays. Based on actual HSR operational data, the delay causes and their classification, delay frequency, number of affected trains, and space–time delay distributions are discussed. Eleven types of delay events are classified, and a detailed analysis of delay distribution for each classifica-tion is presented. Models of delay probability delay prob-ability distribution for each cause are proposed. Different distribution functions, including the lognormal, exponen-tial, gamma, uniform, logistic, and normal distribution, were selected to estimate and model delay patterns. The most appropriate distribution, which can approximate the delay duration corresponding to each cause, is derived. Subsequently, the Kolmogorov–Smirnov (K–S) test was used to test the goodness of fit of different train delay distribution models and the associated parameter values. The test results show that the distribution of the test data is consistent with that of the selected models. The fitting distribution models show the execution effect of the timetable and help in finding out the potential conflicts in real-time train operations.展开更多
This is a review of high-speed train development in the sense of technology advances all over the world. Three generations of high-speed trains are classified according to their technical characteristics and maximum o...This is a review of high-speed train development in the sense of technology advances all over the world. Three generations of high-speed trains are classified according to their technical characteristics and maximum operating speed. Emphasis is given to the newly developed high-speed train in China, CRH380. The theoretical foundations and future development of CRH380 are briefly discussed.展开更多
In this paper,the least square support vector machine(LSSVM)is used to study the safety of a high-speed railway.According to the principle of LSSVM regression prediction,the parameters of the LSSVM are optimized to mo...In this paper,the least square support vector machine(LSSVM)is used to study the safety of a high-speed railway.According to the principle of LSSVM regression prediction,the parameters of the LSSVM are optimized to model the natural disaster early warning of safe operation of a high-speed railway,and the management measures and methods of high-speed railway safety operation under natural disasters are given.The relevant statistical data of China’s high-speed railway are used for training and verification.The experimental results show that the LSSVM can well reflect the nonlinear relationship between the accident rate and the influencing factors,with high simulation accuracy and strong generalization ability,and can effectively predict the natural disasters in the safe operation of a high-speed railway.Moreover,the early warning system can improve the ability of safety operation evaluation and early warning of high-speed railway under natural disasters,realize the development goals of high-speed railway(safety,speed,economic,low-carbon and environmental protection)and provide a theoretical basis and technical support for improving the safety of a high-speed railway.展开更多
In areas with large temperature differences,the uneven distribution of temperatures in the CRTS III ballastless track slab due to daytime sunlight can cause warpage deformation,leading to periodic rail irregularities ...In areas with large temperature differences,the uneven distribution of temperatures in the CRTS III ballastless track slab due to daytime sunlight can cause warpage deformation,leading to periodic rail irregularities that increase the wheel-rail impact of high-speed vehicles and accelerate track structure damage.Therefore,it is necessary to study the dynamic contact relationship between the composite slab and the base plate during vehicle running.The results of the study show that:1)Under the influence of temperature gradients,the composite slab tends to deform elliptically.With a positive temperature gradient,the middle part of the track slab bulges upward,causing the slab to be supported by its four corners.Conversely,with a negative temperature gradient,the four corners of the track slab bulge upward,resulting in the slab being supported by its center.2)Temperature gradients can lead to separation between the composite slab and the base plate,reducing the contact area between layers.During vehicle running,the contact area between layers gradually increases,but the separation cannot be completely closed.3)The temperature gradient significantly affects the vertical displacement of the track.The vertical displacement in the middle of the slab increases with a positive temperature gradient.In contrast,the vertical displacement at the ends of the slab increases with a negative temperature gradient.4)The stress of self-compacting concrete at the side position significantly increases under a positive temperature gradient,with the vertical stress increasing by 2.7 times when the temperature gradient increases from 0 to 90℃·m^(-1).展开更多
文摘High-speed trains linking Xihn, capital of Northwest Chinas Shaanxi Province, and southwestern metropolis Chengdu, capital of Sichuan Province, began operation on December 6, 2017.
文摘East Japan Railway Company(JR East)is aiming to“realize driverless train operation”as one of the key measures to respond to rapid changes in the business environment.Currently,Automatic Train Operation(ATO)equipment is not installed on the Shinkansen,but there are plans to introduce ATO or driverless operation in the near future.From 2018-2021,the Ministry of Land,Infrastructure,Transport and Tourism(MLIT)held the“ATO Technology Study Group for Railways”in which the concept of technical requirements necessary for driverless operation was discussed.In 2021,JR East conducted the GOA4 demonstration test on the Joetsu Shinkansen.In this test,we were able to confirm the basic functions of Shinkansen vehicles such as automatic departure control,speed control,fixed position stop control,and remote stop control using ATO.We aim to realize unattended operation(GOA4)for deadhead trains between Niigata Station and the Niigata Shinkansen Rolling Stock Center by the end of the 2020 s,and driverless operation(GOA3)for passenger trains of the Joetsu Shinkansen by the mid-2030s and continue to develop the necessary technologies and build systems.
基金This research was jointly supported by the National Natural Science Foundation of China[Grant 62203468]the Young Elite Scientist Sponsorship Program by China Association for Science and Technology(CAST)[Grant 2022QNRC001]+1 种基金the Technological Research and Development Program of China Railway Corporation Limited[Grant K2021X001]by the Foundation of China Academy of Railway Sciences Corporation Limited[Grant 2021YJ043].On behalf all authors,the corresponding author states that there is no conflict of interest.
文摘Purpose–This paper aims to propose a train timetable rescheduling(TTR)approach from the perspective of multi-train tracking optimization based on the mutual spatiotemporal information in the high-speed railway signaling system.Design/methodology/approach–Firstly,a single-train trajectory optimization(STTO)model is constructed based on train dynamics and operating conditions.The train kinematics parameters,including acceleration,speed and time at each position,are calculated to predict the arrival times in the train timetable.A STTO algorithm is developed to optimize a single-train time-efficient driving strategy.Then,a TTR approach based on multi-train tracking optimization(TTR-MTTO)is proposed with mutual information.The constraints of temporary speed restriction(TSR)and end of authority are decoupled to calculate the tracking trajectory of the backward tracking train.The multi-train trajectories at each position are optimized to generate a timeefficient train timetable.Findings–The numerical experiment is performed on the Beijing-Tianjin high-speed railway line and CR400AF.The STTO algorithm predicts the train’s planned arrival time to calculate the total train delay(TTD).As for the TSR scenario,the proposed TTR-MTTO can reduce TTD by 60.60%compared with the traditional TTR approach with dispatchers’experience.Moreover,TTR-MTTO can optimize a time-efficient train timetable to help dispatchers reschedule trains more reasonably.Originality/value–With the cooperative relationship and mutual information between train rescheduling and control,the proposed TTR-MTTO approach can automatically generate a time-efficient train timetable to reduce the total train delay and the work intensity of dispatchers.
文摘A multi-objective optimization model considering both reliability and maintenance cost is proposed to solve the contradiction between reliability and maintenance cost in high-speed railway catenary system maintenance activities.The non-dominated sorting genetic algorithm 2(NSGA2)is applied to multi-objective optimization,and the optimization result is a set of Pareto solutions.Firstly,multistate failure mode analysis is conducted for the main devices leading to the failure of catenary,and then the reliability and failure mode of the whole catenary system is analyzed.The mathematical relationship between system reliability and maintenance cost is derived considering the existing catenary preventive maintenance mode to improve the reliability of the system.Secondly,an improved NSGA2(INSGA2)is proposed,which strengths population diversity by improving selection operator,and introduces local search strategy to ensure that population distribution is more uniform.The comparison results of the two algorithms before and after improvement on the zero-ductility transition(ZDT)series functions show that the population diversity is better and the solution is more uniform using INSGA2.Finally,the INSGA2 is applied to multi-objective optimization of system reliability and maintenance cost in different maintenance periods.The decision-makers can choose the reasonable solutions as the maintenance plans in the optimization results by weighing the relationship between the system reliability and the maintenance cost.The selected maintenance plans can ensure the lowest maintenance cost while the system reliability is as high as possible.
基金supported by the National Key R&D Plan (No.2017YFB1200701)National Nature Science Foundation of China (No.U1834209 and 71871188)the support of the Railways Technology Development Plan of China Railway Corporation (No.2016X008-J)supported by State Key Lab of Railway Control and Safety Open Topics Fund (No.RCS2019K007)
文摘The focus of this study is to explore the statis-tical distribution models of high-speed railway (HSR) train delays. Based on actual HSR operational data, the delay causes and their classification, delay frequency, number of affected trains, and space–time delay distributions are discussed. Eleven types of delay events are classified, and a detailed analysis of delay distribution for each classifica-tion is presented. Models of delay probability delay prob-ability distribution for each cause are proposed. Different distribution functions, including the lognormal, exponen-tial, gamma, uniform, logistic, and normal distribution, were selected to estimate and model delay patterns. The most appropriate distribution, which can approximate the delay duration corresponding to each cause, is derived. Subsequently, the Kolmogorov–Smirnov (K–S) test was used to test the goodness of fit of different train delay distribution models and the associated parameter values. The test results show that the distribution of the test data is consistent with that of the selected models. The fitting distribution models show the execution effect of the timetable and help in finding out the potential conflicts in real-time train operations.
文摘This is a review of high-speed train development in the sense of technology advances all over the world. Three generations of high-speed trains are classified according to their technical characteristics and maximum operating speed. Emphasis is given to the newly developed high-speed train in China, CRH380. The theoretical foundations and future development of CRH380 are briefly discussed.
基金supported by grants from the National Natural Science Foundation of China 51178157High-level Project of the Top Six Talents in Jiangsu Province JXQC-021+1 种基金the Key Science and Technology Program in Henan Province 182102310004the Postgraduate Research and Prac-tice Innovation Program of Jiangsu Province KYCX20-0290.
文摘In this paper,the least square support vector machine(LSSVM)is used to study the safety of a high-speed railway.According to the principle of LSSVM regression prediction,the parameters of the LSSVM are optimized to model the natural disaster early warning of safe operation of a high-speed railway,and the management measures and methods of high-speed railway safety operation under natural disasters are given.The relevant statistical data of China’s high-speed railway are used for training and verification.The experimental results show that the LSSVM can well reflect the nonlinear relationship between the accident rate and the influencing factors,with high simulation accuracy and strong generalization ability,and can effectively predict the natural disasters in the safe operation of a high-speed railway.Moreover,the early warning system can improve the ability of safety operation evaluation and early warning of high-speed railway under natural disasters,realize the development goals of high-speed railway(safety,speed,economic,low-carbon and environmental protection)and provide a theoretical basis and technical support for improving the safety of a high-speed railway.
基金supported by the National Natural Science Foundation of China(Grant No.52278466)the Project of China Academy of Railway Sciences Co.,Ltd(Grant No.2023YJ194).The useful contribution and discussions from project partners are also acknowledged.
文摘In areas with large temperature differences,the uneven distribution of temperatures in the CRTS III ballastless track slab due to daytime sunlight can cause warpage deformation,leading to periodic rail irregularities that increase the wheel-rail impact of high-speed vehicles and accelerate track structure damage.Therefore,it is necessary to study the dynamic contact relationship between the composite slab and the base plate during vehicle running.The results of the study show that:1)Under the influence of temperature gradients,the composite slab tends to deform elliptically.With a positive temperature gradient,the middle part of the track slab bulges upward,causing the slab to be supported by its four corners.Conversely,with a negative temperature gradient,the four corners of the track slab bulge upward,resulting in the slab being supported by its center.2)Temperature gradients can lead to separation between the composite slab and the base plate,reducing the contact area between layers.During vehicle running,the contact area between layers gradually increases,but the separation cannot be completely closed.3)The temperature gradient significantly affects the vertical displacement of the track.The vertical displacement in the middle of the slab increases with a positive temperature gradient.In contrast,the vertical displacement at the ends of the slab increases with a negative temperature gradient.4)The stress of self-compacting concrete at the side position significantly increases under a positive temperature gradient,with the vertical stress increasing by 2.7 times when the temperature gradient increases from 0 to 90℃·m^(-1).