期刊文献+
共找到204篇文章
< 1 2 11 >
每页显示 20 50 100
A review of artificial intelligence applications in high-speed railway systems 被引量:2
1
作者 Xuehan Li Minghao Zhu +3 位作者 Boyang Zhang Xiaoxuan Wang Zha Liu Liang Han 《High-Speed Railway》 2024年第1期11-16,共6页
In recent years,the global surge of High-speed Railway(HSR)revolutionized ground transportation,providing secure,comfortable,and punctual services.The next-gen HSR,fueled by emerging services like video surveillance,e... In recent years,the global surge of High-speed Railway(HSR)revolutionized ground transportation,providing secure,comfortable,and punctual services.The next-gen HSR,fueled by emerging services like video surveillance,emergency communication,and real-time scheduling,demands advanced capabilities in real-time perception,automated driving,and digitized services,which accelerate the integration and application of Artificial Intelligence(AI)in the HSR system.This paper first provides a brief overview of AI,covering its origin,evolution,and breakthrough applications.A comprehensive review is then given regarding the most advanced AI technologies and applications in three macro application domains of the HSR system:mechanical manufacturing and electrical control,communication and signal control,and transportation management.The literature is categorized and compared across nine application directions labeled as intelligent manufacturing of trains and key components,forecast of railroad maintenance,optimization of energy consumption in railroads and trains,communication security,communication dependability,channel modeling and estimation,passenger scheduling,traffic flow forecasting,high-speed railway smart platform.Finally,challenges associated with the application of AI are discussed,offering insights for future research directions. 展开更多
关键词 high-speed railway Artificial intelligence Intelligent distribution Intelligent control Intelligent scheduling
下载PDF
A discussion about the limitations of the Eurocode’s high-speed load model for railway bridges
2
作者 Gonçalo Ferreira Pedro Montenegro +2 位作者 JoséRui Pinto António Abel Henriques Rui Calçada 《Railway Engineering Science》 EI 2024年第2期211-228,共18页
High-speed railway bridges are subjected to normative limitations concerning maximum permissible deck accelerations.For the design of these structures,the European norm EN 1991-2 introduces the high-speed load model(H... High-speed railway bridges are subjected to normative limitations concerning maximum permissible deck accelerations.For the design of these structures,the European norm EN 1991-2 introduces the high-speed load model(HSLM)—a set of point loads intended to include the effects of existing high-speed trains.Yet,the evolution of current trains and the recent development of new load models motivate a discussion regarding the limits of validity of the HSLM.For this study,a large number of randomly generated load models of articulated,conventional,and regular trains are tested and compared with the envelope of HSLM effects.For each type of train,two sets of 100,000 load models are considered:one abiding by the limits of the EN 1991-2 and another considering wider limits.This comparison is achieved using both a bridge-independent metric(train signatures)and dynamic analyses on a case study bridge(the Canelas bridge of the Portuguese Railway Network).For the latter,a methodology to decrease the computational cost of moving loads analysis is introduced.Results show that some theoretical load models constructed within the stipulated limits of the norm can lead to effects not covered by the HSLM.This is especially noted in conventional trains,where there is a relation with larger distances between centres of adjacent vehicle bogies. 展开更多
关键词 high-speed load model Dynamic analysis high-speed railways Train signature railway bridges Deck acceleration
下载PDF
Influence of pier height on the safety of trains running on high-speed railway bridges during earthquakes
3
作者 NIE Yu-tao GUO Wei +8 位作者 JIANG Li-zhong YU Zhi-wu ZENG Chen WANG Yang HE Xu-en REN Shao-xun HUANG Ren-qiang LIANG Guang-yue LI Chang-qing 《Journal of Central South University》 SCIE EI CAS CSCD 2024年第6期2102-2115,共14页
Sudden earthquakes pose a threat to the running safety of trains on high-speed railway bridges,and the stiffness of piers is one of the factors affecting the dynamic response of train-track-bridge system.In this paper... Sudden earthquakes pose a threat to the running safety of trains on high-speed railway bridges,and the stiffness of piers is one of the factors affecting the dynamic response of train-track-bridge system.In this paper,a experiment of a train running on a high-speed railway bridge is performed based on a dynamic experiment system,and the corresponding numerical model is established.The reliability of the numerical model is verified by experiments.Then,the experiment and numerical data are analyzed to reveal the pier height effects on the running safety of trains on bridges.The results show that when the pier height changes,the frequency of the bridge below the 30 m pier height changes greater;the increase of pier height causes the transverse fundamental frequency of the bridge close to that of the train,and the shaking angle and lateral displacement of the train are the largest for bridge with 50 m pier,which increases the risk of derailment;with the pier height increases from 8 m to 50 m,the derailment coefficient obtained by numerical simulations increases by 75% on average,and the spectral intensity obtained by experiments increases by 120% on average,two indicators exhibit logarithmic variation. 展开更多
关键词 pier height high-speed railway bridge running safety numerical model
下载PDF
Field survey and analysis on near-fault severely damaged high-speed railway bridge in 2022 M6.9 Menyuan earthquake
4
作者 Lin Xuchuan Liu Fuxiang Shan Wenchen 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2024年第4期1043-1055,共13页
The 2022 M6.9 Menyuan earthquake caused severe damage to a high-speed railway bridge,which was designed for high-speed trains running at speeds of above 250 km/h and is located right next to the fault.Bridges of this ... The 2022 M6.9 Menyuan earthquake caused severe damage to a high-speed railway bridge,which was designed for high-speed trains running at speeds of above 250 km/h and is located right next to the fault.Bridges of this type have been widely used for rapidly constructing the high-speed railway network,but few bridges have been tested by near-fault devastating earthquakes.The potential severe impact of the earthquake on the high-speed railway is not only the safety of the infrastructure,trains and passengers,but also economic loss due to interrupted railway use.Therefore,a field survey was carried out immediately after the earthquake to collect time-sensitive data.The damage to the bridge was carefully investigated,and quantitative analyses were conducted to better understand the mechanism of the bridge failure.It was found that seismic action perpendicular to the bridge’s longitudinal direction caused severe damage to the girders and rails,while none of the piers showed obvious deformation or cracking.The maximum values of transverse displacement,out-of-plane rotation and twisting angle of girders reached 212.6 cm,3.1 degrees and 19.9 degrees,respectively,causing severe damage to the bearing supports and anti-seismic retaining blocks.These observations provide a basis for improving the seismic design of high-speed railway bridges located in near-fault areas. 展开更多
关键词 Menyuan earthquake field survey high-speed railway bridge near fault seismic damage
下载PDF
Noise reduction mechanism of high-speed railway box-girder bridges installed with MTMDs on top plate
5
作者 Xiaoan Zhang Xiaoyun Zhang +2 位作者 Jianjin Yang Li Yang Guangtian Shi 《Railway Engineering Science》 EI 2024年第4期518-532,共15页
The issue of low-frequency structural noise radiated from high-speed railway(HSR) box-girder bridges(BGBs) is a significant challenge worldwide. Although it is known that vibrations in BGBs caused by moving trains can... The issue of low-frequency structural noise radiated from high-speed railway(HSR) box-girder bridges(BGBs) is a significant challenge worldwide. Although it is known that vibrations in BGBs caused by moving trains can be reduced by installing multiple tuned mass dampers(MTMDs) on the top plate, there is limited research on the noise reduction achieved by this method. This study aims to investigate the noise reduction mechanism of BGBs installed with MTMDs on the top plate. A sound radiation prediction model for the BGB installed with MTMDs is developed, based on the vehicle–track–bridge coupled dynamics and acoustics boundary element method. After being verified by field tested results, the prediction model is employed to study the reduction of vibration and noise of BGBs caused by the MTMDs. It is found that installing MTMDs on top plate can significantly affect the vibration distribution and sound radiation law of BGBs. However, its impact on the sound radiation caused by vibrations dominated by the global modes of BGBs is minimal. The noise reduction achieved by MTMDs is mainly through changing the acoustic radiation contributions of each plate of the bridge. In the lower frequency range, the noise reduction of BGB caused by MTMDs can be more effective if the installation of MTMDs can modify the vibration frequency and distribution of the BGB to avoid the influence of small vibrations and disperse the sound radiation from each plate. 展开更多
关键词 high-speed railway Box-girder bridge MTMDs Noise control design Noise reduction mechanism
下载PDF
Reflection on methodology of the correlation between electromagnetic interference and safety in high-speed railway
6
作者 Chang Liu Shiwu Yang +2 位作者 Yixuan Yang Hefei Cao Shanghe Liu 《Railway Sciences》 2024年第1期84-96,共13页
Purpose – In the continuous development of high-speed railways, ensuring the safety of the operation controlsystem is crucial. Electromagnetic interference (EMI) faults in signaling equipment may cause transportation... Purpose – In the continuous development of high-speed railways, ensuring the safety of the operation controlsystem is crucial. Electromagnetic interference (EMI) faults in signaling equipment may cause transportationinterruptions, delays and even threaten the safety of train operations. Exploring the impact of disturbances onsignaling equipment and establishing evaluation methods for the correlation between EMI and safety isurgently needed.Design/methodology/approach – This paper elaborates on the necessity and significance of studying theimpact of EMI as an unavoidable and widespread risk factor in the external environment of high-speed railwayoperations and continuous development. The current status of research methods and achievements from theperspectives of standard systems, reliability analysis and safety assessment are examined layer by layer.Additionally, it provides prospects for innovative ideas for exploring the quantitative correlation between EMIand signaling safety.Findings – Despite certain innovative achievements in both domestic and international standard systems andrelated research for ensuring and evaluating railway signaling safety, there’s a lack of quantitative and strategic research on the degradation of safety performance in signaling equipment due to EMI. A quantitativecorrelation between EMI and safety has yet to be established. On this basis, this paper proposes considerationsfor research methods pertaining to the correlation between EMI and safety.Originality/value – This paper overviews a series of methods and outcomes derived from domestic andinternational studies regarding railway signaling safety, encompassing standard systems, reliability analysisand safety assessment. Recognizing the necessity for quantitatively describing and predicting the impact ofEMI on high-speed railway signaling safety, an innovative approach using risk assessment techniques as abridge to establish the correlation between EMI and signaling safety is proposed. 展开更多
关键词 Electromagnetic interference Reliability SAFETY Risk assessment Signaling system high-speed railway
下载PDF
Influence of span-to-depth ratio on dynamic response of vehicle-turnoutbridge system in high-speed railway
7
作者 Chuanqing Dai Tao Xin +3 位作者 Shenlu Qiao Yanan Zhang Pengsong Wang Mahantesh M.Nadakatti 《High-Speed Railway》 2024年第1期30-41,共12页
For high-speed railways,the smoothness of the railway line significantly affects the operational speed of trains.When the train passes through the turnout on a long-span bridge,the wheel-rail impacts caused by the tur... For high-speed railways,the smoothness of the railway line significantly affects the operational speed of trains.When the train passes through the turnout on a long-span bridge,the wheel-rail impacts caused by the turnout structure irregularities,and the instability arising from the bridge's flexural deformation lead to a strong coupling effect in the vehicle-turnout-bridge system.This significantly affects both ride comfort and operational safety.For addressing this issue,the present study considered a long-span continuous rigid-frame bridge as an example and established a train-turnout-bridge coupled dynamic model of high-speed railway.Utilizing a selfdeveloped dynamic simulation program,the study analysed the dynamic response characteristics when the train passes through the turnouts on the bridge.It also investigated the influence of different span-to-depth ratios of the bridge on the vehicle dynamic response when the train passes through the main line and branch line of turnouts and then proposed a span-to-depth ratio limit value for a long-span continuous rigid-frame bridge.The research findings suggest that the changes in the span-to-depth ratio have a relatively minor impact on the train’s operational performance but significantly affect the dynamic characteristics of the bridge structure.Based on the findings and a comprehensive assessment of safety indicators,it is advisable to establish a span-to-depth ratio limit of 1/4500 for a long-span continuous rigid-frame bridge. 展开更多
关键词 Turnout on bridge Span-to-depth ratio Dynamic response Vehicle-turnout-bridge system high-speed railway
下载PDF
Risk assessment of high-speed railway CTC system based on improved game theory and cloud model
8
作者 Yanhao Sun Tao Zhang +2 位作者 Shuxin Ding Zhiming Yuan Shengliang Yang 《Railway Sciences》 2024年第3期388-410,共23页
Purpose-In order to solve the problem of inaccurate calculation of index weights,subjectivity and uncertainty of index assessment in the risk assessment process,this study aims to propose a scientific and reasonable c... Purpose-In order to solve the problem of inaccurate calculation of index weights,subjectivity and uncertainty of index assessment in the risk assessment process,this study aims to propose a scientific and reasonable centralized traffic control(CTC)system risk assessment method.Design/methodologylapproach-First,system-theoretic process analysis(STPA)is used to conduct risk analysis on the CTC system and constructs risk assessment indexes based on this analysis.Then,to enhance the accuracy of weight calculation,the fuzzy analytical hierarchy process(FAHP),fuzzy decision-making trial and evaluation laboratory(FDEMATEL)and entropy weight method are employed to calculate the subjective weight,relative weight and objective weight of each index.These three types of weights are combined using game theory to obtain the combined weight for each index.To reduce subjectivity and uncertainty in the assessment process,the backward cloud generator method is utilized to obtain the numerical character(NC)of the cloud model for each index.The NCs of the indexes are then weighted to derive the comprehensive cloud for risk assessment of the CTC system.This cloud model is used to obtain the CTC system's comprehensive risk assessment.The model's similarity measurement method gauges the likeness between the comprehensive risk assessment cloud and the risk standard cloud.Finally,this process yields the risk assessment results for the CTC system.Findings-The cloud model can handle the subjectivity and fuzziness in the risk assessment process well.The cloud model-based risk assessment method was applied to the CTC system risk assessment of a railway group and achieved good results.Originality/value-This study provides a cloud model-based method for risk assessment of CTC systems,which accurately calculates the weight of risk indexes and uses cloud models to reduce uncertainty and subjectivity in the assessment,achieving effective risk assessment of CTC systems.It can provide a reference and theoretical basis for risk management of the CTC system. 展开更多
关键词 high-speed railway Centralized traffic control Risk assessment Game theory Cloud model Paper type Research paper
下载PDF
High-speed railway track components inspection framework based on YOLOv8 with high-performance model deployment
9
作者 Youzhi Tang Yu Qian 《High-Speed Railway》 2024年第1期42-50,共9页
Railway inspection poses significant challenges due to the extensive use of various components in vast railway networks,especially in the case of high-speed railways.These networks demand high maintenance but offer on... Railway inspection poses significant challenges due to the extensive use of various components in vast railway networks,especially in the case of high-speed railways.These networks demand high maintenance but offer only limited inspection windows.In response,this study focuses on developing a high-performance rail inspection system tailored for high-speed railways and railroads with constrained inspection timeframes.This system leverages the latest artificial intelligence advancements,incorporating YOLOv8 for detection.Our research introduces an efficient model inference pipeline based on a producer-consumer model,effectively utilizing parallel processing and concurrent computing to enhance performance.The deployment of this pipeline,implemented using C++,TensorRT,float16 quantization,and oneTBB,represents a significant departure from traditional sequential processing methods.The results are remarkable,showcasing a substantial increase in processing speed:from 38.93 Frames Per Second(FPS)to 281.06 FPS on a desktop system equipped with an Nvidia RTX A6000 GPU and from 19.50 FPS to 200.26 FPS on the Nvidia Jetson AGX Orin edge computing platform.This proposed framework has the potential to meet the real-time inspection requirements of high-speed railways. 展开更多
关键词 high-speed railway Track inspection Computer vision Deep learning Edge computing Real-time decision making
下载PDF
Study on the Influence of Lanzhou-Urumqi High-Speed Railway on Regional Accessibility and Economic Development
10
作者 Lili Ma Xiaolong Han Miao Gong 《Proceedings of Business and Economic Studies》 2024年第2期22-31,共10页
The Lanzhou-Urumqi high-speed railway is an important part of the railway network connecting Gansu,Qinghai,and Xinjiang,and it is of far-reaching significance in facilitating China’s western development.An accessibil... The Lanzhou-Urumqi high-speed railway is an important part of the railway network connecting Gansu,Qinghai,and Xinjiang,and it is of far-reaching significance in facilitating China’s western development.An accessibility model and a double difference model were built to analyze the impact of the Lanzhou-Urumqi high-speed railway on regional accessibility and economic development of the areas along the line before(2012-2014)and after(2017-2019)its opening.The results show that the regional accessibility remains unchanged before and after the operation of this railway line.However,there is a spatial difference in improvement,that of central cities being better.The opening of the high-speed railway is conducive to driving the overall economic development of the region and promoting the comprehensive and coordinated development of regional economies. 展开更多
关键词 Lanzhou-Urumqi high-speed railway Regional economy Double difference model Accessibility model Empirical analysis
下载PDF
Pantograph-catenary electrical contact system of high-speed railways:recent progress,challenges,and outlooks 被引量:8
11
作者 Guangning Wu Keliang Dong +10 位作者 Zhilei Xu Song Xiao Wenfu Wei Huan Chen Jie Li Zhanglin Huang Jingwei Li Guoqiang Gao Guozheng Kang Chuanjun Tu Xingyi Huang 《Railway Engineering Science》 2022年第4期437-467,共31页
As the unique power entrance,the pantograph-catenary electrical contact system maintains the efficiency and reliability of power transmission for the high-speed train.Along with the fast development of high-speed rail... As the unique power entrance,the pantograph-catenary electrical contact system maintains the efficiency and reliability of power transmission for the high-speed train.Along with the fast development of high-speed railways all over the world,some commercialized lines are built for covering the remote places under harsh environment,especially in China;these environmental elements including wind,sand,rain,thunder,ice and snow need to be considered during the design of the pantograph-catenary system.The pantograph-catenary system includes the pantograph,the contact wire and the interface—pantograph slide.As the key component,this pantograph slide plays a critical role in reliable power transmission under dynamic condition.The fundamental material characteristics of the pantograph slide and contact wire such as electrical conductivity,impact resistance,wear resistance,etc.,directly determine the sliding electrical contact performance of the pantograph-catenary system;meanwhile,different detection methods of the pantograph-catenary system are crucial for the reliability of service and maintenance.In addition,the challenges brought from extreme operational conditions are discussed,taking the Sichuan-Tibet Railway currently under construction as a special example with the high-altitude climate.The outlook for developing the ultra-high-speed train equipped with the novel pantograph-catenary system which can address the harsher operational environment is also involved.This paper has provided a comprehensive review of the high-speed railway pantograph-catenary systems,including its progress,challenges,outlooks in the history and future. 展开更多
关键词 high-speed railway Pantograph-catenary system Contact wire Pantograph slide Status detection
下载PDF
Model tests on XCC-piled embankment under dynamic train load of high-speed railways 被引量:7
12
作者 Niu Tingting Liu Hanlong +1 位作者 Ding Xuanming Zheng Changjie 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2018年第3期581-594,共14页
Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under... Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under the dynamic train load of a high-speed railway is not yet understood.In light of this,a heavily instrumented piled embankment model was set up,and a model test was carried out,in which a servo-hydraulic actuator outputting M-shaped waves was adopted to simulate the process of a running train.Earth pressure,settlement,strain in the geogrid and pile and excess pore water pressure were measured.The results show that the soil arching height under the dynamic train load of a high-speed railway is shorter than under static loading.The growth trend for accumulated settlement slowed down after long-term vibration although there was still a tendency for it to increase.Accumulated geogrid strain has an increasing tendency after long-term vibration.The closer the embankment edge,the greater the geogrid strain over the subsoil.Strains in the pile were smaller under dynamic train loads,and their distribution was different from that under static loading.At the same elevation,excess pore water pressure under the track slab was greater than that under the embankment shoulder. 展开更多
关键词 piled embankment model test dynamic train load of high-speed railways XCC-pile M-shaped wave
下载PDF
Full-scale multi-functional test platform for investigating mechanical performance of track–subgrade systems of high-speed railways 被引量:4
13
作者 Wanming Zhai Kaiyun Wang +3 位作者 Zhaowei Chen Shengyang Zhu Chengbiao Cai Gang Liu 《Railway Engineering Science》 2020年第3期213-231,共19页
Motivated by the huge practical engineering demand for the fundamental understanding of mechanical characteristics of high-speed railway infrastructure,a fullscale multi-functional test platform for high-speed railway... Motivated by the huge practical engineering demand for the fundamental understanding of mechanical characteristics of high-speed railway infrastructure,a fullscale multi-functional test platform for high-speed railway track–subgrade system is developed in this paper,and its main functions for investigating the mechanical performance of track–subgrade systems are elaborated with three typical experimental examples.Comprising the full-scale subgrade structure and all the five types of track structures adopted in Chinese high-speed railways,namely the CRTS I,the CRTS II and the CRTS III ballastless tracks,the double-block ballastless track and the ballasted track,the test platform is established strictly according to the construction standard of Chinese high-speed railways.Three kinds of effective loading methods are employed,including the real bogie loading,multi-point loading and the impact loading.Various types of sensors are adopted in different components of the five types of track–subgrade systems to measure the displacement,acceleration,pressure,structural strain and deformation,etc.Utilizing this test platform,both dynamic characteristics and long-term performance evolution of high-speed railway track–subgrade systems can be investigated,being able to satisfy the actual demand for large-scale operation of Chinese high-speed railways.As examples,three typical experimental studies are presented to elucidate the comprehensive functionalities of the full-scale multi-functional test platform for exploring the dynamic performance and its long-term evolution of ballastless track systems and for studying the long-term accumulative settlement of the ballasted track–subgrade system in high-speed railways.Some interesting phenomena and meaningful results are captured by the developed test platform,which provide a useful guidance for the scientific operation and maintenance of high-speed railway infrastructure. 展开更多
关键词 Full-scale test high-speed railway Track–subgrade system Ballastless track Ballasted track Mechanical performance Long-term performance evolution Damage and degradation
下载PDF
Characteristics of wheel-rail vibration of the vertical section in high-speed railways 被引量:2
14
作者 Jiuchuan YANG Kaiyun WANG Hongyu CHEN 《Journal of Modern Transportation》 2012年第1期10-15,共6页
In order to analyze the characteristics of wheel-rail vibration of the vertical section in a high-speed railway, a vehicle-line dynamics model is established using the dynamics software SIMPACK. Through this model, th... In order to analyze the characteristics of wheel-rail vibration of the vertical section in a high-speed railway, a vehicle-line dynamics model is established using the dynamics software SIMPACK. Through this model, the paper analyzes the influence of vertical section parameters, including vertical section slope and vertical curve radius, on wheel-rail dynamics interaction and the acting region of wheel-rail vibration. In addition, the characteristics of wheel- rail vibration of the vertical section under different velocities are investigated. The results show that the variation of wheel load is not sensitive to the vertical section slope but is greatly affected by the vertical curve radius. It was also observed that the smaller the vertical curve radius is, the more severe the interaction between the wheel and rail be- comes. Furthermore, the acting region of wheel-rail vibration expands with the vertical curve radius increasing. On another note, it is necessary to match the slope and vertical curve radius reasonably, on account of the influence of operation speed on the characteristics of wheel-rail vibration. This is especially important at the design stage of vertical sec- tions for lines of different grades. 展开更多
关键词 high-speed railway vertical section wheel-rail vibration SLOPE vertical curve radius
下载PDF
Application of On-Line Rail Milling in Rail Maintenance of High-Speed Railways
15
作者 周宇 许玉德 +1 位作者 李海锋 曹亮 《Journal of Southwest Jiaotong University(English Edition)》 2010年第2期140-144,共5页
On-line rail milling technologies have been applied in rail maintenance, and are proving to be efficient and environmental friendly. Based on the field data of on-line rail milling, a program for comparing rail transv... On-line rail milling technologies have been applied in rail maintenance, and are proving to be efficient and environmental friendly. Based on the field data of on-line rail milling, a program for comparing rail transverse profiles before and after milling was designed and the root mean square (RMS) amplitude of longitudinal profile was calculated. The application of on-line rail milling technology in removing rail surface defects, re-profiling railhead transverse profiles, smoothing longitudinal profiles and improving welding joint irregularity were analyzed. The results showed that the on-line rail milling technology can remove the surface defects at the rail crown and gauge comer perfectly, re-profile railhead transverse profile with a tolerance of - 1. 0-0.2 ram, improve longitudinal irregularity of rail surface, with the RMS amplitude of irregularity reduced more than 50% and the number of out-of- limited amplitude reduced by 42% - 82% in all wavelength ranges. The improvement of welding joint irregularity depends on the amount of metal removal determined by the milling equipment and the primal amplitude. 展开更多
关键词 high-speed railway RAIL Rail maintenance Rail defects Rail profile MILLING
下载PDF
A power-quality monitoring and assessment system for high-speed railways based on train-network-data center integration
16
作者 Jun Zhu Haitao Hu +2 位作者 Zhengyou He Xiaomin Guo Weiguo Pan 《Railway Engineering Science》 2021年第1期30-41,共12页
In recent years,with the rapid development of high-speed railways(HSRs),power interruptions or disturbances in traction power supply systems have become increasingly dangerous.However,it is often impossible to detect ... In recent years,with the rapid development of high-speed railways(HSRs),power interruptions or disturbances in traction power supply systems have become increasingly dangerous.However,it is often impossible to detect these faults immediately through single-point monitoring or collecting data after accidents.To coordinate the power quality data of both traction power supply systems(TPSSs)and high-speed trains(HSTs),a monitoring and assessing system is proposed to access the power quality issues on HSRs.By integrating train monitoring,traction substation monitoring and data center,this monitoring system not only realizes the real-time monitoring of operational behaviors for both TPSSs and HSTs,but also conducts a comprehensive assessment of operational quality for train-network systems.Based on a large number of monitoring data,the field measurements show that this real-time monitoring system is effective for monitoring and evaluating a traction-network system. 展开更多
关键词 high-speed railway Traction power supply system Power quality monitoring Data center
下载PDF
A train timetable rescheduling approach based on multi-train tracking optimization of high-speed railways
17
作者 Rongsheng Wang Tao Zhang +2 位作者 Zhiming Yuan Shuxin Ding Qi Zhang 《Railway Sciences》 2023年第3期358-370,共13页
Purpose–This paper aims to propose a train timetable rescheduling(TTR)approach from the perspective of multi-train tracking optimization based on the mutual spatiotemporal information in the high-speed railway signal... Purpose–This paper aims to propose a train timetable rescheduling(TTR)approach from the perspective of multi-train tracking optimization based on the mutual spatiotemporal information in the high-speed railway signaling system.Design/methodology/approach–Firstly,a single-train trajectory optimization(STTO)model is constructed based on train dynamics and operating conditions.The train kinematics parameters,including acceleration,speed and time at each position,are calculated to predict the arrival times in the train timetable.A STTO algorithm is developed to optimize a single-train time-efficient driving strategy.Then,a TTR approach based on multi-train tracking optimization(TTR-MTTO)is proposed with mutual information.The constraints of temporary speed restriction(TSR)and end of authority are decoupled to calculate the tracking trajectory of the backward tracking train.The multi-train trajectories at each position are optimized to generate a timeefficient train timetable.Findings–The numerical experiment is performed on the Beijing-Tianjin high-speed railway line and CR400AF.The STTO algorithm predicts the train’s planned arrival time to calculate the total train delay(TTD).As for the TSR scenario,the proposed TTR-MTTO can reduce TTD by 60.60%compared with the traditional TTR approach with dispatchers’experience.Moreover,TTR-MTTO can optimize a time-efficient train timetable to help dispatchers reschedule trains more reasonably.Originality/value–With the cooperative relationship and mutual information between train rescheduling and control,the proposed TTR-MTTO approach can automatically generate a time-efficient train timetable to reduce the total train delay and the work intensity of dispatchers. 展开更多
关键词 high-speed railway Train timetable rescheduling Multi-train trajectory optimization Train operation control Integration of train rescheduling and control
下载PDF
SPEEDING UP THE CONSTRUCTION OF HIGH-SPEED RAILWAYS IN CHINA
18
作者 Cheng Qingguo, Lu Zhaojun and Zhou Jing(China Academy of Railway Sciences, Beijing) 《Bulletin of the Chinese Academy of Sciences》 1997年第2期102-104,共3页
High-speed railways have the merits of high speed, high transport capacity, low consumption of energy, less pollution, less occupation of land, and greater safety. The development of high-speed railways is suitable fo... High-speed railways have the merits of high speed, high transport capacity, low consumption of energy, less pollution, less occupation of land, and greater safety. The development of high-speed railways is suitable for the national conditions in China.The authors suggest that, with the Hu-Ning (Shanghai-Nanjing) section of the Jing-Hu (Beijing-Shanghai) Railway as the starting point, a high-speed dedicated passenger railway line be built to realize the separate transportation of passengers and goods, thus easing the strain on transport in East China, accumulating experience for the future development of high-speed railways, and bringing along the development of high and new technology industries. 展开更多
关键词 HIGH SPEEDING UP THE CONSTRUCTION OF high-speed railways IN CHINA
下载PDF
Accumulative deformation in railway track induced by high-speed traffic loading of the trains 被引量:18
19
作者 Bian Xuecheng Jiang Hongguang Chen Yunmin 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2010年第3期319-326,共8页
Prediction and control of the permanent settlement of a track caused by traffic loading from trains is crucial to high-speed railway design and maintenance. In this study, a unified prediction model of accumulative de... Prediction and control of the permanent settlement of a track caused by traffic loading from trains is crucial to high-speed railway design and maintenance. In this study, a unified prediction model of accumulative deformation of geomaterials used in railway construction subjected to cyclic loadings is introduced and calibrated using physical model testing. Based on this versatile model, a calculation approach to determine the track structure settlement under repeated loadings caused by the movement of the wheel axle of the train is proposed. Regression analysis on the physical model testing is adopted to determine the parameters involved in the computational approach. Comparison of model test data and computed results shows that the parameters obtained from the back-analysis are consistent throughout the various testing conditions, and the proposed calculation approach is capable of satisfactorily predicting the accumulative settlement of the railway roadbed and subgrade soil for various axle loads and loading cycles. A case study of a high-speed railway is performed to demonstrate the feasibility of the proposed approach in realistic engineering applications. The computation results from the settlement development of a roadbed and subgrade soil are presented and discussed. 展开更多
关键词 cyclic loading AGGREGATE clay accumulative settlement high-speed railway
下载PDF
Deformation characteristics and safety assessment of a high-speed railway induced by undercutting metro tunnel excavation 被引量:21
20
作者 Wangping Qian Taiyue Qi +2 位作者 Yunjian Zhao Yizhou Le Haiyang Yi 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2019年第1期88-98,共11页
Stratum deformation(settlement) is a challenging issue in tunnel engineering, especially when construction of metro tunnels has to undercut high-speed railway. For this purpose, we used the FLAC30 software to analyze ... Stratum deformation(settlement) is a challenging issue in tunnel engineering, especially when construction of metro tunnels has to undercut high-speed railway. For this purpose, we used the FLAC30 software to analyze the stratum settlement characteristics of high-speed railway at different crossing angles intersected by metro tunnel, in terms of ground settlement trough, stratum slip line and irregularity of ballastless tracks. According to the evolution of the stratum settlement at different angle regions, an optimized angle is proposed for the actual project design. In order to reduce the influence of stratum settlement on the safety of high-speed railway, an approach of safety assessment is proposed for the shield engineering undercutting high-speed railway, as per Chinese specifications using numerical results and on-site conditions. A case study is conducted for the shield tunnel section crossing the Wuhan-Guangzhou High-speed Railway between the Guangzhou North Railway Station and the Huacheng Road Station, which represents the first metro tunnel project passing below a high-speed railway in China. A series of measures is taken to ensure the safe excavation of the shield tunnel and the operation of the high-speed railway. The results can provide a technical support for performing a safety evaluation between high-speed railways and metro tunnels. 展开更多
关键词 METRO tunnel EXCAVATION high-speed railway SETTLEMENT characteristics Safety assessment Numerical simulation Case application
下载PDF
上一页 1 2 11 下一页 到第
使用帮助 返回顶部