期刊文献+
共找到17篇文章
< 1 >
每页显示 20 50 100
Study on Fracture Delay of High-Strength Bolts in Road Bridge Maintenance
1
作者 Rongpeng Xu 《Journal of Architectural Research and Development》 2024年第5期1-6,共6页
In the maintenance work of highway and bridge engineering structures,the fracture delay of high-strength bolts is a content that needs to be focused on and researched.Based on this,the paper analyzes the fracture dela... In the maintenance work of highway and bridge engineering structures,the fracture delay of high-strength bolts is a content that needs to be focused on and researched.Based on this,the paper analyzes the fracture delay of high-strength bolts in highway bridge maintenance,including an overview of the fundamental research on fracture delay and related specific studies.It is hoped that this study can provide scientific reference for the reasonable maintenance of high-strength bolts,so as to ensure the overall maintenance effect of highway bridge projects. 展开更多
关键词 Highway bridge engineering Bridge maintenance high-strength bolts Fracture delay Maintenance recommendations
下载PDF
Deformation-softening behaviors of high-strength and high-toughness steels used for rock bolts 被引量:4
2
作者 Ding Wang Manchao He +2 位作者 Zhigang Tao Aipeng Guo Xuchun Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第6期1872-1884,共13页
In deep ground engineering,the use of high-strength and high-toughness steels for rock bolt can significantly improve its energy absorption capacity.However,the mechanisms and effects of rock loading conditions on thi... In deep ground engineering,the use of high-strength and high-toughness steels for rock bolt can significantly improve its energy absorption capacity.However,the mechanisms and effects of rock loading conditions on this kind of high energy-absorbing steel for rock bolt remain immature.In this study,taking Muzhailing highway tunnel as the background,physically based crystal plasticity simulations were performed to understand the effect of rock loading rate and pretension on the deformation behaviors of twinning induced plasticity(TWIP)steel used for rock bolt.The material physical connecting to the underlying microscopic mechanisms of dislocation glide and deformation twinning were incorporated in numerical modeling.The rock loading conditions were mimicked by the real-time field monitoring data of the NPR bolt/cable equipment installed on the tunnel surrounding rock surface.The results indicate that the bolt rod exhibits pronounced deformation-softening behavior with decrease of the loading rate.There is also a sound deformation-relaxation phenomenon induced by the dramatic decrease of loading rate after pre-tensioning.The high pretension(>600 MPa or 224 k N)can help bolt rod steel resist deformation-softening behavior,especially at low loading rate(<10~(-1)MPa/s or 10~(-2)kN/s).The loading rate was found to be a significant factor affecting deformation-softening behavior while the pretension was found to be the major parameter accounting for the deformation-relaxation scenario.The results provide the theoretical basis and technical support for practical applications. 展开更多
关键词 Rock bolt high-strength and high-toughness steels Loading rate PRETENSION Deformation-softening Crystal plasticity
下载PDF
Numerical Model Research on Rotational Performance of Beam-Column High-Strength Bolt Extension End-Plate Connection Node
3
作者 Xiao Lang 《Open Journal of Modelling and Simulation》 2021年第3期231-245,共15页
The high-strength bolted end plate connection is widely used in the construction industry with its green environmental protection and excellent seismic performance. The joints of the joints are semi-rigid, the force p... The high-strength bolted end plate connection is widely used in the construction industry with its green environmental protection and excellent seismic performance. The joints of the joints are semi-rigid, the force performance is extremely complicated, and the experimental research cost is relatively high, and the cycle is very long. Therefore, the establishment of an efficient numerical model is of great significance for evaluating the force performance of high-strength bolt end plates. In this paper, the influence of different material models on the rotation performance of the joint is studied by numerical simulation, and the bending moment-rotation curve is obtained. The numerical simulation and the experimental results are in good agreement, so as to provide a reference for the design and application of this kind of joint. 展开更多
关键词 high-strength bolt Rotation Performance Material Model Numerical Model
下载PDF
Influence of anchorage length and pretension on the working resistance of rock bolt based on its tensile characteristics 被引量:3
4
作者 Jucai Chang Kai He +3 位作者 Dongdong Pang Dong Li Chuanming Li Bingjun Sun 《International Journal of Coal Science & Technology》 EI CAS CSCD 2021年第6期1384-1399,共16页
In coal mining roadway support design,the working resistance of the rock bolt is the key factor affecting its maximum support load.Effective improvement of the working resistance is of great significance to roadway su... In coal mining roadway support design,the working resistance of the rock bolt is the key factor affecting its maximum support load.Effective improvement of the working resistance is of great significance to roadway support.Based on the rock bolt’s tensile characteristics and the mining roadway surrounding rock deformation,a mechanical model for calculating the working resistance of the rock bolt was established and solved.Taking the mining roadway of the 17102(3)working face at the Panji No.3 Coal Mine of China as a research site,with a quadrilateral section roadway,the influence of pretension and anchorage length on the working resistance of high-strength and ordinary rock bolts in the middle and corner of the roadway is studied.The results show that when the bolt is in the elastic stage,increasing the pretension and anchorage length can effectively improve the working resistance.When the bolt is in the yield and strain-strengthening stages,increasing the pretension and anchorage length cannot effectively improve the working resistance.The influence of pretension and anchorage length on the ordinary and high-strength bolts is similar.The ordinary bolt’s working resistance is approximately 25 kN less than that of the high-strength bolt.When pretension and anchorage length are considered separately,the best pretensions of the high-strength bolt in the middle of the roadway side and the roadway corner are 41.55 and 104.26 kN,respectively,and the best anchorage lengths are 1.54 and 2.12 m,respectively.The best anchorage length of the ordinary bolt is the same as that of the high-strength bolt,and the best pretension for the ordinary bolt in the middle of the roadway side and at the roadway corner is 33.51 and 85.12 kN,respectively.The research results can provide a theoretical basis for supporting the design of quadrilateral mining roadways. 展开更多
关键词 Working resistance of rock bolt PRETENSION Anchorage length Ordinary bolt high-strength bolt Quadrilateral section roadway
下载PDF
Hydrogen-induced delayed fracture of Cu-containing high-strength bolt steel
5
作者 Xiao-li Zhao Cheng-xiang Zhang +2 位作者 Yong-jian Zhang Wei-jun Hui Xiu-ming Zhao 《Journal of Iron and Steel Research International》 SCIE EI CAS CSCD 2023年第2期375-383,共9页
The hydrogen-induced delayed fracture(HIDF)behavior of a 1300-MPa-grade high-strength bolt steel 42CrMoV containing 0.42 wt.%Cu was investigated by constant load tensile test in a pH 3.5 Walpole solution.It is shown t... The hydrogen-induced delayed fracture(HIDF)behavior of a 1300-MPa-grade high-strength bolt steel 42CrMoV containing 0.42 wt.%Cu was investigated by constant load tensile test in a pH 3.5 Walpole solution.It is shown that the addition of Cu is beneficial to enhance the HIDF resistance by~13%.The observation of the fracture surface revealed that the area fraction of brittle crack initiation zone decreased remarkably for the Cu-added steel.Both the corrosion pit depth and the corrosion rate of the Cu-added steel in the Walpole solution are notably decreased,which is primarily because of the formation of a Cu-rich protective compact rust layer and slightly higher corrosion potential.As a result,the absorbed hydrogen content in that solution was also decreased by~21%.It is concluded that the improvement in the HIDF resistance of the tested steel is primarily due to the increase in corrosion resistance and resultant decrease in the absorbed diffusible hydrogen content in the acidic condition. 展开更多
关键词 Hydrogen-induced delayed fracture Hydrogen embrittlement high-strength bolt steel COPPER CORROSION
原文传递
An ultra-thin bolt tension sensor and online monitoring system:For application in hydropower plant unit
6
作者 Shaoquan ZHANG Yanke TAN +1 位作者 Hanbin GE Qilin ZHANG 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2024年第9期1388-1400,共13页
The condition of bolted connections significantly affects the structural safety.However,conventional bolt tension sensors fail to provide precise measurements due to their bulky size or inadequate stability.This study... The condition of bolted connections significantly affects the structural safety.However,conventional bolt tension sensors fail to provide precise measurements due to their bulky size or inadequate stability.This study employs the piezoresistive effect of crystalline silicon material to fabricate an ultrathin sensor.The sensor exhibits a linear relationship between pressure and voltage,an exceptional stability at varying temperatures,and a superior resistance to corrosion,making it adaptable and user-friendly for applications of high-strength bolt tension monitoring.A monitoring system,incorporating the proposed sensor,has also been developed.This system provides real-time display of bolt tension and enables the assessment of sensor and structural conditions,including bolt loosening or component failure.The efficacy of the proposed sensor and monitoring system was validated through a project carried out at the Xiluodu Hydropower Plant.According to the results,the sensor and online monitoring system effectively gauged and proficiently conveyed and stored bolt tension data.In addition,correlations were created between bolt tensions and essential unit parameters,such as water head,active power,and pressures at vital points,facilitating anomaly detection and early warning. 展开更多
关键词 ultra-thin sensor high-strength bolt tension online monitoring system anomaly alarm hydro-generator units
原文传递
方形矿用隔爆箱箱体螺栓组分布结构优化 被引量:7
7
作者 朱高鹏 孙朝阳 李攀攀 《应用科技》 CAS 2014年第6期67-69,共3页
为解决方形矿用隔爆箱箱体螺栓组均布情况下,受到内部压力时各螺栓受力不均的问题,提出了一种方形压力容器螺栓组布局的优化方法。该方法利用ANSYS有限元进行建模并受力分析,然后对ANSYS有限元的分析结果加权处理,利用Matlab工具对螺栓... 为解决方形矿用隔爆箱箱体螺栓组均布情况下,受到内部压力时各螺栓受力不均的问题,提出了一种方形压力容器螺栓组布局的优化方法。该方法利用ANSYS有限元进行建模并受力分析,然后对ANSYS有限元的分析结果加权处理,利用Matlab工具对螺栓组的分布情况进行布局优化;然后再次进行有限元分析,发现螺栓组的受力状况逐渐均衡,利用该优化方法反复优化,发现螺栓组各螺栓受力趋于均衡,表明该优化法的有效性。 展开更多
关键词 隔爆电源箱 螺栓 布置方案 加权平均法 优化设计 分布结构 ANSYS
下载PDF
冷却器密封端螺栓联接结构强度及密封性分析 被引量:1
8
作者 徐建民 汪家琼 《石油化工设备》 CAS 2006年第3期21-23,共3页
介绍了用接触单元、预紧单元处理某冷却器方形开孔及其密封的螺栓联接问题的方法,通过ANSYS分析得出了该结构的强度和密封性结论,为精确分析此类螺栓联接问题提供了有效手段。
关键词 冷却器 螺栓联接 有限元分析
下载PDF
地铁暗挖车站风道与车站主体交叉段及马头门处系统锚杆与钢架联体支护技术 被引量:8
9
作者 杨宏射 《隧道建设》 2014年第9期900-907,共8页
以"青岛地铁一期工程(3号线)土建03标的延安三路站施工"为例,指出"风道进入车站主体的马头门和交叉段"部位设计要求的方法施工将造成工期拖延,并且个别支护措施在施工中不易实现而且在后续施工中存在安全隐患,通过... 以"青岛地铁一期工程(3号线)土建03标的延安三路站施工"为例,指出"风道进入车站主体的马头门和交叉段"部位设计要求的方法施工将造成工期拖延,并且个别支护措施在施工中不易实现而且在后续施工中存在安全隐患,通过对原设计中"风道进入车站主体的马头门和交叉段"施工方法的优化、提出了"系统锚杆与钢架联体支护"的新方法,并在现场实际施工中取得了成功;进而对"系统锚杆与钢架联体支护"的改进使用进行了阐述,为同类工程施工及隧道支护提出了一种新思路。 展开更多
关键词 地铁 暗挖车站 风道与车站交叉段 马头门 锚杆 钢架 联体支护
下载PDF
高强度螺栓摩擦型连接的节点计算方法
10
作者 秦大军 《锅炉制造》 2002年第2期19-20,共2页
本文介绍了高强度螺栓摩擦型连接的节点计算方法及其根据此方法编制的计算程序
关键词 高强度螺栓节点计算 杠杆力 EXECL
下载PDF
弯矩作用下火箭对接面螺栓拉力分布规律探讨 被引量:5
11
作者 袁彪 王淑范 敖林 《导弹与航天运载技术》 北大核心 2003年第2期37-40,共4页
对火箭结构总体设计中弯矩作用下壳段对接螺栓拉力计算方法进行了分析 ,指出其中的不合理性 ,并采用有限元法对壳段典型对接形式进行了数值计算 ,探讨了对接端框厚度、螺栓分布圆半径及螺栓数目对螺栓拉力。
关键词 火箭结构 总体设计 弯矩作用 对接面 螺栓 拉力分布规律
下载PDF
渗水夹砂薄页岩巷道锚注支护机理及数值模拟 被引量:1
12
作者 李骏 乔卫国 林登阁 《煤炭技术》 CAS 北大核心 2016年第7期38-40,共3页
通过对彭庄矿某交叉点加固方案的探讨,分析在裂隙发育、地下水丰富且含有膨胀性矿物的砂岩巷道中采用锚注技术作为支护方案时的可行性及其支护机理。应用FLAC^(3D)软件分析对比注浆加固前后巷道的变形状况,肯定了注浆加固方案的支护效果。
关键词 渗水弱化 交叉点 锚注机理
下载PDF
软岩巷道交叉点锚杆支护数值模拟分析 被引量:4
13
作者 杨明宇 宋宏伟 +1 位作者 何永礼 唐德康 《徐州建筑职业技术学院学报》 2008年第4期9-11,共3页
以云南恩洪煤矿软岩巷道为背景,应用数值模拟对软岩巷道交叉点3种支护方案进行分析研究.结果表明,全断面预应力锚杆支护改善了交叉点的应力集中程度,起到一定卸压作用,并控制了围岩的变形量,保证了软岩巷道交叉点的稳定.
关键词 软岩巷道 交叉点 数值模拟 锚杆支护
下载PDF
Seismic behavior and mechanism analysis of innovative precast shear wall involving vertical joints 被引量:3
14
作者 孙建 邱洪兴 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第4期1536-1547,共12页
To study the seismic performance and load-transferring mechanism of an innovative precast shear wall(IPSW) involving vertical joints, an experimental investigation and theoretical analysis were successively conducted ... To study the seismic performance and load-transferring mechanism of an innovative precast shear wall(IPSW) involving vertical joints, an experimental investigation and theoretical analysis were successively conducted on two test walls. The test results confirm the feasibility of the novel joints as well as the favorable seismic performance of the walls, even though certain optimization measures should be taken to improve the ductility. The load-transferring mechanism subsequently is theoretically investigated based on the experimental study. The theoretical results show the load-transferring route of the novel joints is concise and definite. During the elastic stage, the vertical shear stress in the connecting steel frame(CSF) distributes uniformly; and each high-strength bolt(HSB)primarily delivers vertical shear force. However, the stress in the CSF redistributes when the walls develop into the elastic-plastic stage. At the ultimate state, the vertical shear stress and horizontal normal stress in the CSF distribute linearly; and the HSBs at both ends of the CSF transfer the maximum shear forces. 展开更多
关键词 precast shear wall vertical joint seismic behavior high-strength bolt connecting steel frame
下载PDF
隔离开关机器人螺栓拆接系统设计与实现 被引量:1
15
作者 王硕君 陈劲 李辰盟 《电工技术》 2019年第6期88-90,共3页
为了提高带电作业的智能性、安全性和时效性,减轻操作人员的劳动强度,降低高压强磁场对人体的危害,同时保证供电连续性及可靠性,本文提出将机器人技术引入到变电站隔离开关连接板带电检修作业中,研制特定的螺栓拆接装置,可以有效提升电... 为了提高带电作业的智能性、安全性和时效性,减轻操作人员的劳动强度,降低高压强磁场对人体的危害,同时保证供电连续性及可靠性,本文提出将机器人技术引入到变电站隔离开关连接板带电检修作业中,研制特定的螺栓拆接装置,可以有效提升电力行业带电作业自动化水平,降低带电作业风险。 展开更多
关键词 隔离开关连接板 机器人 带电作业 螺栓
下载PDF
飞机主起仓耳接头断裂分析 被引量:1
16
作者 邬建新 张芙蓉 王宇魁 《金属热处理》 CAS CSCD 北大核心 2011年第S1期35-38,共4页
通过对断裂耳接头进行断口分析、金相组织分析、化学成分分析、硬度测试,并对该处接头进行了应力应变测量,从而确定了耳接头断裂是低周疲劳断裂;该耳接头所特有的形状、连接方式、受力情况导致了断口形貌的特殊性,断口形貌为特殊的疲劳... 通过对断裂耳接头进行断口分析、金相组织分析、化学成分分析、硬度测试,并对该处接头进行了应力应变测量,从而确定了耳接头断裂是低周疲劳断裂;该耳接头所特有的形状、连接方式、受力情况导致了断口形貌的特殊性,断口形貌为特殊的疲劳断口形貌。 展开更多
关键词 接头 疲劳断裂 应力 断裂 螺栓铰接
原文传递
分瓣大齿轮联接螺栓的受力分析及在工艺加工中的应用
17
作者 刘成勋 李学群 +1 位作者 张雁 李卫军 《矿山机械》 北大核心 2014年第12期123-126,共4页
矿用磨机是选矿厂最重要的设备之一,在磨机传动大齿轮加工过程中,如果不能解决出现在联接面的张口错边问题,将严重影响磨机的运转平稳性及可靠性,从而影响矿用磨机的使用寿命。通过分析大齿轮联接面联接螺栓的受力状况,编制了螺栓预紧... 矿用磨机是选矿厂最重要的设备之一,在磨机传动大齿轮加工过程中,如果不能解决出现在联接面的张口错边问题,将严重影响磨机的运转平稳性及可靠性,从而影响矿用磨机的使用寿命。通过分析大齿轮联接面联接螺栓的受力状况,编制了螺栓预紧力计算及选用界面软件,解决了大齿轮联接面的张口错边问题,为大齿轮的加工提供了技术支持。 展开更多
关键词 矿用磨机 分瓣大齿轮 联接螺栓
原文传递
上一页 1 下一页 到第