In recent years,China’s society and economy has been developing very rapidly,and various industries are showing a trend of vigorous development.The importance of control and management of project cost in highway proj...In recent years,China’s society and economy has been developing very rapidly,and various industries are showing a trend of vigorous development.The importance of control and management of project cost in highway project management is becoming more and more prominent.PPP model has been widely used in the control and management of highway project cost with its own unique advantages.The author analyzes the important advantages of the PPP model and the existing problems in the cost control and management of highway projects,and puts forward effective measures for the cost control and management of highway projects using the PPP model,in hope of helping with the smooth implementation of the work.展开更多
This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysi...This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia.展开更多
In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy e...In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.展开更多
Under the background of rapid social and economic development,the traffic volume of highways has increased,which has brought tremendous pressure to the old highways.In response to this situation,the original highway m...Under the background of rapid social and economic development,the traffic volume of highways has increased,which has brought tremendous pressure to the old highways.In response to this situation,the original highway must be reconstructed and extended.It is necessary to focus on the analysis and exploration of the methods of interchange reconstruction and extension in current highway reconstruction and extension to avoid affecting normal traffic,as it will inevitably have an impact on the traffic operation environment.For this situation,it is necessary to analyze and understand the format and characteristics of traffic organization of the interchange operation area in time and propose corresponding safeguard measures.展开更多
Egypt construction projects are associated with different levels of risks. The lack of familiarity of project management standards is one of the common risks in the construction industry in Egypt. The main aim of this...Egypt construction projects are associated with different levels of risks. The lack of familiarity of project management standards is one of the common risks in the construction industry in Egypt. The main aim of this paper is to identify the most significant risk factors affecting highway construction project in Egypt to decrease the likelihood and impact of those risks. The research method starts with extensive literature review to provide a prime risk factors list which was also augmented to expertise to reach final risk factor list which contains all risks that may be faced during highway construction. Subsequently, a set of 12 risk groups consisting of 73 risks was selected and a questionnaire survey was conducted to determine the likelihood and consequences of the identified risks. Later, a software application was developed using MATLAB to facilitate risk evaluation of highways projects. Results indicated that the risk factors arise from owner side is one of the most common risk factors in the construction industry in Egypt as the owner in the majority of construction project in Egypt is the governmental sector, however, the overall project risk of highway construction projects in Egypt is considered as at a medium level.展开更多
The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement co...The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users.This paper presents a state-of-the-art review of multi-objective optimization(MOO)problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities.First,the paper presents a taxonomy and hierarchy for these activities,the role of funding sources,and levels of jurisdiction.The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling(historical practices,expert opinion,and explicit mathematical optimization)and identifies the pros and cons of each mechanism.The paper then focuses on the optimization mechanism and presents the types of optimization problems,formulations,and objectives that have been used in the literature.Next,the paper examines various solution algorithms and discusses issues related to their implementation.Finally,the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities,and makes recommendations to overcome some of these barriers.展开更多
Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensio...Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensions,posing significant challenges.To address inaccuracies in investment targets and operational complexities,this study focuses on a beam-bridge construction project in a district of Shijiazhuang city as a case study.Drawing upon historical analogs,the project employs a Work Breakdown Structure(WBS)to decompose the engineering works.Building on theories of Cost Significant(CS)and Whole Life Costing(WLC),the study constructs Cost Significant Items(CSIs)and develops a CNN-BiLSTM-Attention neural network for nonlinear prediction.By identifying significant cost drivers in engineering projects,this paper presents a streamlined cost estimation method that significantly reduces computational burdens,simplifies data collection processes,and optimizes data analysis and forecasting,thereby enhancing prediction accuracy.Finally,validation with real-world cost fluctuation data demonstrates minor errors,meeting predictive requirements across project execution phases.展开更多
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face...Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.展开更多
In recent years, the method of TQM (Total Quality Management) is widely recognized. However, contents of target entities for assessment are various, and it is very difficult to define the whole scope of TQM. On the ot...In recent years, the method of TQM (Total Quality Management) is widely recognized. However, contents of target entities for assessment are various, and it is very difficult to define the whole scope of TQM. On the other hand, it is very important to define the whole target entities of quality management about the TQM because lack of important target entities may cause significant risk of loss in future. Furthermore, target entities of TQM should correspond to needs and priority of an objective requirement and that should be based on the consideration of basic principle of quality management. In the previous study, we have proposed the “framework of new TQM” of assessment for a total quality management of organizations based on the original concept of “TQM matrix”. On the other hand, we have proposed the view point of “Three-Dimensional Unification Value Models” for an evaluation of system product. Therefore, in this paper, we propose the target entities of whole assessment of quality management of organization totally based on the consideration of “New TQM framework” and the view point of “Three-Dimensional Unification Value Models”. Also, this paper proposes the result of verification based on the result of comparison between proposed target entities of assessment and American Malcolm Baldrige Prize for Performance Excellence.展开更多
In the previous study, we suggested the concept of new TQM based on the consideration of basic concept of Quality Control. Also, in the previous study, we suggested the target domains and entities of product and proce...In the previous study, we suggested the concept of new TQM based on the consideration of basic concept of Quality Control. Also, in the previous study, we suggested the target domains and entities of product and process based on the TQM Matrix and view point of Three Dimensional Unification Value Models for managing quality of organization systems. Furthermore, in the previous study, we suggest the Common Management Process of organizations. Based on the above suggestion, in this paper, we would like to propose the Common Management Process Model of Total Quality Management based on the consideration of situation analysis and more precise definition of TQM Matrix and Three Dimensional Unification Value Model of “Product and Process”. Improvement of quality and efficiency of organization management can be expected by the integration of conventional different management such as quality assurance, quality improvement, risk management, investment individually from the view point of common management process.展开更多
文摘In recent years,China’s society and economy has been developing very rapidly,and various industries are showing a trend of vigorous development.The importance of control and management of project cost in highway project management is becoming more and more prominent.PPP model has been widely used in the control and management of highway project cost with its own unique advantages.The author analyzes the important advantages of the PPP model and the existing problems in the cost control and management of highway projects,and puts forward effective measures for the cost control and management of highway projects using the PPP model,in hope of helping with the smooth implementation of the work.
文摘This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia.
文摘In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.
文摘Under the background of rapid social and economic development,the traffic volume of highways has increased,which has brought tremendous pressure to the old highways.In response to this situation,the original highway must be reconstructed and extended.It is necessary to focus on the analysis and exploration of the methods of interchange reconstruction and extension in current highway reconstruction and extension to avoid affecting normal traffic,as it will inevitably have an impact on the traffic operation environment.For this situation,it is necessary to analyze and understand the format and characteristics of traffic organization of the interchange operation area in time and propose corresponding safeguard measures.
文摘Egypt construction projects are associated with different levels of risks. The lack of familiarity of project management standards is one of the common risks in the construction industry in Egypt. The main aim of this paper is to identify the most significant risk factors affecting highway construction project in Egypt to decrease the likelihood and impact of those risks. The research method starts with extensive literature review to provide a prime risk factors list which was also augmented to expertise to reach final risk factor list which contains all risks that may be faced during highway construction. Subsequently, a set of 12 risk groups consisting of 73 risks was selected and a questionnaire survey was conducted to determine the likelihood and consequences of the identified risks. Later, a software application was developed using MATLAB to facilitate risk evaluation of highways projects. Results indicated that the risk factors arise from owner side is one of the most common risk factors in the construction industry in Egypt as the owner in the majority of construction project in Egypt is the governmental sector, however, the overall project risk of highway construction projects in Egypt is considered as at a medium level.
基金This work is supported by the Next Generation Transportation Systems Center(NEXTRANS),USDOT's Region 5 University Transportation CenterThe work is also affiliated with Purdue University College of Engineering's Institute for Control,Optimization,and Networks(ICON)and Center for Intelligent Infrastructure(CII)initiatives.
文摘The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users.This paper presents a state-of-the-art review of multi-objective optimization(MOO)problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities.First,the paper presents a taxonomy and hierarchy for these activities,the role of funding sources,and levels of jurisdiction.The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling(historical practices,expert opinion,and explicit mathematical optimization)and identifies the pros and cons of each mechanism.The paper then focuses on the optimization mechanism and presents the types of optimization problems,formulations,and objectives that have been used in the literature.Next,the paper examines various solution algorithms and discusses issues related to their implementation.Finally,the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities,and makes recommendations to overcome some of these barriers.
文摘Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensions,posing significant challenges.To address inaccuracies in investment targets and operational complexities,this study focuses on a beam-bridge construction project in a district of Shijiazhuang city as a case study.Drawing upon historical analogs,the project employs a Work Breakdown Structure(WBS)to decompose the engineering works.Building on theories of Cost Significant(CS)and Whole Life Costing(WLC),the study constructs Cost Significant Items(CSIs)and develops a CNN-BiLSTM-Attention neural network for nonlinear prediction.By identifying significant cost drivers in engineering projects,this paper presents a streamlined cost estimation method that significantly reduces computational burdens,simplifies data collection processes,and optimizes data analysis and forecasting,thereby enhancing prediction accuracy.Finally,validation with real-world cost fluctuation data demonstrates minor errors,meeting predictive requirements across project execution phases.
文摘Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.
文摘In recent years, the method of TQM (Total Quality Management) is widely recognized. However, contents of target entities for assessment are various, and it is very difficult to define the whole scope of TQM. On the other hand, it is very important to define the whole target entities of quality management about the TQM because lack of important target entities may cause significant risk of loss in future. Furthermore, target entities of TQM should correspond to needs and priority of an objective requirement and that should be based on the consideration of basic principle of quality management. In the previous study, we have proposed the “framework of new TQM” of assessment for a total quality management of organizations based on the original concept of “TQM matrix”. On the other hand, we have proposed the view point of “Three-Dimensional Unification Value Models” for an evaluation of system product. Therefore, in this paper, we propose the target entities of whole assessment of quality management of organization totally based on the consideration of “New TQM framework” and the view point of “Three-Dimensional Unification Value Models”. Also, this paper proposes the result of verification based on the result of comparison between proposed target entities of assessment and American Malcolm Baldrige Prize for Performance Excellence.
文摘In the previous study, we suggested the concept of new TQM based on the consideration of basic concept of Quality Control. Also, in the previous study, we suggested the target domains and entities of product and process based on the TQM Matrix and view point of Three Dimensional Unification Value Models for managing quality of organization systems. Furthermore, in the previous study, we suggest the Common Management Process of organizations. Based on the above suggestion, in this paper, we would like to propose the Common Management Process Model of Total Quality Management based on the consideration of situation analysis and more precise definition of TQM Matrix and Three Dimensional Unification Value Model of “Product and Process”. Improvement of quality and efficiency of organization management can be expected by the integration of conventional different management such as quality assurance, quality improvement, risk management, investment individually from the view point of common management process.