Background: Venous thromboembolism (VTE) is a major public health problem due to its increasing frequency, mortality and management cost. This cost may require major financial efforts from patients, especially in deve...Background: Venous thromboembolism (VTE) is a major public health problem due to its increasing frequency, mortality and management cost. This cost may require major financial efforts from patients, especially in developing countries like ours where less than 7% of the population has health insurance. This study aimed to estimate the direct cost of managing VTE in three reference hospitals in Yaoundé. Methods: This was a cross-sectional retrospective study over a three-year period (from January 1st 2018 to December 31 2020) carried out in the Cardiology departments of the Central and General Hospitals, and the Emergency Centre of the city of Yaoundé. All patients managed during the study period for deep vein thrombosis and pulmonary embolism confirmed by venous ultrasound coupled with Doppler and computed tomography pulmonary angiography respectively were included. For each patient, we collected sociodemographic and clinical data as well as data on the cost of consultation, hospital stay, workups and medications. These data were analysed using SPSS version 23.0. Results: A total of 92 patient’s records were analysed. The median age was 60 years [48 - 68] with a sex ratio of 0.53. The median direct cost of management of venous thromboembolism was 766,375 CFAF [536,455 - 1,029,745] or $1415 USD. Management of pulmonary embolism associated with deep vein thrombosis was more costly than isolated pulmonary embolism or deep vein thrombosis. Factors influencing the direct cost of management of venous thromboembolism were: hospital structure (p = 0.015), health insurance (p 0.001), type of pulmonary embolism (p = 0.021), and length of hospital stay (p = 0.001). Conclusion: Management of VTE is a major financial burden for our patients and this burden is influenced by the hospital structure, health insurance, type of pulmonary embolism and length of hospital stay.展开更多
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a...The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.展开更多
The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The ma...The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.展开更多
With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the c...With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.展开更多
Fine cost management is a systematic, refined, and dynamic management method. This paper provides us the background and meanings of fine cost management, it defines and analyzes the connotation of fine cost management...Fine cost management is a systematic, refined, and dynamic management method. This paper provides us the background and meanings of fine cost management, it defines and analyzes the connotation of fine cost management in detail.展开更多
Implementing effective cost management approaches has recently gained momentum due to intense competition and increasing customer demands. Moreover, effective cost management approaches have contributed to firms' com...Implementing effective cost management approaches has recently gained momentum due to intense competition and increasing customer demands. Moreover, effective cost management approaches have contributed to firms' competitive advantage in relation to cost leadership strategy. Consequently, firms have implemented contemporary cost management systems, such as activity-based management, business process re-engineering, life-cycle costing, target costing, and theory of constraint (TOC), to enable them to become low-cost producers and compete effectively and sustain their performance. Furthermore, focusing on cost management to improve profitability has led to the integration of activity-based costing (ABC) and TOC. Therefore, the aim of this study is to review literature and discuss how integration of ABC and TOC can result in improved and sustained cost management. While these methods have different approaches in addressing cost management, treating them as complementary cost management approaches can result in improved cost management due to improved product costing, improved cost reporting, improved product-mix decisions, and improved cycle-time management. Improvement in cost management will then result in sustained cost management. Sustained cost management is further enhanced with the investment in information customer and shareholder value technology that supports cross-functional decision making to continue creating to remain competitive in the market.展开更多
The economic management of colleges and universities has always been a topic of great concern to China’s educational career,therefore,this paper will firstly make the necessary analysis of the current implementation ...The economic management of colleges and universities has always been a topic of great concern to China’s educational career,therefore,this paper will firstly make the necessary analysis of the current implementation of the economic management of colleges and universities in China,and then the reasons for the problems of economic management of colleges and universities in China is realized a detailed investigation,and finally,the economic management of colleges and universities based on capital and cost management optimization strategy is made a full discussion,looking forward to providing the necessary guidance for researchers in this field.展开更多
In view of economic globalization,China’s economy has entered a stage of normalized development.In the post pandemic era,the costs of raw materials,production,sales,and labor in Chinese enterprises continue to increa...In view of economic globalization,China’s economy has entered a stage of normalized development.In the post pandemic era,the costs of raw materials,production,sales,and labor in Chinese enterprises continue to increase,leading to severe competitive pressure among the enterprises.Therefore,it is of great theoretical and practical significance to actively apply the relevant theories of management economics to guide the cost management of Chinese enterprises,improve their economic benefits,and promote healthy and sustainable development.Currently,there are still many problems in terms of cost management in Chinese enterprises.Therefore,it is crucial to address these problems and further improve the effectiveness of cost management.This paper presents an overview of cost management and an analysis of the specific problems and provide corresponding countermeasures,in hopes of to providing a reference for cost management in enterprises and achieve the goal of stable and sustainable development of China’s economy.展开更多
With the current development and progress of the socialist marketing economy, the number of the private enterprises in our country increases constantly, and the development scale has been expanded constantly, which ha...With the current development and progress of the socialist marketing economy, the number of the private enterprises in our country increases constantly, and the development scale has been expanded constantly, which has become an important component for China's national economy, and making a huge contribution to promote the increase of China's national economy. In order to occupy a development location among the fierce market competition and expand the market share, the private enterprises in our country make many efforts constantly, such as strengthening and promotion of the internal management concept and the management mode, etc., which really obtains an obvious achievement and progress, however, due to the restriction of the various reasons, there are still many realistic problems existing in the financial cost management for the private enterprises, which restricts the sustainable, modern and scientific development step greatly, for the method on improving the financial cost management level in China's private enterprises and the guarantee of the pertinence and the efficiency for the financial cost management measures to be implemented in the private enterprises, it becomes the key problems which needs to be solved by the private enterprises currently.展开更多
This paper will be on the real estate development enterprise cost analysis and cost forecast, decision-making, plan, control, analysis and feedback were described, as well as how to use value engineering to enterprise...This paper will be on the real estate development enterprise cost analysis and cost forecast, decision-making, plan, control, analysis and feedback were described, as well as how to use value engineering to enterprise value chain each link cost allocation, ut also to the enterprise strategy analysis and research, as well as cost management and strategic interaction analysis. Finally, it has a cost of real estate development enterprises case analysis and research. The author believes that the article will be on the real estate development enterprise management have some practical significance.展开更多
In many compames, cost management models are abandoned due to their complexity and because of this, the academic literature has experienced a downturn in publications regarding cost management. This paper deepens the ...In many compames, cost management models are abandoned due to their complexity and because of this, the academic literature has experienced a downturn in publications regarding cost management. This paper deepens the understanding regarding the practical usability of cost management models for purchasing decisions, and provides a framework for determining a desired complexity of cost management in different purchasing environments. The complexity is defined along three dimensions identified in literature and the different purchasing environments stem from an adaptation of Kraljic's (1983) matrix.展开更多
Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. T...Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget.展开更多
Road transport is a flexible mode of transport and its importance in era of globalization increases. Management of road transport companies is, in this turbulent environment, exposed to many technical, legislative, an...Road transport is a flexible mode of transport and its importance in era of globalization increases. Management of road transport companies is, in this turbulent environment, exposed to many technical, legislative, and economic problems. Especially, the growing economic pressure leads to an urgent requirement of the manager and control system improvement. Activity-based costing (ABC) method is a very powerful tool to improve products, services, processes, and market strategies. ABC allows company management to understand what causes costs and how to manage them. Company under this scheme may get a glimpse of how efficiently a company converts the source value. The main objective of our research was to assess the possibility of application of the ABC method in a transport undertaking. ABC method as a fundamentally different view on the cost in the transport business helps to find the reasons of cost and thereby influences their levels to make better use of resources.. New managerial accounting methods aim to show management what information is needed, how and where this information can be obtained, and how they can be useful for the management of the company's proper planning, decision-making, and control. Information provided by management accounting is often a key factor in the analysis of alternative ways of solving problems. This article focuses on the transport enterprise management and helps to decide on the use of this method in business practice.展开更多
Currently, how to further improve and perfect construction economic cost management,minimizing construction economic management cost and construction investment of the enterprise have become the important content for ...Currently, how to further improve and perfect construction economic cost management,minimizing construction economic management cost and construction investment of the enterprise have become the important content for the daily management of construction enterprise managers. This article focuses on the construction economy under the conditions of market economy cost management, analyses related concepts and existing questions, and proposes targeted recommendations of the problem.展开更多
With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into th...With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.展开更多
In the social development,bidding agency plays an important part,providing services for the development of construction project bidding,and endows the development of construction project bidding with a diversified cha...In the social development,bidding agency plays an important part,providing services for the development of construction project bidding,and endows the development of construction project bidding with a diversified characteristic.The cost management of a construction project bidding stage has a dynamic characteristic.The bidding agency can provide bidding related business for the construction enterprises to ensure the quality and the effect of the bidding service,leading to the foundation for the sustainable development of the construction enterprises.This paper analyzes the deficiency in the bidding agency,and cost management in the bidding stage of the construction projects,as well provide some effective countermeasures or recommendation,to improve the value,and the role of the bidding agency in managing and controlling the construction project cost within the scope allowed by the law,and regulations,and also to ensure the comprehensive benefits of construction projects for the construction enterprise.展开更多
At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role...At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role and value in improving the ability of project management.Earned value method,which is an important way in the field of project management,enables whole project management to rise to a new height.The specific principle of earned value method will be elaborated by fully introducing the specific role of earned value method in engineering projects to provide a reference and basis for practitioners to improve their management ability.展开更多
BACKGROUND Coronavirus disease 2019(COVID-19)is strongly associated with an increased risk of thrombotic events,including severe outcomes such as pulmonary embolism.Elevated D-dimer levels are a critical biomarker for...BACKGROUND Coronavirus disease 2019(COVID-19)is strongly associated with an increased risk of thrombotic events,including severe outcomes such as pulmonary embolism.Elevated D-dimer levels are a critical biomarker for assessing this risk.In Gabon,early implementation of anticoagulation therapy and D-dimer testing has been crucial in managing COVID-19.This study hypothesizes that elevated Ddimer levels are linked to increased COVID-19 severity.AIM To determine the impact of D-dimer levels on COVID-19 severity and their role in guiding clinical decisions.METHODS This retrospective study analyzed COVID-19 patients admitted to two hospitals in Gabon between March 2020 and December 2023.The study included patients with confirmed COVID-19 diagnoses and available D-dimer measurements at admission.Data on demographics,clinical outcomes,D-dimer levels,and healthcare costs were collected.COVID-19 severity was classified as non-severe(outpatients)or severe(inpatients).A multivariable logistic regression model was used to assess the relationship between D-dimer levels and disease severity,with adjusted odds ratios(OR)and 95%CI.RESULTS A total of 3004 patients were included,with a mean age of 50.17 years,and the majority were female(53.43%).Elevated D-dimer levels were found in 65.81%of patients,and 57.21%of these experienced severe COVID-19.Univariate analysis showed that patients with elevated D-dimer levels had 3.33 times higher odds of severe COVID-19(OR=3.33,95%CI:2.84-3.92,P<0.001),and this association remained significant in the multivariable analysis,adjusted for age,sex,and year of collection.The financial analysis revealed a substantial burden,particularly for uninsured patients.CONCLUSION D-dimer predicts COVID-19 severity and guides treatment,but the high cost of anticoagulant therapy highlights the need for policies ensuring affordable access in resource-limited settings like Gabon.展开更多
In the context of globalization and digitalization, the application of transaction cost theory in supply chain management has become increasingly important. As business environments grow more complex, enterprises face...In the context of globalization and digitalization, the application of transaction cost theory in supply chain management has become increasingly important. As business environments grow more complex, enterprises face challenges in effectively managing supply chain transaction costs. This paper systematically explores the application of transaction cost theory in supply chain management, covering key areas such as supplier selection, supply chain integration, and risk management. The research finds that supplier evaluation models based on transaction costs can help enterprises make more comprehensive selection decisions. In terms of supply chain integration, transaction cost theory provides important guidance for vertical integration decisions and the design of collaboration mechanisms. The application of digital technologies has both reduced traditional transaction costs and introduced new cost considerations. Faced with emerging risks such as cybersecurity and geopolitical issues, enterprises need to adopt dynamic transaction cost management strategies. In the future, the application of transaction cost theory in supply chain management will likely place greater emphasis on interdisciplinary integration and sustainable development, providing theoretical support for enterprises to achieve efficient, flexible, and sustainable supply chain management in the changing global business environment.展开更多
With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovo...With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.展开更多
文摘Background: Venous thromboembolism (VTE) is a major public health problem due to its increasing frequency, mortality and management cost. This cost may require major financial efforts from patients, especially in developing countries like ours where less than 7% of the population has health insurance. This study aimed to estimate the direct cost of managing VTE in three reference hospitals in Yaoundé. Methods: This was a cross-sectional retrospective study over a three-year period (from January 1st 2018 to December 31 2020) carried out in the Cardiology departments of the Central and General Hospitals, and the Emergency Centre of the city of Yaoundé. All patients managed during the study period for deep vein thrombosis and pulmonary embolism confirmed by venous ultrasound coupled with Doppler and computed tomography pulmonary angiography respectively were included. For each patient, we collected sociodemographic and clinical data as well as data on the cost of consultation, hospital stay, workups and medications. These data were analysed using SPSS version 23.0. Results: A total of 92 patient’s records were analysed. The median age was 60 years [48 - 68] with a sex ratio of 0.53. The median direct cost of management of venous thromboembolism was 766,375 CFAF [536,455 - 1,029,745] or $1415 USD. Management of pulmonary embolism associated with deep vein thrombosis was more costly than isolated pulmonary embolism or deep vein thrombosis. Factors influencing the direct cost of management of venous thromboembolism were: hospital structure (p = 0.015), health insurance (p 0.001), type of pulmonary embolism (p = 0.021), and length of hospital stay (p = 0.001). Conclusion: Management of VTE is a major financial burden for our patients and this burden is influenced by the hospital structure, health insurance, type of pulmonary embolism and length of hospital stay.
文摘The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.
文摘The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.
文摘With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.
文摘Fine cost management is a systematic, refined, and dynamic management method. This paper provides us the background and meanings of fine cost management, it defines and analyzes the connotation of fine cost management in detail.
文摘Implementing effective cost management approaches has recently gained momentum due to intense competition and increasing customer demands. Moreover, effective cost management approaches have contributed to firms' competitive advantage in relation to cost leadership strategy. Consequently, firms have implemented contemporary cost management systems, such as activity-based management, business process re-engineering, life-cycle costing, target costing, and theory of constraint (TOC), to enable them to become low-cost producers and compete effectively and sustain their performance. Furthermore, focusing on cost management to improve profitability has led to the integration of activity-based costing (ABC) and TOC. Therefore, the aim of this study is to review literature and discuss how integration of ABC and TOC can result in improved and sustained cost management. While these methods have different approaches in addressing cost management, treating them as complementary cost management approaches can result in improved cost management due to improved product costing, improved cost reporting, improved product-mix decisions, and improved cycle-time management. Improvement in cost management will then result in sustained cost management. Sustained cost management is further enhanced with the investment in information customer and shareholder value technology that supports cross-functional decision making to continue creating to remain competitive in the market.
文摘The economic management of colleges and universities has always been a topic of great concern to China’s educational career,therefore,this paper will firstly make the necessary analysis of the current implementation of the economic management of colleges and universities in China,and then the reasons for the problems of economic management of colleges and universities in China is realized a detailed investigation,and finally,the economic management of colleges and universities based on capital and cost management optimization strategy is made a full discussion,looking forward to providing the necessary guidance for researchers in this field.
文摘In view of economic globalization,China’s economy has entered a stage of normalized development.In the post pandemic era,the costs of raw materials,production,sales,and labor in Chinese enterprises continue to increase,leading to severe competitive pressure among the enterprises.Therefore,it is of great theoretical and practical significance to actively apply the relevant theories of management economics to guide the cost management of Chinese enterprises,improve their economic benefits,and promote healthy and sustainable development.Currently,there are still many problems in terms of cost management in Chinese enterprises.Therefore,it is crucial to address these problems and further improve the effectiveness of cost management.This paper presents an overview of cost management and an analysis of the specific problems and provide corresponding countermeasures,in hopes of to providing a reference for cost management in enterprises and achieve the goal of stable and sustainable development of China’s economy.
文摘With the current development and progress of the socialist marketing economy, the number of the private enterprises in our country increases constantly, and the development scale has been expanded constantly, which has become an important component for China's national economy, and making a huge contribution to promote the increase of China's national economy. In order to occupy a development location among the fierce market competition and expand the market share, the private enterprises in our country make many efforts constantly, such as strengthening and promotion of the internal management concept and the management mode, etc., which really obtains an obvious achievement and progress, however, due to the restriction of the various reasons, there are still many realistic problems existing in the financial cost management for the private enterprises, which restricts the sustainable, modern and scientific development step greatly, for the method on improving the financial cost management level in China's private enterprises and the guarantee of the pertinence and the efficiency for the financial cost management measures to be implemented in the private enterprises, it becomes the key problems which needs to be solved by the private enterprises currently.
文摘This paper will be on the real estate development enterprise cost analysis and cost forecast, decision-making, plan, control, analysis and feedback were described, as well as how to use value engineering to enterprise value chain each link cost allocation, ut also to the enterprise strategy analysis and research, as well as cost management and strategic interaction analysis. Finally, it has a cost of real estate development enterprises case analysis and research. The author believes that the article will be on the real estate development enterprise management have some practical significance.
文摘In many compames, cost management models are abandoned due to their complexity and because of this, the academic literature has experienced a downturn in publications regarding cost management. This paper deepens the understanding regarding the practical usability of cost management models for purchasing decisions, and provides a framework for determining a desired complexity of cost management in different purchasing environments. The complexity is defined along three dimensions identified in literature and the different purchasing environments stem from an adaptation of Kraljic's (1983) matrix.
文摘Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget.
文摘Road transport is a flexible mode of transport and its importance in era of globalization increases. Management of road transport companies is, in this turbulent environment, exposed to many technical, legislative, and economic problems. Especially, the growing economic pressure leads to an urgent requirement of the manager and control system improvement. Activity-based costing (ABC) method is a very powerful tool to improve products, services, processes, and market strategies. ABC allows company management to understand what causes costs and how to manage them. Company under this scheme may get a glimpse of how efficiently a company converts the source value. The main objective of our research was to assess the possibility of application of the ABC method in a transport undertaking. ABC method as a fundamentally different view on the cost in the transport business helps to find the reasons of cost and thereby influences their levels to make better use of resources.. New managerial accounting methods aim to show management what information is needed, how and where this information can be obtained, and how they can be useful for the management of the company's proper planning, decision-making, and control. Information provided by management accounting is often a key factor in the analysis of alternative ways of solving problems. This article focuses on the transport enterprise management and helps to decide on the use of this method in business practice.
文摘Currently, how to further improve and perfect construction economic cost management,minimizing construction economic management cost and construction investment of the enterprise have become the important content for the daily management of construction enterprise managers. This article focuses on the construction economy under the conditions of market economy cost management, analyses related concepts and existing questions, and proposes targeted recommendations of the problem.
文摘With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.
文摘In the social development,bidding agency plays an important part,providing services for the development of construction project bidding,and endows the development of construction project bidding with a diversified characteristic.The cost management of a construction project bidding stage has a dynamic characteristic.The bidding agency can provide bidding related business for the construction enterprises to ensure the quality and the effect of the bidding service,leading to the foundation for the sustainable development of the construction enterprises.This paper analyzes the deficiency in the bidding agency,and cost management in the bidding stage of the construction projects,as well provide some effective countermeasures or recommendation,to improve the value,and the role of the bidding agency in managing and controlling the construction project cost within the scope allowed by the law,and regulations,and also to ensure the comprehensive benefits of construction projects for the construction enterprise.
文摘At present,with the rapid development of China's economy,the development of the construction industry has made a new breakthrough.Project management requires the construction industry to continuously play its role and value in improving the ability of project management.Earned value method,which is an important way in the field of project management,enables whole project management to rise to a new height.The specific principle of earned value method will be elaborated by fully introducing the specific role of earned value method in engineering projects to provide a reference and basis for practitioners to improve their management ability.
文摘BACKGROUND Coronavirus disease 2019(COVID-19)is strongly associated with an increased risk of thrombotic events,including severe outcomes such as pulmonary embolism.Elevated D-dimer levels are a critical biomarker for assessing this risk.In Gabon,early implementation of anticoagulation therapy and D-dimer testing has been crucial in managing COVID-19.This study hypothesizes that elevated Ddimer levels are linked to increased COVID-19 severity.AIM To determine the impact of D-dimer levels on COVID-19 severity and their role in guiding clinical decisions.METHODS This retrospective study analyzed COVID-19 patients admitted to two hospitals in Gabon between March 2020 and December 2023.The study included patients with confirmed COVID-19 diagnoses and available D-dimer measurements at admission.Data on demographics,clinical outcomes,D-dimer levels,and healthcare costs were collected.COVID-19 severity was classified as non-severe(outpatients)or severe(inpatients).A multivariable logistic regression model was used to assess the relationship between D-dimer levels and disease severity,with adjusted odds ratios(OR)and 95%CI.RESULTS A total of 3004 patients were included,with a mean age of 50.17 years,and the majority were female(53.43%).Elevated D-dimer levels were found in 65.81%of patients,and 57.21%of these experienced severe COVID-19.Univariate analysis showed that patients with elevated D-dimer levels had 3.33 times higher odds of severe COVID-19(OR=3.33,95%CI:2.84-3.92,P<0.001),and this association remained significant in the multivariable analysis,adjusted for age,sex,and year of collection.The financial analysis revealed a substantial burden,particularly for uninsured patients.CONCLUSION D-dimer predicts COVID-19 severity and guides treatment,but the high cost of anticoagulant therapy highlights the need for policies ensuring affordable access in resource-limited settings like Gabon.
文摘In the context of globalization and digitalization, the application of transaction cost theory in supply chain management has become increasingly important. As business environments grow more complex, enterprises face challenges in effectively managing supply chain transaction costs. This paper systematically explores the application of transaction cost theory in supply chain management, covering key areas such as supplier selection, supply chain integration, and risk management. The research finds that supplier evaluation models based on transaction costs can help enterprises make more comprehensive selection decisions. In terms of supply chain integration, transaction cost theory provides important guidance for vertical integration decisions and the design of collaboration mechanisms. The application of digital technologies has both reduced traditional transaction costs and introduced new cost considerations. Faced with emerging risks such as cybersecurity and geopolitical issues, enterprises need to adopt dynamic transaction cost management strategies. In the future, the application of transaction cost theory in supply chain management will likely place greater emphasis on interdisciplinary integration and sustainable development, providing theoretical support for enterprises to achieve efficient, flexible, and sustainable supply chain management in the changing global business environment.
文摘With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.