Saline aquifers are the most popular waste and CO_(2)injection and storage reservoirs worldwide.This project proposes that several optimal injection positions should be investigated as hydraulic pressure-focused posit...Saline aquifers are the most popular waste and CO_(2)injection and storage reservoirs worldwide.This project proposes that several optimal injection positions should be investigated as hydraulic pressure-focused positions,in order to relieve the high demands of pump performance.The comprehensive indices(F_(i))representing the injectivity of different burial depths were obtained by using information entropy,based on the mercury injection experimental data of 13 rock samples.The results demonstrated that the burial depths of No.4,No.1 and No.2 in the Liujiagou Formation were the most suitable positions for hydraulic focused injection,which means the upper 30 m thickness could be regarded as the hydraulic focused range in the saline aquifer with an average thickness of 400 m.In addition,some laboratory experiments and in situ tests were carried out for the purpose of certifying and analyzing results,including SEM,XRD,brittleness index and logging.The results suggested that the rock samples at the No.4,No.1 and No.2 burial depth ranges have loose microstructure,weak cementation,as well as dual pores and fractures.The lithology is mainly quartz and feldspar,but the clay mineral content is high(10%-25%),which is positive for dissolution.The lithology is suitable for hydraulic fracturing to form extended cracks and micro-fissures during high-TDS(total dissolved solids)mine water injection,because of the high brittleness index.Finally,a theoretical and technical framework for high-TDS mine water injection was established,based on operating pilot engineering.Some theoretical defects and drawbacks learned from the field practices were summarized and solutions proposed.The research in this study could provide guidance and a paradigm for the inexpensive treatment of high-TDS mine water by injection and storage.展开更多
The current research mainly focuses on the flow control for the two-stage proportional valve with hydraulic position feedback which is named as Valvistor valve.Essentially,the Valvistor valve is a proportional throttl...The current research mainly focuses on the flow control for the two-stage proportional valve with hydraulic position feedback which is named as Valvistor valve.Essentially,the Valvistor valve is a proportional throttle valve and the flow fluctuates with the change of load pressure.The flow fluctuation severely restricts the application of the Valvistor valve.In this paper,a novel flow control method the Valvistor valve is provided to suppress the flow fluctuation and develop a high performance proportional flow valve.The mathematical model of this valve is established and linearized.Fuzzy proportional-integral-derivative(PID)controller is adopted in the closed-loop flow control system.The feedback is obtained by the flow inference with back-propagation neural network(BPNN)based on the spool displacement in the pilot stage and the pressure differential across the main orifice.The results show that inference with BPNN can obtain the flow data fast and accurately.With the flow control method,the flow can keep at the set point when the pressure differential across the main orifice changes.The flow control method is effective and the Valvistor valve changes from proportional throttle valve to proportional flow valve.For the developed proportional flow valve,the settling time of the flow is very short when the load pressure changes abruptly.The performances of hysteresis,linearity and bandwidth are in a high range.The linear mathematical model can be verified and the assumptions in the system modeling is reasonable.展开更多
A new hydraulic actuator-hydraulic muscle (HM) is described, and the actuator's features and applications are analyzed, then a position servocontrol system in which HM is main actuator is set up. The mathematical m...A new hydraulic actuator-hydraulic muscle (HM) is described, and the actuator's features and applications are analyzed, then a position servocontrol system in which HM is main actuator is set up. The mathematical model of the system is built up and several control strategies are discussed. Based on the mathematical model, simulation research and experimental investigation with subsection PID control, neural network self-adaptive PID control and single neuron self-adaptive PID control adopted respectively are carried out, and the results indicate that compared with PID control, neural network self-adaptive PID control and single neuron self-adaptive PID control don't need controlled system's accurate model and have fast response, high control accuracy and strong robustness, they are very suitable for HM position servo control system.展开更多
基金supported by the National Key Research and Development Program of China(No.2023YFC3012103 and No.2019YFC1805400)the National Science Foundation of Jiangsu Province,China(No.BK20210524)+1 种基金the National Natural Science Foundation of China(No.42202268 and No.42172272)the Fundamental Research Funds for the Central Universities,China(No.2020ZDPY0201)。
文摘Saline aquifers are the most popular waste and CO_(2)injection and storage reservoirs worldwide.This project proposes that several optimal injection positions should be investigated as hydraulic pressure-focused positions,in order to relieve the high demands of pump performance.The comprehensive indices(F_(i))representing the injectivity of different burial depths were obtained by using information entropy,based on the mercury injection experimental data of 13 rock samples.The results demonstrated that the burial depths of No.4,No.1 and No.2 in the Liujiagou Formation were the most suitable positions for hydraulic focused injection,which means the upper 30 m thickness could be regarded as the hydraulic focused range in the saline aquifer with an average thickness of 400 m.In addition,some laboratory experiments and in situ tests were carried out for the purpose of certifying and analyzing results,including SEM,XRD,brittleness index and logging.The results suggested that the rock samples at the No.4,No.1 and No.2 burial depth ranges have loose microstructure,weak cementation,as well as dual pores and fractures.The lithology is mainly quartz and feldspar,but the clay mineral content is high(10%-25%),which is positive for dissolution.The lithology is suitable for hydraulic fracturing to form extended cracks and micro-fissures during high-TDS(total dissolved solids)mine water injection,because of the high brittleness index.Finally,a theoretical and technical framework for high-TDS mine water injection was established,based on operating pilot engineering.Some theoretical defects and drawbacks learned from the field practices were summarized and solutions proposed.The research in this study could provide guidance and a paradigm for the inexpensive treatment of high-TDS mine water by injection and storage.
基金Supported by National Natural Science Foundation of China(Grant No.51805350)Key Technologies Research and Development Program of China(Grant No.2018YFB2001202)+1 种基金Natural Science Foundation of Shanxi Province of China(Grant No.201801D221226)Postdoctoral Science Foundation of China(Grant No.2019M651073).
文摘The current research mainly focuses on the flow control for the two-stage proportional valve with hydraulic position feedback which is named as Valvistor valve.Essentially,the Valvistor valve is a proportional throttle valve and the flow fluctuates with the change of load pressure.The flow fluctuation severely restricts the application of the Valvistor valve.In this paper,a novel flow control method the Valvistor valve is provided to suppress the flow fluctuation and develop a high performance proportional flow valve.The mathematical model of this valve is established and linearized.Fuzzy proportional-integral-derivative(PID)controller is adopted in the closed-loop flow control system.The feedback is obtained by the flow inference with back-propagation neural network(BPNN)based on the spool displacement in the pilot stage and the pressure differential across the main orifice.The results show that inference with BPNN can obtain the flow data fast and accurately.With the flow control method,the flow can keep at the set point when the pressure differential across the main orifice changes.The flow control method is effective and the Valvistor valve changes from proportional throttle valve to proportional flow valve.For the developed proportional flow valve,the settling time of the flow is very short when the load pressure changes abruptly.The performances of hysteresis,linearity and bandwidth are in a high range.The linear mathematical model can be verified and the assumptions in the system modeling is reasonable.
文摘A new hydraulic actuator-hydraulic muscle (HM) is described, and the actuator's features and applications are analyzed, then a position servocontrol system in which HM is main actuator is set up. The mathematical model of the system is built up and several control strategies are discussed. Based on the mathematical model, simulation research and experimental investigation with subsection PID control, neural network self-adaptive PID control and single neuron self-adaptive PID control adopted respectively are carried out, and the results indicate that compared with PID control, neural network self-adaptive PID control and single neuron self-adaptive PID control don't need controlled system's accurate model and have fast response, high control accuracy and strong robustness, they are very suitable for HM position servo control system.