期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Dynamic Risk Assessment Index System for Earth-Rock Dam during Construction
1
作者 葛巍 李宗坤 +1 位作者 李巍 赵梦蝶 《Journal of Donghua University(English Edition)》 EI CAS 2015年第6期923-926,共4页
During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progres... During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable. 展开更多
关键词 hydraulic structure construction of earth-rock dam assessment index risk path construction goal
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部