期刊文献+
共找到1,779篇文章
< 1 2 89 >
每页显示 20 50 100
Carbon Footprint in Waste Sector of Hydropower Plant: A Case Study of Nam Theun 2 Hydropower Plant
1
作者 Souttiphong Keovongsa Keophousone Phonhalath Sengthavy Phommixay 《American Journal of Climate Change》 2024年第2期209-229,共21页
While hydropower is generally considered a clean energy source, it is important to recognize that their waste can still contribute to greenhouse gas emissions (GHG). The purpose of this study is to assess the carbon f... While hydropower is generally considered a clean energy source, it is important to recognize that their waste can still contribute to greenhouse gas emissions (GHG). The purpose of this study is to assess the carbon footprint associated with the waste sector throughout the operational phase of the Nam Theun 2 hydropower plant in Laos. Understanding the environmental impact of the waste sector is crucial for ensuring the plant’s sustainability. This study utilizes the theoretical estimation method recommended in the 2019 Refinement to the 2006 IPCC Guidelines for National Greenhouse Gas Inventories, as well as the Requirements for Specification with guidance at the organization level for quantification and reporting of GHG emissions and removals. We emphasize the significance of implementing sustainable waste management practices to reduce GHG emissions and minimize the environmental impact of hydropower operations. By conducting a comprehensive analysis, this paper also provides insights into the environmental implications of waste management in hydropower plants and identifies strategies to mitigate the carbon footprint in the waste sector. The findings contribute to a better understanding of the environmental sustainability of hydropower plants and provide valuable guidance for policymakers, energy producers, and environmental practitioners involved in hydropower plant design and operation. 展开更多
关键词 Waste Sector Carbon Footprint Climate Change hydropower plant
下载PDF
Modelling and Optimization of Hydroelectric Power Plants in Cameroon for the Development of the Green Energy Market in Neighboring Countries Using Homer Software
2
作者 Bachirou Bogno Michel Aillerie +1 位作者 Kitmo   Dieudonné Kidmo Kaoga 《Smart Grid and Renewable Energy》 2024年第10期248-265,共18页
Renewable energy is increasingly in demand for a variety of applications in both urban and rural areas. There are, however, a number of implementation constraints in some countries, even though sunshine, wind and wate... Renewable energy is increasingly in demand for a variety of applications in both urban and rural areas. There are, however, a number of implementation constraints in some countries, even though sunshine, wind and water are abundant and available. As part of this research, we are carrying out a technical and economic study on the availability of renewable energy in Cameroon, with a view to combining several sources of solar, biomass, wind and hydroelectric power to meet energy demand both inside and outside the country, in countries such as Chad, Gabon and Nigeria. In this work, the implementation of the entire system in the HOMER software demonstrates the feasibility and possibility of implementing a multi-source power plant based on renewable energies. Calculation of the levelized cost of energy (LCOE) and the net present cost (NPC) shows that a capacity of 485 GW can meet the energy demand of the countries bordering Cameroon. Furthermore, the calculation of the performance ratio gives a PR = 46.52 and a Capacity factor of CF = 11.64. The system is profitable not only economically but also environmentally, as it reduces greenhouse gas emissions and energy losses. 展开更多
关键词 Wind plant PV plant hydropower HOMER Renewable Energy
下载PDF
Load Frequency Control of Small Hydropower Plants Using One-Input Fuzzy PI Controller with Linear and Non-Linear Plant Model 被引量:2
3
作者 Derek Ajesam Asoh Edwin Nyuysever Mbinkar Albert Nouck Moutlen 《Smart Grid and Renewable Energy》 2022年第1期1-16,共16页
<span style="font-family:Verdana;">This study presents an intelligent approach for load frequency control (LFC) of small hydropower plants (SHPs). The approach which is based on fuzzy logic (FL), takes... <span style="font-family:Verdana;">This study presents an intelligent approach for load frequency control (LFC) of small hydropower plants (SHPs). The approach which is based on fuzzy logic (FL), takes into account the non-linearity of SHPs—something which is not possible using traditional controllers. Most intelligent methods use two-</span><span style="font-family:;" "=""> </span><span style="font-family:;" "=""><span style="font-family:Verdana;">input fuzzy controllers, but because such controllers are expensive, there is </span><span style="font-family:Verdana;">economic interest in the relatively cheaper single-input controllers. A n</span><span style="font-family:Verdana;">on-</span></span><span style="font-family:;" "=""> </span><span style="font-family:Verdana;">linear control model based on one-input fuzzy logic PI (FLPI) controller was developed and applied to control the non-linear SHP. Using MATLAB/Si</span><span style="font-family:Verdana;">- </span><span style="font-family:Verdana;">mulink SimScape, the SHP was simulated with linear and non-linear plant models. The performance of the FLPI controller was investigated and compared with that of the conventional PI/PID controller. Results show that the settling time for the FLPI controller is about 8 times shorter;while the overshoot is about 15 times smaller compared to the conventional PI/PID controller. Therefore, the FLPI controller performs better than the conventional PI/PID controller not only in meeting the LFC control objective but also in ensuring increased dynamic stability of SHPs.</span> 展开更多
关键词 Small hydropower plant Linear and Non-Linear Model Load Frequency Control Non-Linear Control Fuzzy Logic Controller Renewable Energy
下载PDF
Experimental study on dynamic pipe fracture in consideration of hydropower plant model
4
作者 Kazumi ISHIKAWA Yukio KONO +2 位作者 Akira HAGA Kazuo KATO Kota SUGAWARA 《Water Science and Engineering》 EI CAS 2009年第4期60-68,共9页
In the case of sudden valve closure, water hammer creates the most powerful pressure and damage to pipeline systems. The best way to protect the pipeline system is to eliminate water hammer. The main reasons for water... In the case of sudden valve closure, water hammer creates the most powerful pressure and damage to pipeline systems. The best way to protect the pipeline system is to eliminate water hammer. The main reasons for water hammer occurrence are valve closure, high initial velocity, and static pressure. However, it is difficult to eliminate water hammer. Water hammer tends to occur when the valve is being closed. In this study, the pipe fracture caused by static water pressure, gradually increasing pressure, and suddenly increasing pressure were compared experimentally in a breaking PVC test pipe. The quasi-static zone, the dynamic zone, and the transition zone are defined through the results of those experiments, with consideration of the fracture patterns of test pipes and impulses. The maximum pressure results were used to design the pipeline even though it is in the dynamic zone. 展开更多
关键词 hydropower plant dynamic pipe fracture pipeline IMPULSE water hammer
下载PDF
Performance Evaluation of Sediment Basins: Case Study of Keya Hydropower Plant in Rwanda
5
作者 Omar Munyaneza Félicien Majoro +1 位作者 Sylvain Mutake Emmanuel Hagenimana 《Journal of Water Resource and Protection》 2015年第16期1387-1398,共12页
Keya Hydropower Plant (HPP) is a run-off-river plant which can be an effective green solution contributing to the current energy demand in Rwanda but a huge amount of sediment contained in water of Sebeya River on whi... Keya Hydropower Plant (HPP) is a run-off-river plant which can be an effective green solution contributing to the current energy demand in Rwanda but a huge amount of sediment contained in water of Sebeya River on which this plant is built results in loss of the plant capacity. The aim of this study was to conduct the performance evaluation of Keya HPP sediment basin located in Rubavu district, western province of Rwanda. Specifically, laboratory tests of sediment, efficiency of the basin, assessment of sedimentation problems on HPP operations, proposition of technical options for increasing the removal efficiency of sediment basin and other options for reducing sediment at the source of generation were performed using different methods including interviews and questioning Keya hydropower technicians, field sediment sampling followed by hydrometer and Particle Size Distribution (PSD) analysis. Analysis was made in University of Rwanda (UR) Soil Mechanics laboratory. MICROSOFT EXCEL and Graphisoft Archicad 18 softwares with Massachusetts Institute of Technology (MIT) soil classification were used as data analysis tools. Results showed that the overall efficiency removal of the diversion headwork was 85%. However, after comparing sediment concentration at the inlet and outlet of the sediment basin, it was found that the basin removed only 22% of sediment from diverted water toward the turbine. This means that 78% of sediment escapes the basin to cause erosion on the turbine components resulting in reduction of the plant capacity from 2.2 MW to 900 KW. To ensure sustainable solution to sediment issues in Keya HPP, an upstream sediment trap reservoir is proposed. It is recommended also that Rwanda Energy Group (REG) should work together with Rwanda Natural Resource Authority (RNRA) at national level to ensure sustainable development of erosion control in the Sebeya catchment area. 展开更多
关键词 Keya hydropower plant SEDIMENT BASIN Evaluation Sebeya RIVER Rwanda
下载PDF
Environmental and Social Impacts of Mini-hydropower Plants--A Case Study from Sri Lanka
6
作者 Prasad G. Senarath Bhabishya Khaniya +2 位作者 Nilushi Baduge Hazi Md. Azamathulla Upaka Rathnayake 《Journal of Civil Engineering and Architecture》 2017年第12期1130-1139,共10页
This research study was conducted to review the environmental and social impact of mini hydropower plants (run-of-the-river type) by selecting Denawaka Ganga mini hydropower plant, which is located in Ratnapura dist... This research study was conducted to review the environmental and social impact of mini hydropower plants (run-of-the-river type) by selecting Denawaka Ganga mini hydropower plant, which is located in Ratnapura district, Sri Lanka. Field visits and discussions among the authors, authorities and the residents were carried out. Then, the environmental and social impacts were scientifically analysed using regulation degree (RD) and environmental impact value (EIV) scores. It was found out that the Denawaka Ganga mini hydropower plant has induced some environmental concerns; however, significant positive social impact to the society. This is in addition to the green energy generation. Therefore, it can be concluded herein that the Denawaka Ganga mini hydropower is an asset to the country, Sri Lanka. 展开更多
关键词 Denawaka Ganga hydropower plant environmental impact value mini hydropower plants regulation degree social impacts.
下载PDF
Implementing a model for identifying organizational complications for the purpose of increasing productivity in hydropower plant
7
作者 Seyede Zahra Erfani Seyed Masood Taghvaee +1 位作者 Farbod Estiri Farzad Ramin 《Chinese Business Review》 2010年第11期40-47,共8页
The present economical conditions on today's world require specific point of view and policy making in business agencies. In this competitive world to achieve competence, competitive advantages in order to better gov... The present economical conditions on today's world require specific point of view and policy making in business agencies. In this competitive world to achieve competence, competitive advantages in order to better governance, organizations have to increase their competitive powers through promotion and productivity. One of the fundamental approaches to elevate the productivity level is finding the complications and obstacles, and arise planning to remove them. In order to understand organizational complication, we have tried to take critical factors of success and continue improvement into consideration to demonstrate a model to find the main and radical problems and complications and recognize the recoverable areas in the business agencies. In order to verify and validate the performed research, he planned model has been accomplished in the Hydropower Plant Department, positive and acceptable results were obtained and organizations total factor productivity improvement was achieved which was appreciated by the organization. 展开更多
关键词 PRODUCTIVITY critical factors of success continues improvement organizational complication hydropower plant
下载PDF
Current Situation and Prospect of Pumped-Storage Hydropower Plant in China
8
作者 Wang Nan State Power Economic Research Institute 《Electricity》 2008年第2期49-51,共3页
With the rapid development of national economy in China, pumped-storage power plant(PSPP) has developed very fast for its special stable and dynamic benefits in recent years.Because of the ever-increasing power load a... With the rapid development of national economy in China, pumped-storage power plant(PSPP) has developed very fast for its special stable and dynamic benefits in recent years.Because of the ever-increasing power load and its peak-to-valley ratio, customers have higherexpectation for the securityand quality ofpower supply. PSPPs are playing a role in load regulation,energy saving and reliable operation of power girds with its unique peak-shifting character. 展开更多
关键词 PSPP Current Situation and Prospect of Pumped-Storage hydropower plant in China
下载PDF
Quali-Quantitative Analysis of Brazilian Environmental Licensing of Hydropower Plants
9
作者 Fabio Giusti Azevedo de Britto Jose Paulo Soares de Azevedo +3 位作者 Cynara Alets Sthuasth Souza de Melo Franca Rodrigo Cunha Wanick Leandro Andrei Beser de Deus Marcos Aurelio Vasconcelos de Freitas 《International Journal of Geosciences》 2015年第7期692-704,共13页
The use of the extraordinary hydroelectric potential of the Amazon Basin originated an increase in the offer of renewable energy in Brazil, which, in its turn, leads to conflicts and a lack of consensus among differen... The use of the extraordinary hydroelectric potential of the Amazon Basin originated an increase in the offer of renewable energy in Brazil, which, in its turn, leads to conflicts and a lack of consensus among different players owing to the potential negative impacts related to the construction and operation of large hydroelectric power plants in relatively well preserved areas. In this context, environmental licensing is one of the national environmental policy’s main instruments for making decisions regarding the use of the hydroelectric potential, especially the rivers of the Amazon Basin. Nevertheless, this significant instrument has its limitations and requires adjustments in order to better aid the decision making process regarding the use of water resources and land with the goal of increasing the offer of electric energy. 展开更多
关键词 Expansion of Renewable Energy Environmental Licensing hydropower plants ENERGY
下载PDF
A Study on Importance and Role of Irrigation and Hydropower Plant Operation in Integrated River Basin Management
10
作者 Cengiz Koc 《Computational Water, Energy, and Environmental Engineering》 2017年第1期1-10,共10页
In this study, 16 irrigation schemes (Baklan, Irgilli, Sutlac, Cal, Cürüksu, Nazilli, Saraykoy, Pamukkale, Sultanhisar, Akcay, Aydin, Topcam, Karpuzlu, Isikli, Gümüssu ve Soke) having 166,381 hecta... In this study, 16 irrigation schemes (Baklan, Irgilli, Sutlac, Cal, Cürüksu, Nazilli, Saraykoy, Pamukkale, Sultanhisar, Akcay, Aydin, Topcam, Karpuzlu, Isikli, Gümüssu ve Soke) having 166,381 hectares, built by State Hydraulic Works (DSI), and operated by participatory irrigation managements, and 14 hydroelectric power plants (HPP) operated and built on dams, canals and rivers by the public and private sectors are examined in the Büyük Menderes basin which is an important basin in terms of the agriculture, energy and ecology projects. Integrated basin management practices and the importance and role of irrigation and hydropower plant operation in integrated basin management, how it should be, optimal use of available water resources for irrigation and hydroelectric power plant operation, irrigation relationship with canal hydropower plants, operated under integrated basin management of irrigation and hydropower plants, environment and the ecological effects have been studied, and integrated basin management with the existing basin management conditions in terms of hydropower plant and irrigation operation on the basis of data of 2015 have been compared, reached important conclusions, and made recommendations on the subject. 展开更多
关键词 hydropower plant Irrigation Integrated Basin Management Operation Buyuk Menderes Basin TURKEY
下载PDF
混合式抽水蓄能电站群容量计算研究Ⅰ:短期调峰特征与梯级开发增益 被引量:1
11
作者 郭爱军 畅建霞 +2 位作者 王义民 王学斌 孙骁强 《水利学报》 EI CSCD 北大核心 2024年第7期768-779,共12页
依托常规梯级水电站修建混合式抽水蓄能电站(简称混蓄电站)成为提升电力系统调峰能力的重要途径。混蓄电站即可抽水又可发电的典型运行方式增加了水电基地的灵活性调节能力,为此亟需研究其运行方式以及与原有梯级水电站运行方式间的互... 依托常规梯级水电站修建混合式抽水蓄能电站(简称混蓄电站)成为提升电力系统调峰能力的重要途径。混蓄电站即可抽水又可发电的典型运行方式增加了水电基地的灵活性调节能力,为此亟需研究其运行方式以及与原有梯级水电站运行方式间的互馈关系。研究以黄河上游待开发龙羊峡-拉西瓦、拉西瓦-尼那混蓄电站为对象,建立含混蓄电站的梯级水电站短期联合调峰优化模型,分析混蓄电站对原有梯级水电站运行方式的影响,基于理论推导与数值计算两种方法揭示混蓄电站调峰效果的变化特征。主要结论如下:(1)混蓄电站抽水水量经由原有梯级水电站机组下泄,使得非填谷时段原有水电站出力增加,水电站上旋备容量降低;(2)龙羊峡水电站满发流量相对较小、拉西瓦水库调节库容较小以及日综合利用供水流量过大是制约混蓄电站调峰效果的主要因素,发现了综合利用流量影响混蓄电站调峰效果的临界特性,并提出了临界综合利用流量的计算公式;(3)发现并量化了混蓄电站梯级开发模式较单一开发模式所带来的梯级抽水调峰增益现象,并揭示了梯级抽水调峰增益背后所蕴含的“河流梯级反向再造”内在机理。 展开更多
关键词 混蓄电站群 临界调峰特征 梯级开发增益 黄河流域
下载PDF
乌东德水电站日调峰对下游裂腹鱼类栖息地的影响
12
作者 曹俊 陈小娟 +2 位作者 卢晶莹 邓鑫欣 陶江平 《水生态学杂志》 CSCD 北大核心 2024年第1期87-95,共9页
日调峰是乌东德水电站日常运行的主要出力约束和调度目标。为了探讨电站调度引起的出库流量大幅涨落对下游生态环境的不利影响,采用河道内流量增量法,通过构建二维水动力模型,研究了乌东德水电站日调峰引起的下游河段水文水动力条件波... 日调峰是乌东德水电站日常运行的主要出力约束和调度目标。为了探讨电站调度引起的出库流量大幅涨落对下游生态环境的不利影响,采用河道内流量增量法,通过构建二维水动力模型,研究了乌东德水电站日调峰引起的下游河段水文水动力条件波动对裂腹鱼类繁殖期栖息地适宜性的影响,并分析了2023年电站基荷发电生态调度试验效果。结果表明,乌东德电站下泄流量低于1160 m^(3)/s,坝下江段裂腹鱼类潜在产卵场面积相对较大;流量高于2000 m^(3)/s,裂腹鱼类潜在的产卵场面积显著减少。电站日调峰结束时,出库流量降幅越大,裂腹鱼类潜在产卵场脱水面积及鱼卵脱水风险越大。乌东德电站基荷发电生态调度期间,坝下江段裂腹鱼类潜在产卵场的加权面积有所减少,但潜在产卵场和鱼卵早期的脱水风险显著降低。为提高繁殖期裂腹鱼类生境适宜性和持续性,有必要进一步减少电站日调峰频率,降低出库流量至适宜区间。 展开更多
关键词 裂腹鱼类 日调峰 生态调度 生态流量 乌东德电站
下载PDF
混合式抽水蓄能电站群容量计算研究Ⅱ:多尺度嵌套容量计算模型及实例
13
作者 郭爱军 畅建霞 +2 位作者 王义民 王学斌 孙骁强 《水利学报》 EI CSCD 北大核心 2024年第8期898-907,共10页
基于流域梯级水电站增建混合式抽水蓄能电站(简称混蓄电站),对保障新型电力系统安全稳定运行、促进新能源大规模发展和消纳具有重要意义。研究提出基于多尺度嵌套调度模型的混蓄电站群容量计算模型,该模型嵌套含混蓄电站的梯级水电站短... 基于流域梯级水电站增建混合式抽水蓄能电站(简称混蓄电站),对保障新型电力系统安全稳定运行、促进新能源大规模发展和消纳具有重要意义。研究提出基于多尺度嵌套调度模型的混蓄电站群容量计算模型,该模型嵌套含混蓄电站的梯级水电站短期调峰模型、考虑短期调峰与综合利用供水任务的梯级水电站中长期优化调度模型两大核心模块;此外,针对该容量计算模型的高维特征,提出基于代理模型思想的求解方法。以黄河上游待规划的大型混蓄电站群为实例,分别计算混蓄电站单独开发、梯级开发、整体开发三种模式下电站装机容量以及抽水调峰效益,并推导理论公式揭示混蓄电站抽发循环效率及抽水时长对电站装机容量的影响机制。实例计算取得的结果:龙羊峡-拉西瓦混蓄电站推荐采用水泵机组+可逆式抽蓄机组形式开发,单独开发模式下,推荐装机160万kW;当其与拉西瓦-尼那混蓄电站梯级开发时,推荐装机205万kW。当混蓄电站设计抽水时长减小时,其装机容量可增加,调峰能力变大,但电站抽水耗电调峰效益不变。拉西瓦-尼那、李家峡-直岗拉卡、公伯峡-苏只混蓄电站推荐装机分别为75万、16万和59万kW。4座混蓄电站整体开发模式下,可用于新能源消纳的抽水调峰电量为年均87.42亿kWh。 展开更多
关键词 混蓄电站群 容量计算模型 多尺度嵌套调度 黄河流域
下载PDF
水库和水电站工程建设对陆栖脊椎动物的影响
14
作者 夏霖 许玉 +2 位作者 程继龙 陈国亮 杨奇森 《环境影响评价》 2024年第5期1-7,共7页
水库和水电站工程建设在很多国家已经成为导致生物多样性丧失的人为因素之一。其致使动物栖息地丧失和片段化,造成一系列负面生态效应,包括生物多样性丧失、种群破碎化、动物群落结构改变、边缘效应、生态竞争加剧、外来物种入侵等。大... 水库和水电站工程建设在很多国家已经成为导致生物多样性丧失的人为因素之一。其致使动物栖息地丧失和片段化,造成一系列负面生态效应,包括生物多样性丧失、种群破碎化、动物群落结构改变、边缘效应、生态竞争加剧、外来物种入侵等。大型水坝还会阻碍河狸(Castor fiber)、水獭(Lutra lutra)等半水生哺乳动物的季节性迁移和扩散,在水库蓄水过程中亦可能淹没栖息地,造成动物被困和溺水死亡。鉴于此,本文梳理了自1970年以来国内外发表的相关研究案例,归纳了缓解水库对陆栖脊椎动物生态影响的措施,包括在库区周边及上下游目标物种的适宜栖息地范围建立严格保护区域,在专业指导下用科学的方法对动物加以救助和转移,在水库淹没区建设大型的陆桥岛屿以维持更高的动物多样性,利用连续的小型岛屿设置“水上动物通道”等,以期为未来水库和水电站工程建设中的野生动物保护措施和环境影响评价、监测工作提供理论支撑。 展开更多
关键词 水库 水电站 大坝 陆栖脊椎动物 生物多样性
下载PDF
多能互补发电系统故障识别与测距方法
15
作者 刘婷 罗皓鹏 +2 位作者 王斌 吴凤娇 徐哲熙 《科学技术与工程》 北大核心 2024年第6期2405-2413,共9页
随着大量新能源的接入,使得多端柔性直流系统(modular multilevel converter based multi-terminal direct current, MMC-MTDC)故障特征愈加复杂,快速准确的故障识别与测距是亟需解决的关键难题之一。为此,提出了一种风-光-储-蓄互补发... 随着大量新能源的接入,使得多端柔性直流系统(modular multilevel converter based multi-terminal direct current, MMC-MTDC)故障特征愈加复杂,快速准确的故障识别与测距是亟需解决的关键难题之一。为此,提出了一种风-光-储-蓄互补发电站经柔性直流输电外送系统故障识别与测距方法。首先,搭建风-光-储-蓄互补发电站经柔直外送系统,在此基础上,提出了一种Teager能量算子能量熵的新方法,利用测量点正负极Teager能量算子能量熵的比值构建故障选极及区段识别判据。接着,针对已识别的故障线路,提出变分模态分解(variational mode decomposition, VMD)与Teager能量算子(teager energy operator, TEO)相结合的故障测距方法。最后,利用PSCAD/EMTDC进行仿真,结果表明所提识别方法可以准确判断故障所在线路,所提测距方法能在故障发生2 ms时间窗内实现故障测距,误差率不超过2.55%,并具有较高的耐过渡电阻能力。 展开更多
关键词 多端柔性直流系统 风-光-储-蓄互补发电站 Teager能量算子能量熵 故障识别 故障测距
下载PDF
不同生态流量需求下雅砻江中下游梯级电站联合优化调度
16
作者 俞雷 张陆陈 +2 位作者 骆少泽 吴修锋 吴时强 《水利水运工程学报》 CSCD 北大核心 2024年第1期68-76,共9页
为协同雅砻江干流水力发电与河道生态流量需求,以中下游7座电站为研究对象,进行不同生态流量需求下雅砻江中下游梯级电站联合优化调度。基于改进型可变月径流法,计算了雅砻江主要生态控制断面最小、适宜及最佳生态流量过程;构建了以梯... 为协同雅砻江干流水力发电与河道生态流量需求,以中下游7座电站为研究对象,进行不同生态流量需求下雅砻江中下游梯级电站联合优化调度。基于改进型可变月径流法,计算了雅砻江主要生态控制断面最小、适宜及最佳生态流量过程;构建了以梯级发电量最大化为目标的雅砻江中下游梯级电站联合优化调度模型,并用遗传算法对其求解。结果表明:(1)随河道生态流量需求的提高,梯级电站发电效益和水资源利用效率均下降,其中锦屏二级电站发电量下降最为显著;(2)梯级电站保障发电效益正常发挥的同时,实施联合优化调度,其下游河道能维持更高层次的生态流量,一定程度缓解了流域水能开发利用与河道生态保护间的关系。 展开更多
关键词 生态调度 联合优化调度 梯级电站 生态流量 雅砻江中下游
下载PDF
梯级水电开发背景下的外来植物入侵状况与防控管理--以澜沧江流域(云南段)为例
17
作者 温静雅 李世刚 +4 位作者 彭李 葛德祥 朱绍隆 杨艳 王焕冲 《环境影响评价》 2024年第5期8-16,共9页
梯级水电开发是一种有效的可再生能源生产方式,但梯级水电开发与外来生物入侵之间的关系尚未得到足够重视。本文基于对澜沧江流域(云南段)梯级水电开发区的野外实地调查和数据搜集整理,查明了区域的外来入侵植物种类和分布状况,初步分... 梯级水电开发是一种有效的可再生能源生产方式,但梯级水电开发与外来生物入侵之间的关系尚未得到足够重视。本文基于对澜沧江流域(云南段)梯级水电开发区的野外实地调查和数据搜集整理,查明了区域的外来入侵植物种类和分布状况,初步分析和探讨了梯级水电开发与外来植物入侵之间的相互关系。研究结果显示,澜沧江流域(云南段)共发现外来入侵植物202种,隶属51科和146属,其中来源于美洲的植物最多(126种,52.07%),草本入侵植物(71.78%)占主导,且大多入侵植物通过有意引入(76.23%)而来。风险评估显示,菊科、豆科和大戟科的植物对生态影响最为显著。在空间分布上,入侵植物的富集区域和生态危害严重区与水电开发区高度重合。现有证据尚不能证明水电开发直接导致了新入侵植物的增加,但确实在一定程度上促进了外来入侵植物在区域内的引入与扩散。同时,本文还针对性地提出了水电开发建设与运行中防控外来入侵植物的具体建议。 展开更多
关键词 梯级水电开发 澜沧江流域 外来入侵植物 生态管理 防控策略
下载PDF
基于逆向学习的水电厂现场作业风险预警模型研究 被引量:1
18
作者 陈阳 华维 曹志金 《中国农村水利水电》 北大核心 2024年第1期257-261,共5页
以保障水电厂现场作业安全为目的,研究基于逆向学习的水电厂现场作业风险预警模型。从公共风险、机组器械系统设备风险、电气系统设备风险与水工建筑风险四类风险出发选取指标构建水电厂现场作业风险预警指标体系。采用基于逆向学习传... 以保障水电厂现场作业安全为目的,研究基于逆向学习的水电厂现场作业风险预警模型。从公共风险、机组器械系统设备风险、电气系统设备风险与水工建筑风险四类风险出发选取指标构建水电厂现场作业风险预警指标体系。采用基于逆向学习传感系统,基于传感器输入样本点与期望输出值组成的线性表反演测量点位置,获取准确的风险预警指标数据。利用LSTM神经网络构建风险预警模型,将预警指标数据作为模型输入,将风险预警等级作为模型输出,通过传播路径实施反向输出比对,优化不同权重矩阵与偏差,由此获取水电厂现场作业风险预警结果。同时利用基于逆向学习行为粒子子群算法优化预警模型参数,提升模型预警精度。实验结果显示该模型能够准确预警水电厂现场作业风险,保障现场作业的安全性。 展开更多
关键词 逆向学习 水电厂 现场作业 风险预警 指标数据采集 神经网络
下载PDF
基于视频智能分析的水电厂人员不安全行为自动化检测系统 被引量:1
19
作者 宋刚伟 袁璞 +1 位作者 石静涛 聂磊 《自动化与仪表》 2024年第5期113-116,142,共5页
为保证水电厂的生产生活安全,该文提出基于视频智能分析的水电厂人员不安全行为自动化检测系统。摄像机模块采集区域内视频并发送给资源模块;资源模块存储以及传输数据;自动检测模块获取由资源模块传输的视频两帧间的人员行为前景图像,... 为保证水电厂的生产生活安全,该文提出基于视频智能分析的水电厂人员不安全行为自动化检测系统。摄像机模块采集区域内视频并发送给资源模块;资源模块存储以及传输数据;自动检测模块获取由资源模块传输的视频两帧间的人员行为前景图像,将其输入至深度置信网络中,输出人员行为安全性判断结果,并返回至资源模块;若检测模块检测到不安全行为,资源模块会将不安全信号传递给报警模块发出报警。通过实验可知,该方法获取的视频采集结果细节全面、清晰,提取的人员行为前景图像的交并比高,可实现人员不安全行为准确检测。 展开更多
关键词 视频分析 水电厂 不安全行为 自动化检测 高清摄像头 帧差法
下载PDF
基于熵权-TOPSIS的水电厂桥式起重机综合多轨迹规划控制策略
20
作者 陈铁华 许明 +2 位作者 吴广新 杨智文 刘馨泽 《水力发电》 CAS 2024年第8期65-73,共9页
水电厂桥式起重机负载大,制动时加速度变化和惯性摆动会导致桥机定位精度低,对此,提出了基于熵权-TOPSIS评价方法的综合多轨迹控制策略,应用于桥式起重机行走过程控制。通过Matlab仿真获得桥机4种行走轨迹曲线,将4种轨迹曲线和桥机模型... 水电厂桥式起重机负载大,制动时加速度变化和惯性摆动会导致桥机定位精度低,对此,提出了基于熵权-TOPSIS评价方法的综合多轨迹控制策略,应用于桥式起重机行走过程控制。通过Matlab仿真获得桥机4种行走轨迹曲线,将4种轨迹曲线和桥机模型导入到Adams运动仿真平台,由仿真结果构建轨迹评价指标体系,基于熵权-TOPSIS评价方法对不同位移下的桥机行走轨迹规划算法进行综合评分。评分结果表明,不同轨迹算法在不同位移条件下运动特性不同。因此,在桥机行走控制过程中,可根据桥机行走距离的不同选择不同的轨迹曲线,相比于单一轨迹曲线控制,多轨迹规划控制可有效提高水电厂桥机定位精度以及大部件吊装的安全性。 展开更多
关键词 水电厂桥机 轨迹规划 轨迹评价 熵权-TOPSIS 多轨迹控制 ADAMS仿真
下载PDF
上一页 1 2 89 下一页 到第
使用帮助 返回顶部