This study delves into the effects of shield tunneling in complex coastal strata, focusing on how this constructionmethod impacts surface settlement, the mechanical properties of adjacent rock, and the deformation of ...This study delves into the effects of shield tunneling in complex coastal strata, focusing on how this constructionmethod impacts surface settlement, the mechanical properties of adjacent rock, and the deformation of tunnelsegments. It investigates the impact of shield construction on surface settlement, mechanical characteristics ofnearby rock, and segment deformation in complex coastal strata susceptible to construction disturbances. Utilizingthe Fuzhou Binhai express line as a case study, we developed a comprehensive numerical model using theABAQUS finite element software. The model incorporates factors such as face force, grouting pressure, jack force,and cutterhead torque. Its accuracy is validated against field monitoring data from engineering projects. Simulationswere conducted to analyze ground settlement and mechanical changes in adjacent rock and segments acrossfive soil layers. The results indicate that disturbances are most significant near the excavation zone of the shieldmachine, with a prominent settlement trough forming and stabilizing around 2.0–3.0 D from the excavation. Theexcavation face compresses the soil, inducing lateral expansion. As grouting pressure decreases, the segmentexperiences upward buoyancy. In mixed strata, softer layers witness increased cutting, intensifying disturbancesbut reducing segment floatation. These findings offer valuable insights for predicting settlements, ensuring segmentand rock safety, and optimizing tunneling parameters.展开更多
Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using th...Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation.展开更多
The prediction of embankment settlement is a critically important issue for the serviceability of subgrade projects,especially the post-construction settlement.A number of methods have been proposed to predict embankm...The prediction of embankment settlement is a critically important issue for the serviceability of subgrade projects,especially the post-construction settlement.A number of methods have been proposed to predict embankment settlement;however,all of these methods are based on a parameter,i.e.the initial time point.The difference of the initial time point determined by different designers can de?nitely induce errors in prediction of embankment settlement.This paper proposed a concept named"potential settlement"and a simpli?ed method based on the in situ data.The key parameter"b"in the proposed method was veri?ed using theoretical method and?eld data.Finally,an example was used to demonstrate the advantages of the proposed method by comparing with other methods and the observation data.展开更多
The characteristics of high-filled embankment rheological settlement were analyzed;mechanical calculation model of high-filled embankment rheological settlement during constructing and running period was also put forw...The characteristics of high-filled embankment rheological settlement were analyzed;mechanical calculation model of high-filled embankment rheological settlement during constructing and running period was also put forward.Combining the macroscopic and microscopic deformation properties of the engineering soil grain,its constitutive model was set up and its characters were fully revealed,at the same time,its practical calculation formula under the action of dead-weight load was derived,which is feasible by analysis and comparison.展开更多
To study calculating method of settlement on top of extra-long large-diameter pile, the relevant research results were summarized. The hyperbola model, a nonlinear load transfer function, was introduced to establish t...To study calculating method of settlement on top of extra-long large-diameter pile, the relevant research results were summarized. The hyperbola model, a nonlinear load transfer function, was introduced to establish the basic differential equation with load transfer method. Assumed that the displacement of pile shaft was the high order power series of buried depth, through merging the same orthometric items and arranging the relevant coefficients, the solution which could take the nonlinear pile-soil interaction and stratum properties of soil into account was solved by power series. On the basis of the solution, by determining the load transfer depth with criterion of settlement on pile tip, the method by making boundary conditions compatible was advised to solve the load-settlement curve of pile. The relevant flow chart and mathematic expressions of boundary conditions were also listed. Lastly, the load transfer methods based on both two-broken-line model and hyperbola model were applied to analyzing a real project. The related coefficients of fitting curves by hyperbola were not less than 0.96, which shows that the hyperbola model is truthfulness, and is propitious to avoid personal error. The calculating value of load-settlement curve agrees well with the measured one, which indicates that it can be applied in engineering practice and making the theory that limits the design bearing capacity by settlement on pile top comes true.展开更多
An active application of a concrete track is expected for the future construction of railroads. For successful concrete track construction and operation in earthwork areas, the residual settlement should be reasonably...An active application of a concrete track is expected for the future construction of railroads. For successful concrete track construction and operation in earthwork areas, the residual settlement should be reasonably controlled by using an appro- priate method. The maintenance for excessive settlement is very difficult on the operating line because the maintenance method is very restrictive. The objective of this study is to introduce pressurized rapid-hardening cement grouting (PRCG) method to restore a subsided concrete track without any adverse effects on train operation. This method involves the use of special types of materials (very quick hardening and middle-hardening mortar), compact grouting equipment, and a special construction process. In spite of the extremely restrictive environment, this method has been demonstrated to be very effective and reasonable through laboratory and field tests.展开更多
Large cross-section tunnel construction induces ground surface settlements, potentially endangering both subterranean projects and nearby above-ground structures. A novel tunnel construction method, known as the suspe...Large cross-section tunnel construction induces ground surface settlements, potentially endangering both subterranean projects and nearby above-ground structures. A novel tunnel construction method, known as the suspension method,is introduced in this paper to mitigate surface settlement. The suspension method employs vertical tie rods to establish a structural connection between the initial tunnel support system and the surface steel beam, thereby exerting effective control settlements. To analyze the performance of the proposed method, systematic numerical simulations were conducted based on the practical engineering of Harbin Subway Line 3. The surface settlement and vault settlement characteristics during construction are investigated. The results show a gradual increment in both surface and vault settlement throughout the construction process, culminating in a stabilized state upon the completion of construction.In addition, compared to the double-side drift method and the Cross Diaphragm Method(CRD) method, the suspension method can obviously reduce the surface settlement and vault settlement. Moreover, the surface settlements and the axial force of tie rods were continuously monitored during the construction process at the trial tunnel block.These specific monitoring measurements are illustrated in comparison to numerical analysis results. The monitored results show great agreement with the numerical predictions, confirming the success of the project. This research can serve as a valuable practical reference for similar projects, offering insights and guidance for addressing ground surface settlements and enhancing construction safety in the domain of large cross-section tunneling.展开更多
文摘This study delves into the effects of shield tunneling in complex coastal strata, focusing on how this constructionmethod impacts surface settlement, the mechanical properties of adjacent rock, and the deformation of tunnelsegments. It investigates the impact of shield construction on surface settlement, mechanical characteristics ofnearby rock, and segment deformation in complex coastal strata susceptible to construction disturbances. Utilizingthe Fuzhou Binhai express line as a case study, we developed a comprehensive numerical model using theABAQUS finite element software. The model incorporates factors such as face force, grouting pressure, jack force,and cutterhead torque. Its accuracy is validated against field monitoring data from engineering projects. Simulationswere conducted to analyze ground settlement and mechanical changes in adjacent rock and segments acrossfive soil layers. The results indicate that disturbances are most significant near the excavation zone of the shieldmachine, with a prominent settlement trough forming and stabilizing around 2.0–3.0 D from the excavation. Theexcavation face compresses the soil, inducing lateral expansion. As grouting pressure decreases, the segmentexperiences upward buoyancy. In mixed strata, softer layers witness increased cutting, intensifying disturbancesbut reducing segment floatation. These findings offer valuable insights for predicting settlements, ensuring segmentand rock safety, and optimizing tunneling parameters.
基金Projects(2009G008-B,2010G018-E-3) supported by Key Projects of China Railway Ministry Science and Technology Research and Development ProgramProject(CX2013B076) supported by Hunan Provincial Innovation Foundation For Postgraduate,China
文摘Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation.
基金a part of the project "Universities Natural Science Research Project in Anhui Province" (KJ2011Z375)supported by Department of Education of Anhui Province
文摘The prediction of embankment settlement is a critically important issue for the serviceability of subgrade projects,especially the post-construction settlement.A number of methods have been proposed to predict embankment settlement;however,all of these methods are based on a parameter,i.e.the initial time point.The difference of the initial time point determined by different designers can de?nitely induce errors in prediction of embankment settlement.This paper proposed a concept named"potential settlement"and a simpli?ed method based on the in situ data.The key parameter"b"in the proposed method was veri?ed using theoretical method and?eld data.Finally,an example was used to demonstrate the advantages of the proposed method by comparing with other methods and the observation data.
基金Project(06C843) supported by the Scientific Research Fund of Hunan Provincial Education Department,China
文摘The characteristics of high-filled embankment rheological settlement were analyzed;mechanical calculation model of high-filled embankment rheological settlement during constructing and running period was also put forward.Combining the macroscopic and microscopic deformation properties of the engineering soil grain,its constitutive model was set up and its characters were fully revealed,at the same time,its practical calculation formula under the action of dead-weight load was derived,which is feasible by analysis and comparison.
基金Project(1004178) supported by Talented Person Recommend Foundation of Changsha University of Science and Technology, China
文摘To study calculating method of settlement on top of extra-long large-diameter pile, the relevant research results were summarized. The hyperbola model, a nonlinear load transfer function, was introduced to establish the basic differential equation with load transfer method. Assumed that the displacement of pile shaft was the high order power series of buried depth, through merging the same orthometric items and arranging the relevant coefficients, the solution which could take the nonlinear pile-soil interaction and stratum properties of soil into account was solved by power series. On the basis of the solution, by determining the load transfer depth with criterion of settlement on pile tip, the method by making boundary conditions compatible was advised to solve the load-settlement curve of pile. The relevant flow chart and mathematic expressions of boundary conditions were also listed. Lastly, the load transfer methods based on both two-broken-line model and hyperbola model were applied to analyzing a real project. The related coefficients of fitting curves by hyperbola were not less than 0.96, which shows that the hyperbola model is truthfulness, and is propitious to avoid personal error. The calculating value of load-settlement curve agrees well with the measured one, which indicates that it can be applied in engineering practice and making the theory that limits the design bearing capacity by settlement on pile top comes true.
文摘An active application of a concrete track is expected for the future construction of railroads. For successful concrete track construction and operation in earthwork areas, the residual settlement should be reasonably controlled by using an appro- priate method. The maintenance for excessive settlement is very difficult on the operating line because the maintenance method is very restrictive. The objective of this study is to introduce pressurized rapid-hardening cement grouting (PRCG) method to restore a subsided concrete track without any adverse effects on train operation. This method involves the use of special types of materials (very quick hardening and middle-hardening mortar), compact grouting equipment, and a special construction process. In spite of the extremely restrictive environment, this method has been demonstrated to be very effective and reasonable through laboratory and field tests.
基金supported by the Fundamental Research Funds for the Central Universities(2023JBZD004)the National Natural Science Foundation of China(U2034204,52078031)the Science and Technology Development Project of cccC Harbin Metro Investment and Construction Co.,Ltd.(ZJHD-FW-2018-01-086).
文摘Large cross-section tunnel construction induces ground surface settlements, potentially endangering both subterranean projects and nearby above-ground structures. A novel tunnel construction method, known as the suspension method,is introduced in this paper to mitigate surface settlement. The suspension method employs vertical tie rods to establish a structural connection between the initial tunnel support system and the surface steel beam, thereby exerting effective control settlements. To analyze the performance of the proposed method, systematic numerical simulations were conducted based on the practical engineering of Harbin Subway Line 3. The surface settlement and vault settlement characteristics during construction are investigated. The results show a gradual increment in both surface and vault settlement throughout the construction process, culminating in a stabilized state upon the completion of construction.In addition, compared to the double-side drift method and the Cross Diaphragm Method(CRD) method, the suspension method can obviously reduce the surface settlement and vault settlement. Moreover, the surface settlements and the axial force of tie rods were continuously monitored during the construction process at the trial tunnel block.These specific monitoring measurements are illustrated in comparison to numerical analysis results. The monitored results show great agreement with the numerical predictions, confirming the success of the project. This research can serve as a valuable practical reference for similar projects, offering insights and guidance for addressing ground surface settlements and enhancing construction safety in the domain of large cross-section tunneling.