In this paper,the geological condition of the right-side slope of the K114+694–K115+162 section of Yong-tai-wen Expressway is investigated and analyzed with the results showing that the strength of rock mass is the m...In this paper,the geological condition of the right-side slope of the K114+694–K115+162 section of Yong-tai-wen Expressway is investigated and analyzed with the results showing that the strength of rock mass is the main contributor to the stability of the slope.Then,two widening schemes are proposed,which are the steep slope with strong support and the gentle slope with general support schemes.The static/slope module of MIDAS GTS finite element analysis software and the strength reduction method were used to compare the two schemes.The results show that the steep slope with a strong support scheme has obvious advantages in land requisition,environmental protection,and safety and is more suitable for reconstructing and expanding the highway slope.展开更多
The main aspects that require attention in tunnel design in terms of safety and economy are the precise estimation of probable ground conditions and ground behavior during construction. The variation in rock mass beha...The main aspects that require attention in tunnel design in terms of safety and economy are the precise estimation of probable ground conditions and ground behavior during construction. The variation in rock mass behavior due to tunnel excavation sequence plays an important role during the construction stage.The purpose of this research is to numerically evaluate the effect of excavation sequence on the ground behavior for the Lowari tunnel project, Pakistan. For the tunnel stability, the ground behavior observed during the actual partial face excavation sequence is compared with the top heading and bench excavation sequence. For this purpose, the intact rock parameters are used along with the characterization of rock mass joints related parameters to provide input for numerical modelling via FLAC 2D. The in-situ stresses for the numerical modelling are obtained using empirical equations. From the comparison of the two excavation sequences, it was observed that the actual excavation sequence used for Lowari tunnel construction utilized more support than the top heading and bench method. However, the actual excavation sequence provided good results in terms of stability.展开更多
Blasting-induced cracks in the rock surrounding deeply buried tunnels can result in water gushing and rock mass collapse,posing significant safety risks.However,previous theoretical studies on the range of blasting-in...Blasting-induced cracks in the rock surrounding deeply buried tunnels can result in water gushing and rock mass collapse,posing significant safety risks.However,previous theoretical studies on the range of blasting-induced cracks often ignore the impact of the in-situ stress,especially that of the intermediate principal stress.The particle displacement−crack radius relationship was established in this paper by utilizing the blasthole cavity expansion equation,and theoretical analytical formulas of the stress−displacement relationship and the crack radius were derived with unified strength theory to accurately assess the range of cracks in deep surrounding rock under a blasting load.Parameter analysis showed that the crushing zone size was positively correlated with in-situ stress,intermediate principal stress,and detonation pressure,whereas negatively correlated with Poisson ratio and decoupling coefficient.The dilatancy angle-crushing zone size relationship exhibited nonmonotonic behavior.The relationships in the crushing zone and the fracture zone exhibited opposite trends under the influence of only in-situ stress or intermediate principal stress.As the in-situ stress increased from 0 to 70 MPa,the rate of change in the crack range and the attenuation rate of the peak vibration velocity gradually slowed.展开更多
文摘In this paper,the geological condition of the right-side slope of the K114+694–K115+162 section of Yong-tai-wen Expressway is investigated and analyzed with the results showing that the strength of rock mass is the main contributor to the stability of the slope.Then,two widening schemes are proposed,which are the steep slope with strong support and the gentle slope with general support schemes.The static/slope module of MIDAS GTS finite element analysis software and the strength reduction method were used to compare the two schemes.The results show that the steep slope with a strong support scheme has obvious advantages in land requisition,environmental protection,and safety and is more suitable for reconstructing and expanding the highway slope.
基金supported by the National Research Foundation of Korea Grant funded by the Korean Government (NRF-2019R1A2C2003636)
文摘The main aspects that require attention in tunnel design in terms of safety and economy are the precise estimation of probable ground conditions and ground behavior during construction. The variation in rock mass behavior due to tunnel excavation sequence plays an important role during the construction stage.The purpose of this research is to numerically evaluate the effect of excavation sequence on the ground behavior for the Lowari tunnel project, Pakistan. For the tunnel stability, the ground behavior observed during the actual partial face excavation sequence is compared with the top heading and bench excavation sequence. For this purpose, the intact rock parameters are used along with the characterization of rock mass joints related parameters to provide input for numerical modelling via FLAC 2D. The in-situ stresses for the numerical modelling are obtained using empirical equations. From the comparison of the two excavation sequences, it was observed that the actual excavation sequence used for Lowari tunnel construction utilized more support than the top heading and bench method. However, the actual excavation sequence provided good results in terms of stability.
基金Project(2021JJ10063)supported by the Natural Science Foundation of Hunan Province,ChinaProject(202115)supported by the Science and Technology Progress and Innovation Project of Hunan Provincial Department of Transportation,ChinaProject(2021K094-Z)supported by the Science and Technology Research and Development Program of China Railway Guangzhou Group Co.,Ltd。
文摘Blasting-induced cracks in the rock surrounding deeply buried tunnels can result in water gushing and rock mass collapse,posing significant safety risks.However,previous theoretical studies on the range of blasting-induced cracks often ignore the impact of the in-situ stress,especially that of the intermediate principal stress.The particle displacement−crack radius relationship was established in this paper by utilizing the blasthole cavity expansion equation,and theoretical analytical formulas of the stress−displacement relationship and the crack radius were derived with unified strength theory to accurately assess the range of cracks in deep surrounding rock under a blasting load.Parameter analysis showed that the crushing zone size was positively correlated with in-situ stress,intermediate principal stress,and detonation pressure,whereas negatively correlated with Poisson ratio and decoupling coefficient.The dilatancy angle-crushing zone size relationship exhibited nonmonotonic behavior.The relationships in the crushing zone and the fracture zone exhibited opposite trends under the influence of only in-situ stress or intermediate principal stress.As the in-situ stress increased from 0 to 70 MPa,the rate of change in the crack range and the attenuation rate of the peak vibration velocity gradually slowed.