Considering both the characteristics of construction scheme evaluation and the lack of consideration of index proportionality after introducing comprehensive evaluation of independent perspectives into construction sc...Considering both the characteristics of construction scheme evaluation and the lack of consideration of index proportionality after introducing comprehensive evaluation of independent perspectives into construction scheme evaluation, a construction scheme evaluation model of independent perspectives was put forward through the study and optimization of comprehensive evaluation of independent perspectives. The feasibility and rationality of the optimized method were illustrated through a case study and the evaluation results were compared between the optimized method and non-optimized method. The optimized method has the practical value in construction scheme comparison.展开更多
文摘Considering both the characteristics of construction scheme evaluation and the lack of consideration of index proportionality after introducing comprehensive evaluation of independent perspectives into construction scheme evaluation, a construction scheme evaluation model of independent perspectives was put forward through the study and optimization of comprehensive evaluation of independent perspectives. The feasibility and rationality of the optimized method were illustrated through a case study and the evaluation results were compared between the optimized method and non-optimized method. The optimized method has the practical value in construction scheme comparison.