期刊文献+
共找到499篇文章
< 1 2 25 >
每页显示 20 50 100
Simplified prediction models for acoustic installation effects of train-mounted equipment
1
作者 David Thompson Dong Zhao Giacomo Squicciarini 《Railway Engineering Science》 EI 2024年第2期125-143,共19页
Acoustic models of railway vehicles in standstill and pass-by conditions can be used as part of a virtual certification process for new trains.For each piece of auxiliary equipment,the sound power measured on a test b... Acoustic models of railway vehicles in standstill and pass-by conditions can be used as part of a virtual certification process for new trains.For each piece of auxiliary equipment,the sound power measured on a test bench is combined with meas-ured or predicted transfer functions.It is important,however,to allow for installation effects due to shielding by fairings or the train body.In the current work,fast-running analytical models are developed to determine these installation effects.The model for roof-mounted sources takes account of diffraction at the corner of the train body or fairing,using a barrier model.For equipment mounted under the train,the acoustic propagation from the sides of the source is based on free-field Green’s functions.The bottom surfaces are assumed to radiate initially into a cavity under the train,which is modelled with a simple diffuse field approach.The sound emitted from the gaps at the side of the cavity is then assumed to propagate to the receivers according to free-field Green’s functions.Results show good agreement with a 2.5D boundary element model and with measurements.Modelling uncertainty and parametric uncertainty are evaluated.The largest variability occurs due to the height and impedance of the ground,especially for a low receiver.This leads to standard deviations of up to 4 dB at low frequencies.For the roof-mounted sources,uncertainty over the location of the corner used in the equivalent barrier model can also lead to large standard deviations. 展开更多
关键词 Train noise Auxiliary equipment Acoustic installation effects Virtual certification UNCERTAINTY
下载PDF
Translation Theory and Techniques in Optometry Literature: A Case Study of the “Optoform 80 Installation and Maintenance Manual”
2
作者 JIANG Fangzhou 《Sino-US English Teaching》 2024年第2期94-97,共4页
Translation of specialized documents in optometry presents unique challenges,requiring a deep understanding of the professional context,terminology,and adherence to specific translation styles.This paper delves into t... Translation of specialized documents in optometry presents unique challenges,requiring a deep understanding of the professional context,terminology,and adherence to specific translation styles.This paper delves into the translation theory and techniques employed in the English-to-Chinese translation of the“Optoform 80 Installation and Maintenance Manual”,serving as a case study.Emphasizing Nida’s theory of functional equivalence,the paper explores the complexities of translating professional optometry literature,focusing on key points and common issues in translating installation and maintenance manuals for optometric devices.Special attention is given to the translation of professional terminology,employing methods such as addition,omission,conversion,and repetition.The translation process aims to meet specific requirements,ensuring accuracy and coherence while aligning with Chinese language conventions.The paper also analyzes translation methods and techniques concerning terminology,prepositions,conjunctions,and handling parallel elements based on practical insights from the Optoform 80 Manual. 展开更多
关键词 optometry translation functional equivalence installation and maintenance manual translation
下载PDF
Construction Safety Management of Mechanical and Electrical Installation Projects
3
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 Construction safety Mechanical and electrical installation installation engineering Engineering projects Safety management
下载PDF
Construction Engineering,Equipment Installation,Construction Engineering
4
作者 EN He-bai-yi-la 《Frontiers Research of Architecture and Engineering》 2024年第1期6-10,共5页
At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equ... At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equipment is a large amount of work,with a large number of types of work,with a strong degree of specialization,and also technically complex.In the construction of construction projects in China,the installation of engineer-ing equipment is a key control point of construction safety,and equipment installation has always been a key point that construction enterprises at-tach great importance to.The installation of engineering equipment will not only affect the overall progress of engineering construction,but also affect the quality of the project,therefore,the installation of construction equipment has played a vital role and has attracted increasing attention.Combined with the actual situation of construction enterprises,this paper briefly introduces some problems and solutions existing in the construction of construction enterprises. 展开更多
关键词 Construction works Equipment installation Measures
下载PDF
Construction Technology of Lightning Protection Devices in Building Electrical Installation Engineering
5
作者 Xuhong Du 《Journal of Electronic Research and Application》 2024年第1期22-27,共6页
To better improve the electrical safety of buildings and fulfill the role of lightning protection and grounding,this article combines cases and discusses seven aspects of lightning protection devices’construction tec... To better improve the electrical safety of buildings and fulfill the role of lightning protection and grounding,this article combines cases and discusses seven aspects of lightning protection devices’construction technology.These aspects include the lightning protection classification of buildings,air terminals,down conductors,grounding devices,division of lightning protection zones,and lightning electromagnetic pulse shielding.Through the introduction of this article,readers can gain a comprehensive understanding of the application and value of lightning protection grounding construction technology in building electrical installation projects. 展开更多
关键词 Building electrical installation engineering Lightning protection grounding
下载PDF
Studies on Suction-Assisted Installation Behavior of Suction Caissons in Clay Under Various Undrained Shear Strengths
6
作者 LI Da-yong HOU Xin-yu +2 位作者 ZHANG Yu-kun MA Shi-li LI Shan-shan 《China Ocean Engineering》 SCIE EI CSCD 2023年第6期989-999,共11页
Suction caissons are widely used for anchoring floating platform and offshore wind turbines.Penetration of the suction caisson into the desired position under the combination of its self-weight and applied suction res... Suction caissons are widely used for anchoring floating platform and offshore wind turbines.Penetration of the suction caisson into the desired position under the combination of its self-weight and applied suction resulted from pumping out the encased water is integral to practical engineering.Model tests were carried out to investigate the suctionassisted installation of suction caissons in clay under various undrained shear strengths.It was found that there exists a critical penetration depth value.When the penetration depth is smaller than the critical value,the soil plug undrained shear strength is higher than intact clay(i.e.,clay prior to installation).However,when the penetration depth is greater than the critical penetration depth,the undrained shear strength of soil plug is lower than intact clay.The critical value decreases with the increasing consolidation time and undrained shear strength of clay.During suction-assisted installation,cracks occur around suction caissons.The installation way has little effect on the crack formation.The influence range(i.e.,the maximum distance between the crack and the suction caisson edge)was found to increase with the increasing friction coefficient of interface between the suction caisson wall and soil and decreases with the increasing soil undrained shear strength.In addition,the drained condition of the clay during installation is dominated by the caisson aspect ratio,the undrained shear strength and the friction coefficient between the caisson wall and clay.Equations to estimate the penetration resistance and the required suction to install the suction caisson are summarized. 展开更多
关键词 suction caisson suction-assisted installation model tests undrained shear strength of clay soil deformation
下载PDF
Dynamic Analysis of A Deep-Water Compliant Vertical Access Riser with A Variable Length During Installation
7
作者 LIANG Wei-xing LOU Min +1 位作者 WANG Yu ZHANG Rui 《China Ocean Engineering》 SCIE EI CSCD 2023年第4期568-579,共12页
Compliant vertical access risers(CVAR)have broad application prospects in deep-water oil and gas transportation.However,the mechanical behaviors of the CVAR with a variable length during installation remains unclear.T... Compliant vertical access risers(CVAR)have broad application prospects in deep-water oil and gas transportation.However,the mechanical behaviors of the CVAR with a variable length during installation remains unclear.To address this issue,based on the flexible segment method,a model of CVAR with a variable length during installation is established in this study,which is verified by the comparison with commercial software.Then,the mechanical behaviors of CVAR during installation are investigated.The results reveal that the CVAR configuration is significantly affected by the buoyancy blocks.The streamwise displacement of CVAR increases with the increase of current velocity.When the BOP weight is insuffcient,obvious upbending is observed in the lower region and transition region,leading to local compression.When the platform moves in the opposite direction to the current,the maximum stress is larger than that of the scenario when the platform moves in the same direction as the current. 展开更多
关键词 compliant vertical access riser installation analysis dynamic performance variable length
下载PDF
Experimental Study on the Sinking and Leveling of A Large-Capacity Offshore Wind Turbine Five-Bucket Foundation in Sand
8
作者 LIAN Ji-jian ZHU Hang +2 位作者 GUO Yao-hua WANG Hai-jun YU Tong-shun 《China Ocean Engineering》 SCIE EI CSCD 2024年第4期586-601,共16页
As offshore wind farms expand into deeper and farther ocean regions and the unit capacity of offshore wind turbines(OWTs)increases,there is a pressing need for a new foundation structure that can accommodate deep-sea ... As offshore wind farms expand into deeper and farther ocean regions and the unit capacity of offshore wind turbines(OWTs)increases,there is a pressing need for a new foundation structure that can accommodate deep-sea conditions and support large capacities while maintaining economical and safe.To meet this goal of integrated transportation and one-step installation,a novel five-bucket jacket foundation(FBJF),with its suction installation and leveling methods in sand,has been proposed,analyzed and experimentally studied.First,seepage failure experiments of the FBJF at various depths were conducted,and a formula for calculating the critical suction of seepage failure suitable for the FBJF in sand was chosen and recommended for use with a range of values for the permeability coefficient ratio.Second,through leveling experiments of the FBJF at different depths,the maximum adjustable leveling angle during the sinking process was defined using seepage failure and the adjustable leveling angle of the foundation as control criteria.Various leveling control strategies were proposed and verified.Finally,an automatic sinking and leveling control system for the FBJF was developed and experimentally verified for feasibility. 展开更多
关键词 offshore wind turbine(OWT) bucket foundation seepage failure suction installation
下载PDF
Installation and Debugging of Auto-control System in Fruit Wine Production Line
9
作者 方良材 黄卫萍 陈赶林 《Agricultural Science & Technology》 CAS 2014年第4期611-615,共5页
[Objective] The aim was to test the controlling effect of cleaning steriliza- tion system, material conveying system, and fermentation jar cooling system with equip- ments of fruit wine production line introduced in t... [Objective] The aim was to test the controlling effect of cleaning steriliza- tion system, material conveying system, and fermentation jar cooling system with equip- ments of fruit wine production line introduced in this study and its auto-control sys- tem field assembled and debugged. [Method] Based on controlling equipment and setting parameters on the configuration interface, the operation state of the control equipments could be real-time monitored and controlled with the help of configura- tion software. [Result] The result showed that the equipment system could reduce the temperature into 12 ℃ with the error of +0.5 ℃within 110 minutes when the fermentation temperature is set at 12 ℃ in real production. [Conclusion] The auto- control system of fruit wine production line was easy to be assembled and de- bugged to meet demands of different fruit wine productions. 展开更多
关键词 Fruit wine production line Control system installation DEBUGGING
下载PDF
Engineering and Physical Bases of Development and Creation of Plasmochemical Reactors for Mobile Facilities for Medical Waste Disposal
10
作者 Volodymyr Vashchenko Iryna Korduba +2 位作者 Nancy Mahmoud Al Saeed Hafez Nazarii Nehoda Serhii Tsybytovskyi 《Open Journal of Ecology》 2024年第9期651-662,共12页
This paper presents the results of the development and creation of plasma-chemical reactors for mobile and stationary installations for the destruction and disposal of solid, liquid, gaseous and mixed medical waste ba... This paper presents the results of the development and creation of plasma-chemical reactors for mobile and stationary installations for the destruction and disposal of solid, liquid, gaseous and mixed medical waste based on the domestic plasma generator PUN-1, with air as the plasma-forming gas. The design and principle of operation of plasma-chemical reactors installed on mobile experimental and industrial plants “Plazmon-1,2,3”, as well as the main features of the plasma waste disposal process are described. 展开更多
关键词 Medical Waste INCINERATION Plasma Chemical Reactor Plasma Generator Mobile installations
下载PDF
Chinese Economy Scales New Heights
11
作者 XU GANG 《China Today》 2024年第4期26-30,共5页
The positive figures of last year confirm the strength,resilience,and prospects of the Chinese economy.CHINA’S government work report delivered to the 2024“Two Sessions”in early March released some important statis... The positive figures of last year confirm the strength,resilience,and prospects of the Chinese economy.CHINA’S government work report delivered to the 2024“Two Sessions”in early March released some important statistics.The GDP surpassed RMB 126 trillion,an increase of 5.2 percent.A total of 12.44 million urban jobs were added,and the average surveyed urban unemployment rate stood at 5.2 percent by average.The consumer price index(CPI)rose by 0.2 percent.The production and sales of new-energy vehicles accounted for over 60 percent of the world’s total.Grain output hit a record high of 695 million tonnes.The installed renewable energy capacity surpassed its thermal power for the first time in Chinese history,accounting for over half of newly installed renewable energy capacity worldwide.The per capita disposable income of residents also rose by 6.1 percent nationwide. 展开更多
关键词 INCOME NATIONWIDE installed
下载PDF
Digital Twins:A New Model for Urban Governance
12
作者 Guo Xixian 《China Report ASEAN》 2024年第2期58-61,共4页
Avivid three-dimensional rendering of a bridge appeared on the intelligent monitor and evaluation platform at Beijing Yunlu Technology Co.,Ltd.,pointing to key factors of bridge health.Real-time status,events,transpor... Avivid three-dimensional rendering of a bridge appeared on the intelligent monitor and evaluation platform at Beijing Yunlu Technology Co.,Ltd.,pointing to key factors of bridge health.Real-time status,events,transportation navigation,and traffic conditions were all tracked on the screen.Numerous sensors installed on bridge track every minor dynamic change on the bridge surface and perform digital analysis. 展开更多
关键词 analysis. RENDERING installed
下载PDF
Speeds Up the Construction of a New Power System
13
作者 Zhang Li 《China's Foreign Trade》 2024年第2期51-53,共3页
"In 2023,China's photovoltaic industry continued to maintain a rapid development momentum,with an additional installed capacity of more than 216 GW,accounting for more than half of the global total.The cumula... "In 2023,China's photovoltaic industry continued to maintain a rapid development momentum,with an additional installed capacity of more than 216 GW,accounting for more than half of the global total.The cumulative installed capacity is close to 610 GW,which helps the installed capacity of renewable energy surpass that of thermal power historically.In 2023,the output value of the domestic photovoltaic manufacturing industry exceeded RMB1.75 trillion,a year-on-year increase of 17.1%,and the output of the four main industrial chains of polysilicon. 展开更多
关键词 MAINTAIN continued installed
下载PDF
Return to Reality:Speculative Design of Interaction Ritual Chains and Exploration of Alone Together
14
作者 Chuwen Xu 《Journal of Contemporary Educational Research》 2024年第5期263-269,共7页
“Alone together”is an ever-changing“wicked problem.”In this research and practice,the author tries to combine experience design,referring to the theory of“interaction ritual chain theory,”and creatively add inte... “Alone together”is an ever-changing“wicked problem.”In this research and practice,the author tries to combine experience design,referring to the theory of“interaction ritual chain theory,”and creatively add interactive experience to discursive works,so that the audience can think between the real and the virtual. 展开更多
关键词 Speculative design Interaction ritual chain Alone together installation art
下载PDF
Use of Geosynthetic Access Mats in Construction
15
作者 Waseem A. Khatri Abdullah Al Gazlan +2 位作者 Nawaf Alubaidi Abiola Ojo Waleed Al Safarji 《World Journal of Engineering and Technology》 2024年第3期552-574,共23页
A stable surface to move manpower and equipment is a key for the construction operations. To create a stable road surface, the road construction techniques are time-consuming and expensive for a traditional constructi... A stable surface to move manpower and equipment is a key for the construction operations. To create a stable road surface, the road construction techniques are time-consuming and expensive for a traditional construction which requires compaction of soil, aggregate base, sub-base and asphaltic layers. A Geosynthetic Access Mat (GAM) system can serve as an alternative to other traditional construction techniques to accommodate temporary construction. Due to its rigidity, the mat system can provide substantial vertical resistance to the applied load under a large deflection subject to soil conditions. This paper provides details of GAM specifications, soil conditions, applications, installation procedure, comparison with other soil stabilization methods and Aramco experience for deployments of these mats. 展开更多
关键词 Geosynthetic Access Mats (GAM) Bearing Capacity Ground Water Level (GWL) Soil Testing CONSTRUCTION installation
下载PDF
Research on the Application and Development of Digital Media Art in Urban Public Space Design
16
作者 Xiongwen Gan 《Journal of World Architecture》 2024年第2期62-66,共5页
Digital media art is an emerging art form that combines digital technology and media art.It has huge potential to bring innovation to urban public spaces and provide them with vibrant artistic experiences.This article... Digital media art is an emerging art form that combines digital technology and media art.It has huge potential to bring innovation to urban public spaces and provide them with vibrant artistic experiences.This article analyzes the design significance and value of digital media art in urban public space,its various forms of application in urban public space design,and the innovative ideas and paths that digital media art can take in urban public space to guide the future.The application and innovative methods of digital media art in urban public space design provide certain theoretical and practical references for urban planners and designers. 展开更多
关键词 Urban public space design Digital media art INTELLIGENCE Interactive installation
下载PDF
Performance of a Combined Energy System Consisting of Solar Collector, Biogas Dry Reforming and Solid Oxide Fuel Cell: An Indian Case Study
17
作者 Akira Nishimura Ryotaro Sato +1 位作者 Ryota Nakajima Eric Hu 《Smart Grid and Renewable Energy》 2024年第10期217-247,共31页
An energy production system consisting of a solar collector, biogas dry reforming reactor and solid oxide fuel cell (SOFC) was assumed to be installed in Kolkata, India. This study aims to understand the impact of cli... An energy production system consisting of a solar collector, biogas dry reforming reactor and solid oxide fuel cell (SOFC) was assumed to be installed in Kolkata, India. This study aims to understand the impact of climate conditions on the performance of solar collectors with different lengths of parabolic trough solar collector (dx) and mass flow rate of heat transfer fluid (m). In addition, this study has evaluated the amount of H2 produced by biogas dry reforming (GH2), the amount of power generated by SOFC (PSOFC) and the maximum number of possible households (N) whose electricity demand could be met by the energy system proposed, considering the performance of solar collector with the different dx and m. As a result, the optimum dx was found to be 4 m. This study revealed that the temperature of heat transfer fluid (Tfb) decreased with the increase in m. Tfb in March, April and May was higher than that in other months, while Tfb from June to December was the lowest. GH2, PSOFC and N in March, April and May were higher than those in other months, irrespective of m. The optimum m was 0.030 kg/s. 展开更多
关键词 Solar Collector Temperature of Simulated Biogas Case Study of installation in India H2 Production by Dry Reforming Power Generated by SOFC
下载PDF
New Quality,Great Potential
18
作者 XU GANG 《ChinAfrica》 2024年第4期18-21,共4页
Here are some of the achievements China made in 2023:GDP exceeded 126 trillion yuan($17.43 trillion)with a growth of 5.2 percent;12.44 million new urban jobs were created;average surveyed unemployment rate in urban ar... Here are some of the achievements China made in 2023:GDP exceeded 126 trillion yuan($17.43 trillion)with a growth of 5.2 percent;12.44 million new urban jobs were created;average surveyed unemployment rate in urban areas was 5.2 percent;consumer price index increased by 0.2 percent;new energy vehicle production and sales accounted for more than 60 percent of the global share;grain output reached a record high of 695 billion kg;installed renewable energy capacity surpassed thermal power capacity for the first time in history,and China accounted for over half of newly installed renewable energy capacity worldwide;per-capita disposable income of residents increased by 6.1 percent… 展开更多
关键词 INCOME installed GREAT
下载PDF
使用IBM Installation Factory简化Web Sphere Application Server的安装和部署
19
作者 杜剑侠 《电子技术与软件工程》 2013年第16期231-232,共2页
本文重点介绍了IBMInstal-lation Factory(以下简称IF)的主要功能,讲解如何使用IF生成定制安装包和集成安装包,以及如何使用生成的定制安装包和集成安装包来简化和标准化Web Sphere Application Server的安装和部署。
关键词 1BM INSTALL ation Facto ry安装(Sc ratch Install)定制安装包集成安装包(IIP)初始(CIP)
下载PDF
One-Step-Installation of Offshore Wind Turbine on Large-Scale Bucket-Top-Bearing Bucket Foundation 被引量:18
20
作者 丁红岩 练继建 +1 位作者 李爱东 张浦阳 《Transactions of Tianjin University》 EI CAS 2013年第3期188-194,共7页
In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the d... In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year. 展开更多
关键词 one-step-installation TECHNIQUE large-scale bucket-top-bearing BUCKET foundation self-floating towing penetration TECHNIQUE with adjustment of horizontal levelness removability TECHNIQUE construction and installation cost
下载PDF
上一页 1 2 25 下一页 到第
使用帮助 返回顶部