Acoustic models of railway vehicles in standstill and pass-by conditions can be used as part of a virtual certification process for new trains.For each piece of auxiliary equipment,the sound power measured on a test b...Acoustic models of railway vehicles in standstill and pass-by conditions can be used as part of a virtual certification process for new trains.For each piece of auxiliary equipment,the sound power measured on a test bench is combined with meas-ured or predicted transfer functions.It is important,however,to allow for installation effects due to shielding by fairings or the train body.In the current work,fast-running analytical models are developed to determine these installation effects.The model for roof-mounted sources takes account of diffraction at the corner of the train body or fairing,using a barrier model.For equipment mounted under the train,the acoustic propagation from the sides of the source is based on free-field Green’s functions.The bottom surfaces are assumed to radiate initially into a cavity under the train,which is modelled with a simple diffuse field approach.The sound emitted from the gaps at the side of the cavity is then assumed to propagate to the receivers according to free-field Green’s functions.Results show good agreement with a 2.5D boundary element model and with measurements.Modelling uncertainty and parametric uncertainty are evaluated.The largest variability occurs due to the height and impedance of the ground,especially for a low receiver.This leads to standard deviations of up to 4 dB at low frequencies.For the roof-mounted sources,uncertainty over the location of the corner used in the equivalent barrier model can also lead to large standard deviations.展开更多
At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equ...At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equipment is a large amount of work,with a large number of types of work,with a strong degree of specialization,and also technically complex.In the construction of construction projects in China,the installation of engineer-ing equipment is a key control point of construction safety,and equipment installation has always been a key point that construction enterprises at-tach great importance to.The installation of engineering equipment will not only affect the overall progress of engineering construction,but also affect the quality of the project,therefore,the installation of construction equipment has played a vital role and has attracted increasing attention.Combined with the actual situation of construction enterprises,this paper briefly introduces some problems and solutions existing in the construction of construction enterprises.展开更多
Successful cases have not been rare, that is to import funds accelerate hospital building by means of raising funds, borrowing, renting, jointing, and so on. The same characteristics is raising money at first and then...Successful cases have not been rare, that is to import funds accelerate hospital building by means of raising funds, borrowing, renting, jointing, and so on. The same characteristics is raising money at first and then working, and the investor will earn high proportional benefits. 'Importing funds' has solved some practical problems, but it also causes some negative effects, such as difficulty in management, being difficult to work, inequitable benefit allocation, little benefits earned by the hospital, a big venture, and so on.By means of installment, the hospital has imported much equipment, such as very expensive Magnetic Resonating Instrument (MRI), spiral CT, straight accelerator, ECT and so on. Connecting with practice, the authors has analyzed objectively the profits and the harm of importing equipment by installment. There are four reasons for applying installment: firstly, it solves the problem of shortage of funds of the hospital; secondly, it efficiently avoids the inconvenience resulted from the management by both jointing sides together; thirdly, it raises the investing earnings of the hospital; finally, it is advantages which are as follows. Importing large-scale foreign equipment from abroad by installment has not been popular in the native hospital, and there are not relatively regular and ripe rules to be followed. Moreover, because effective institution is required to act as an economic guarantor, an extra content of work will, be added to practice.The authors prefer that attentions should be paid to the five aspects in importing equipment by means of installment; selecting the suitable importing project, selecting a favorable cooperating partner and deciding suitable cooperating items; selecting an excellent company or institution to guarantee for the hospital, and grasping the practice of the contract.展开更多
In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the d...In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.展开更多
The article introduces the main practices and achievements of the Environment and Plant Protection Institute of Chinese Academy of Tropical Agricultural Sciences in promoting the sharing of large-scale instruments and...The article introduces the main practices and achievements of the Environment and Plant Protection Institute of Chinese Academy of Tropical Agricultural Sciences in promoting the sharing of large-scale instruments and equipment in recent years,analyzes the existing problems in the management system,management team,assessment incentives and maintenance guarantee,and proposes improvement measures and suggestions from aspects of improving the sharing management system,strengthening management team building,strengthening sharing assessment and incentives,improving maintenance capabilities and expanding external publicity,to further improve the sharing management of large-scale instruments and equipment.展开更多
As we all know,the construction and construction process of civil engineering projects are very complicated,so coordination and cooperation of different professions and types of work are required during construction.B...As we all know,the construction and construction process of civil engineering projects are very complicated,so coordination and cooperation of different professions and types of work are required during construction.Based on this,the article focuses on the strategy of equipment installation engineering and civil engineering construction cooperation from different construction stages and hopes to help.展开更多
HVAC equipment is very concerned in the current equipment operation process.Its safety,reliability and comfort will have a greater impact on the production and life of common people.In some projects,there are some pro...HVAC equipment is very concerned in the current equipment operation process.Its safety,reliability and comfort will have a greater impact on the production and life of common people.In some projects,there are some problems in the installation of HVAC equipment,such as imperfect installation scheme,low installation quality and random selection of equipment parameters.These seriously affect the normal operation of the equipment,and it is not easy to achieve energy saving of HVAC equipment.In the future installation of HVAC equipment,it is necessary to continuously optimize the HVAC equipment installation system,fully compare the reliability and feasibility of the equipment installation scheme,and strengthen the application of energy-saving technology of HVAC equipment.In this way,the use cost of the equipment can be reduced and the comprehensive quality of the equipment can be improved.Therefore,this paper discusses this further and puts forward reasonable suggestions.展开更多
The level of personnel operation ability determines the expected effectiveness of large-scale complex equipment. Firstly, this paper constructs the personnel operational ability evaluation index system and analyzes th...The level of personnel operation ability determines the expected effectiveness of large-scale complex equipment. Firstly, this paper constructs the personnel operational ability evaluation index system and analyzes the data source of index. Secondly, the weight of index is determined and the fuzzy comprehensive evaluation model is proposed. Finally, results of instance analysis show that the evaluation model is feasible and effective.展开更多
基金The work described here has been supported by the TRANSIT project(funded by EU Horizon 2020 and the Europe’s Rail Joint Undertaking under grant agreement 881771).
文摘Acoustic models of railway vehicles in standstill and pass-by conditions can be used as part of a virtual certification process for new trains.For each piece of auxiliary equipment,the sound power measured on a test bench is combined with meas-ured or predicted transfer functions.It is important,however,to allow for installation effects due to shielding by fairings or the train body.In the current work,fast-running analytical models are developed to determine these installation effects.The model for roof-mounted sources takes account of diffraction at the corner of the train body or fairing,using a barrier model.For equipment mounted under the train,the acoustic propagation from the sides of the source is based on free-field Green’s functions.The bottom surfaces are assumed to radiate initially into a cavity under the train,which is modelled with a simple diffuse field approach.The sound emitted from the gaps at the side of the cavity is then assumed to propagate to the receivers according to free-field Green’s functions.Results show good agreement with a 2.5D boundary element model and with measurements.Modelling uncertainty and parametric uncertainty are evaluated.The largest variability occurs due to the height and impedance of the ground,especially for a low receiver.This leads to standard deviations of up to 4 dB at low frequencies.For the roof-mounted sources,uncertainty over the location of the corner used in the equivalent barrier model can also lead to large standard deviations.
文摘At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equipment is a large amount of work,with a large number of types of work,with a strong degree of specialization,and also technically complex.In the construction of construction projects in China,the installation of engineer-ing equipment is a key control point of construction safety,and equipment installation has always been a key point that construction enterprises at-tach great importance to.The installation of engineering equipment will not only affect the overall progress of engineering construction,but also affect the quality of the project,therefore,the installation of construction equipment has played a vital role and has attracted increasing attention.Combined with the actual situation of construction enterprises,this paper briefly introduces some problems and solutions existing in the construction of construction enterprises.
文摘Successful cases have not been rare, that is to import funds accelerate hospital building by means of raising funds, borrowing, renting, jointing, and so on. The same characteristics is raising money at first and then working, and the investor will earn high proportional benefits. 'Importing funds' has solved some practical problems, but it also causes some negative effects, such as difficulty in management, being difficult to work, inequitable benefit allocation, little benefits earned by the hospital, a big venture, and so on.By means of installment, the hospital has imported much equipment, such as very expensive Magnetic Resonating Instrument (MRI), spiral CT, straight accelerator, ECT and so on. Connecting with practice, the authors has analyzed objectively the profits and the harm of importing equipment by installment. There are four reasons for applying installment: firstly, it solves the problem of shortage of funds of the hospital; secondly, it efficiently avoids the inconvenience resulted from the management by both jointing sides together; thirdly, it raises the investing earnings of the hospital; finally, it is advantages which are as follows. Importing large-scale foreign equipment from abroad by installment has not been popular in the native hospital, and there are not relatively regular and ripe rules to be followed. Moreover, because effective institution is required to act as an economic guarantor, an extra content of work will, be added to practice.The authors prefer that attentions should be paid to the five aspects in importing equipment by means of installment; selecting the suitable importing project, selecting a favorable cooperating partner and deciding suitable cooperating items; selecting an excellent company or institution to guarantee for the hospital, and grasping the practice of the contract.
基金Supported by National High Technology Research and Development Program of China("863"Program,No.2012AA051705)National Natural Science Foundation of China(No.51109160)International Science and Technology Cooperation Program of China(No.2012DFA70490)
文摘In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.
文摘The article introduces the main practices and achievements of the Environment and Plant Protection Institute of Chinese Academy of Tropical Agricultural Sciences in promoting the sharing of large-scale instruments and equipment in recent years,analyzes the existing problems in the management system,management team,assessment incentives and maintenance guarantee,and proposes improvement measures and suggestions from aspects of improving the sharing management system,strengthening management team building,strengthening sharing assessment and incentives,improving maintenance capabilities and expanding external publicity,to further improve the sharing management of large-scale instruments and equipment.
文摘As we all know,the construction and construction process of civil engineering projects are very complicated,so coordination and cooperation of different professions and types of work are required during construction.Based on this,the article focuses on the strategy of equipment installation engineering and civil engineering construction cooperation from different construction stages and hopes to help.
文摘HVAC equipment is very concerned in the current equipment operation process.Its safety,reliability and comfort will have a greater impact on the production and life of common people.In some projects,there are some problems in the installation of HVAC equipment,such as imperfect installation scheme,low installation quality and random selection of equipment parameters.These seriously affect the normal operation of the equipment,and it is not easy to achieve energy saving of HVAC equipment.In the future installation of HVAC equipment,it is necessary to continuously optimize the HVAC equipment installation system,fully compare the reliability and feasibility of the equipment installation scheme,and strengthen the application of energy-saving technology of HVAC equipment.In this way,the use cost of the equipment can be reduced and the comprehensive quality of the equipment can be improved.Therefore,this paper discusses this further and puts forward reasonable suggestions.
基金supported by the Natural Science Foundation of China(71704184)Projects of the of the National Social Science Foundation of China(15GJ003-245)Science Foundation of Equipment Research(JJ20172A05095)
文摘The level of personnel operation ability determines the expected effectiveness of large-scale complex equipment. Firstly, this paper constructs the personnel operational ability evaluation index system and analyzes the data source of index. Secondly, the weight of index is determined and the fuzzy comprehensive evaluation model is proposed. Finally, results of instance analysis show that the evaluation model is feasible and effective.