The development of the construction industry is shifting towards low-carbon construction,so it is necessary to improve and optimize related construction concepts,methods,and processes.By improving resource and energy ...The development of the construction industry is shifting towards low-carbon construction,so it is necessary to improve and optimize related construction concepts,methods,and processes.By improving resource and energy control efficiency in building projects,minimizing construction waste,and reducing environmental impact,a foundation for the sustainable development of the industry can be established.This paper mainly analyzes the significance of low-carbon energy-saving construction technology and the control factors of construction,summarizes the status quo of the development of building energy-saving construction,and puts forward strategies for applying building energy-saving construction technology.These strategies serve to achieve low-carbon and energy-saving goals to promote the healthy development of energy-saving construction.展开更多
The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guarante...The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guaranteed the frame body and structure security by the frame body calculating, on-site test and reasonable construction order.展开更多
In order to improve the efficiency of EPS integral thermal insulation building design and optimize the construction process of insulation construction, this paper uses experiment parts and simulation form to design th...In order to improve the efficiency of EPS integral thermal insulation building design and optimize the construction process of insulation construction, this paper uses experiment parts and simulation form to design the thermal insulation construction process, and evaluates the effect of heat preservation. Based on the finite element theory this paper designs adding process of insulation material EPS in the thermal insulation layer, and establishes the radiation heat conduction model of EPS material, finally obtains the solid heat conduction equation. Finally this paper uses ANSYS software to do simulation on the strength and temperature of EPS construction, and evaluates the quality of construction works, which provides technical reference for the design of integrated thermal insulation buildings.展开更多
In this paper, the suitability and construction technology of self-insulation walls were studied under the specific climatic conditions and regional resources of Hanzhong and Ankang in the hot summer and cold winter z...In this paper, the suitability and construction technology of self-insulation walls were studied under the specific climatic conditions and regional resources of Hanzhong and Ankang in the hot summer and cold winter zone of Southern Shaanxi. Through the calculation of heat transfer coefficient and thermal inertia index, combined with the specifications of the shale hollow brick and aerated concrete block of Hanzhong and Ankang in southern Shaanxi, the thermal performance and suitable thickness of the external wall using self-insulation materials that meet the Design Standard for Energy Efficiency of Residential Buildings(DBJ61-65-2011) in Shaanxi Province were obtained. The results showed that the self-insulation wall had technical suitability in the hot summer and cold winter zone. The research results provide not only a theoretical basis for the external wall insulation design of urban residential buildings in the hot summer and cold winter zone of southern Shaanxi, but also a reference for designers to carry out energy-saving design of external walls of residential buildings in other similar climate zones.展开更多
INTRODUCTION“You won’t find any issues in our newly constructed and retrofitted buildings,”was the response that Lyndon Johnson,representative of the BC Insulators,got from the campus facility manager when explaini...INTRODUCTION“You won’t find any issues in our newly constructed and retrofitted buildings,”was the response that Lyndon Johnson,representative of the BC Insulators,got from the campus facility manager when explaining the poor state of practice of mechanical insulation,“let me show you one of our showcase buildings.”The building in question had just undergone$80 million in upgrades and was designed to achieve LEED®Silver equivalent rating.The upgrades included a high-performance climate control system that allows for precise control of temperature and humidity in different rooms.“We toured the building and found many problems with the mechanical insulation,”explained Mr.Johnson afterwards,“including substandard finish,adhesive tape lifting,and most disturbing,20 feet of missing insulation on each floor of the building along the dividing line of the two phases of the project.One or both sets of contractors that worked on the job had completely left off the insulation.The saddest part is,this didn’t surprise me given what we know about the state of the industry today.”展开更多
The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on sin...The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on single piles with different forms of pile shoes and on their composite foundations were analyzed. The distribution patterns of axial force, shaft friction and toe resistance were studied based on the measurements taken from buried strain gauges. From the point of engineering application, the pile has merits in convenient quality control, high bearing capacity and reliable quality, showing higher reasonability, advancement and suitability than other ground improvement methods. The pile can be adopted properly to take place of ordinary ground improvement method, achieving greater economical and social benefits.展开更多
Date palm pit(DPP)-filled poly(-hydroxybutyrate)(PHB)composites were prepared,evaluated,and characterized to determine their thermal insulation ability.Thermal conductivity values ranged between 0.086 and 0.100 W/(m...Date palm pit(DPP)-filled poly(-hydroxybutyrate)(PHB)composites were prepared,evaluated,and characterized to determine their thermal insulation ability.Thermal conductivity values ranged between 0.086 and 0.100 W/(m·K).At a maximum filler concentration(50%(w)),the specific heat capacity and thermal diffusivity were 1183 J/(kg·K)and 0.0689 mm^(2)/s,respec-tively.The DPP increased the thermal stability,and the highest compressive strength obtained was 80 MPa at 30%filler content.The PHB-DPP composites exhibited promising water absorption(less than 6%)and tensile strength(6-14 MPa).Date-pit-based PHB composites could be used in sustainable building engineering and cleaner production.展开更多
基金Research on Zero Emission Campus Construction Based on Plant Community Optimization(Project number:KJQN202305605)。
文摘The development of the construction industry is shifting towards low-carbon construction,so it is necessary to improve and optimize related construction concepts,methods,and processes.By improving resource and energy control efficiency in building projects,minimizing construction waste,and reducing environmental impact,a foundation for the sustainable development of the industry can be established.This paper mainly analyzes the significance of low-carbon energy-saving construction technology and the control factors of construction,summarizes the status quo of the development of building energy-saving construction,and puts forward strategies for applying building energy-saving construction technology.These strategies serve to achieve low-carbon and energy-saving goals to promote the healthy development of energy-saving construction.
文摘The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guaranteed the frame body and structure security by the frame body calculating, on-site test and reasonable construction order.
文摘In order to improve the efficiency of EPS integral thermal insulation building design and optimize the construction process of insulation construction, this paper uses experiment parts and simulation form to design the thermal insulation construction process, and evaluates the effect of heat preservation. Based on the finite element theory this paper designs adding process of insulation material EPS in the thermal insulation layer, and establishes the radiation heat conduction model of EPS material, finally obtains the solid heat conduction equation. Finally this paper uses ANSYS software to do simulation on the strength and temperature of EPS construction, and evaluates the quality of construction works, which provides technical reference for the design of integrated thermal insulation buildings.
文摘In this paper, the suitability and construction technology of self-insulation walls were studied under the specific climatic conditions and regional resources of Hanzhong and Ankang in the hot summer and cold winter zone of Southern Shaanxi. Through the calculation of heat transfer coefficient and thermal inertia index, combined with the specifications of the shale hollow brick and aerated concrete block of Hanzhong and Ankang in southern Shaanxi, the thermal performance and suitable thickness of the external wall using self-insulation materials that meet the Design Standard for Energy Efficiency of Residential Buildings(DBJ61-65-2011) in Shaanxi Province were obtained. The results showed that the self-insulation wall had technical suitability in the hot summer and cold winter zone. The research results provide not only a theoretical basis for the external wall insulation design of urban residential buildings in the hot summer and cold winter zone of southern Shaanxi, but also a reference for designers to carry out energy-saving design of external walls of residential buildings in other similar climate zones.
文摘INTRODUCTION“You won’t find any issues in our newly constructed and retrofitted buildings,”was the response that Lyndon Johnson,representative of the BC Insulators,got from the campus facility manager when explaining the poor state of practice of mechanical insulation,“let me show you one of our showcase buildings.”The building in question had just undergone$80 million in upgrades and was designed to achieve LEED®Silver equivalent rating.The upgrades included a high-performance climate control system that allows for precise control of temperature and humidity in different rooms.“We toured the building and found many problems with the mechanical insulation,”explained Mr.Johnson afterwards,“including substandard finish,adhesive tape lifting,and most disturbing,20 feet of missing insulation on each floor of the building along the dividing line of the two phases of the project.One or both sets of contractors that worked on the job had completely left off the insulation.The saddest part is,this didn’t surprise me given what we know about the state of the industry today.”
基金Project (2007H03) supported by Communications Department of Zhejiang Province
文摘The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on single piles with different forms of pile shoes and on their composite foundations were analyzed. The distribution patterns of axial force, shaft friction and toe resistance were studied based on the measurements taken from buried strain gauges. From the point of engineering application, the pile has merits in convenient quality control, high bearing capacity and reliable quality, showing higher reasonability, advancement and suitability than other ground improvement methods. The pile can be adopted properly to take place of ordinary ground improvement method, achieving greater economical and social benefits.
基金financially supported by UAE University (SURE+2022 Grant#G00003848).
文摘Date palm pit(DPP)-filled poly(-hydroxybutyrate)(PHB)composites were prepared,evaluated,and characterized to determine their thermal insulation ability.Thermal conductivity values ranged between 0.086 and 0.100 W/(m·K).At a maximum filler concentration(50%(w)),the specific heat capacity and thermal diffusivity were 1183 J/(kg·K)and 0.0689 mm^(2)/s,respec-tively.The DPP increased the thermal stability,and the highest compressive strength obtained was 80 MPa at 30%filler content.The PHB-DPP composites exhibited promising water absorption(less than 6%)and tensile strength(6-14 MPa).Date-pit-based PHB composites could be used in sustainable building engineering and cleaner production.