Northeast China Electric Power Group(NEPG) has outstanding achievements in thesurvey, design, construction and regulationof power plants and power transmissionproject, the management of hydropowerProject, the construc...Northeast China Electric Power Group(NEPG) has outstanding achievements in thesurvey, design, construction and regulationof power plants and power transmissionproject, the management of hydropowerProject, the construction and maintenance ofnuclear power project. The constructioncontingents 0f it have great strength intechnical equipment, project quality andscientific payoffs. They are very experiencedin integral management 0f the design’construction and the adjustment of thepr0ject and in the international cooperationand also they have good internationalcooperation examples.展开更多
Warehouse management, as a higher vocational course integrating theory and practice, is of extreme importance to training the professional personnel logistics management. In this paper, under the premise of the teachi...Warehouse management, as a higher vocational course integrating theory and practice, is of extreme importance to training the professional personnel logistics management. In this paper, under the premise of the teaching objective of course Warehouse Management, and based on analyzing the disadvantages in the current teaching of the course, the teaching mode integrating theory and practice courses, and teaching and learning is discussed, so this paper is of great significance to the design of the course teaching modes in higher vocational colleges.展开更多
The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced tech...The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced technical means into architectural design,project construction,and management,so as to ensure the quality and safety of construction to the maximum extent.The application of BIM not only improves the efficiency of construction and construction quality,but also realizes the control of construction cost.This study explores and analyzes the advantages of BIM as well as proposes application strategies of BIM in architectural design,project construction,and management,hoping to contribute to the smooth construction of construction engineering.展开更多
The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most cr...The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most critical design and budgetary decisions-shaping the essential traits of the project,hence emerge the need and necessity to create and integrate mechanisms to support the decision-making process.Design decisions should not be based on assumptions,past experiences,or imagination.An example of the numerous problems that are a result of uninformed design decisions is“change orders”,known as the deviation from the original scope of work,which leads to an increase of the overall cost,and changes to the construction schedule of the project.The long-term aim of this inquiry is to understand the user’s behavior,and establish evidence-based control measures,which are actions and processes that can be implemented in practice to decrease the volume and frequency of the occurrence of change orders.The current study developed a foundation for further examination by proposing potential control measures,and testing their efficiency,such as integrating Virtual Reality(VR).The specific aim was to examine the effect of different visualization methods(i.e.,VR vs.construction drawings)on,(1)how well the subjects understand the information presented about the future/planned environment;(2)the subjects’perceived confidence in what the future environment will look like;(3)the likelihood of changing the built environment;(4)design review time;and(5)accuracy in reviewing and understanding the design.展开更多
Change orders have a significant impact on many aspects of construction projects.They are known to be the primary cause of litigation in the construction industry.Change orders are almost inevitable due to the uniquen...Change orders have a significant impact on many aspects of construction projects.They are known to be the primary cause of litigation in the construction industry.Change orders are almost inevitable due to the uniqueness of each project from many perspectives,such as the type of building,complexity of the design,human factors,and the available resources.Change orders are the formal mechanism to implement design changes during the execution phase.These changes are usually the outcome of lack of visualization by the owner,misunderstanding,miscommunication between different parties involved in the project,shortage in resources,and other factors.This research aims to investigate and rank causes,effects,and control measures of change orders in the construction industry in the U.S.This research presents the results of a questionnaire surveying owners,contractors,and consultants.A total of 123 industry professionals in the Architecture,Engineering,and Construction(AEC)field,with either significant or final decision-making authority on reviewing,issuing,and approving change orders responded to the survey.Results indicated that owners are the primary source followed by consultants and contractors,respectively.Some of the more important control measures identified in this research are collaboration and visualization technologies.展开更多
From virtual technology,the Internet to the meta-universe,around the creation of virtual and real isomorphism and immersive experience venues,an innovative integration model and innovative design concept integrating t...From virtual technology,the Internet to the meta-universe,around the creation of virtual and real isomorphism and immersive experience venues,an innovative integration model and innovative design concept integrating the three major fields of"science and technology+art+culture"have been opened,and the method of today's design industry management model has also been shaped.The author,ground on design originality and experience,intends to source feasible exhibition design tactics from the"presence"design and implementation project that integrates immersive display and performances.From this,efforts are invested in sorting specific innovative design patterns referring to ongoing cases of Metaverse,thereby charting course for prospective design projects.展开更多
Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined...Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved.展开更多
This paper describes how database information and electronic 3D models are integrated to produce power plant designs more efficiently and accurately. Engineering CAD/CAE systems have evolved from strictly 3D modeling ...This paper describes how database information and electronic 3D models are integrated to produce power plant designs more efficiently and accurately. Engineering CAD/CAE systems have evolved from strictly 3D modeling to spatial data management tools. This paper describes how process data, commodities, and location data are disseminated to the various project team members through a central integrated database. The database and 3D model also provide a cache of information that is valuable to the constructor, and operations and maintenance Personnel.展开更多
Many years experience of the operation of high stress (>72% specified minimum yield strength, SMYS) gas pipelines and statistical analysis results of pipeline incidents showed that the operating pipelines at stress...Many years experience of the operation of high stress (>72% specified minimum yield strength, SMYS) gas pipelines and statistical analysis results of pipeline incidents showed that the operating pipelines at stress levels over 72% SMYS have not presented problems in USA and Canada, and design factor does not control incidents or the safety of pipelines. Enhancing pipeline safety management level is most important for decreasing incident rate. The application history of higher design factors in the U.S and Canada was reviewed. And the effect of higher factors to the critical flaw size, puncture resistance, change of reliability with time, risk level and the arrest toughness requirements of pipeline were analyzed here. The comparison of pipeline failure rates and risk levels between two design factors (0.72 and 0.8) has shown that a change in design factor from 0.72 to 0.8 would bring little effect on failure rates and risk levels. On the basis of the analysis result, the application feasibility of design factor of 0.8 in China was discussed and the related suggestions were proposed. When an operator wishes to apply design factor 0.8 to gas pipeline, the following process is recommended: stress level of line pipe hydro test should be up to 100% SMYS, reliability and risk assessment at the design feasibility or conceptual stage should be conducted, Charpy impact energy should meet the need of pipeline crack arrest; and establish and execute risk based integrity management plan. The technology of pipeline steel metallurgy, line pipe fabrication and pipeline construction, and line pipe quality control level in China achieved tremendous progresses, and line pipe product standards and property indexes have come up to international advanced level. Furthermore, pipeline safety management has improved greatly in China. Consequently, the research for the feasibility of application of design factor of 0.8 in China has fundamental basis.展开更多
Sustainable development of refinery is an important problem that refining industry faces in the21st Century. The situation and challenges in front of refining industry are analyzed and illustrated byexamples in this p...Sustainable development of refinery is an important problem that refining industry faces in the21st Century. The situation and challenges in front of refining industry are analyzed and illustrated byexamples in this paper. It is also recognized that large-scale, clean, light-oriented and integrated refinery isthe mode of development in future, and also an important measure for the sustainable development ofpetroleum resource.展开更多
The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected ou...The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected out of a population of one hundred and eighty six (186) from three main professional associations in Ghana made up of the Ghana Institute of Architects, Ghana Institution of Engineers and the Ghana Institution of Surveyors (Quantity Surveying Division) practicing in Ghana for the study. Both primary and secondary data were collected. A descriptive survey was also used to observe and describe the presence, frequency or absence of characteristics of a phenomenon as it naturally occurred, in order to gain additional information. A questionnaire was also designed to collect data from the architects, engineers and quantity surveyors. The data was analyzed using Statistical Package for the Social Scientists (SPSS) 17.0. Descriptive and inferential statistics, such as frequency tables, percentages and cross tabulations were used in the data analysis and summaries. Simple tests of associations were undertaken by using Chi square and Cramer’s V statistics to compare relationships between variables. Again, relative importance index was also used to analyze some of the data by computing to deduce their rankings. The relative importance index was used to analyze some of the data by computing to deduce their rankings. The research revealed that majority of consultants had an average knowledge of risk management. Based on the findings it was recommended that consultants undergo advanced training in risk assessment. It was therefore suggested that consultancy firms should develop a set of laid down procedures for consultants to use in risk assessment in order that the use of intuition employed by majority is lessened. The challenges observed in risk assessment and the remedial steps suggested curtailing the detrimental effects of risks would be of wide importance to many developing economies.展开更多
In this thesis, the design in construction management is defined as the design meets the requirements of the constructor. There are a range of definitions of design, but in this paper "design" refers to something, w...In this thesis, the design in construction management is defined as the design meets the requirements of the constructor. There are a range of definitions of design, but in this paper "design" refers to something, which has been planned and made and a pattern for decorating in something in the term of construction. Rumane says (2010)the design involves two processes. The first thing is analyzing and designing components and structure on the basis of recognized codes and standards of safety. The other is that designers conduct the information in the form展开更多
Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construc...Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construction sustainability tools, methods and techniques, a greener design can be applied during various building phases. In this connection, it is argued that the analytical and integrated models applied by Building Information Modelling (BIM) may also facilitate this process to be performed more efficiently. BIM and construction sustainability are quite different initiatives, but both have received much attention in recent years in the architecture, engineering and construction (AEC) industry. A rigorous analysis of the interactions between them implies that a synergy exists which, if properly it is understood that can be helpful to reduce the environmental impacts of the AEC industry. A BIM-based design model can contribute to sustainability through its three main dimensions which are environmental, economic and social. In this paper, by reviewing the existing literature on BIM and construction sustainability and using a matrix to analyze construction sustainability dimensions and BIM functionalities a number of interactions have been discussed. It can be concluded that despite there are many improvements in implementation of BIM in environmental and economic aspects of sustainability, its potential impact on social dimension has not been explicitly explored hence further studies need to be undertaken in this area.展开更多
The Asian longhorned beetle(ALB),Anoplophora glabripennis,is a well-known stem borer with high polyphagous properties causing frequent outbreaks in northeast China.An attractant-based trap is needed to improve the sen...The Asian longhorned beetle(ALB),Anoplophora glabripennis,is a well-known stem borer with high polyphagous properties causing frequent outbreaks in northeast China.An attractant-based trap is needed to improve the sensitivity,reliability,and effi ciency for detection of the beetle.In this study,the eff ects of attractants,trap types and color synergy of a trapping system were evaluated.Attractant blends comprised of the male-produced,two-component pheromone plus plant volatiles were used in the fi eld in Hengshui city.Plant volatiles(e.g.,1-pentanol,and 2-pentanol)in combination with male pheromones increased the mean number of trapped ALB compared to the pheromone alone.Males responded better than females to traps baited with plant volatiles alone,whereas traps emitting plant volatiles plus pheromone,regardless of trap type,captured more females than males.The ALB-trapping effi ciency of a modifi ed fl ight intercept panel trap was more than ten times as high as a woodborer panel trap and 1.2 times a fl ight intercept panel trap.The 1-pentanol and 2-pentanol attractants alone or in combination with male-produced pheromone were more eff ective for monitoring ALB than common lures.In laboratory Y-tube olfactometer experiments,the color brown was better at increasing attraction of both males and females to 1-pentanol,2-pentanol,1-pentanol+pheromone,and 2-pentanol+pheromone compared to the clear-glass control arm.The fi ndings provide a reliable and eff ective trap system to monitor ALB infestations.展开更多
文摘Northeast China Electric Power Group(NEPG) has outstanding achievements in thesurvey, design, construction and regulationof power plants and power transmissionproject, the management of hydropowerProject, the construction and maintenance ofnuclear power project. The constructioncontingents 0f it have great strength intechnical equipment, project quality andscientific payoffs. They are very experiencedin integral management 0f the design’construction and the adjustment of thepr0ject and in the international cooperationand also they have good internationalcooperation examples.
文摘Warehouse management, as a higher vocational course integrating theory and practice, is of extreme importance to training the professional personnel logistics management. In this paper, under the premise of the teaching objective of course Warehouse Management, and based on analyzing the disadvantages in the current teaching of the course, the teaching mode integrating theory and practice courses, and teaching and learning is discussed, so this paper is of great significance to the design of the course teaching modes in higher vocational colleges.
文摘The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced technical means into architectural design,project construction,and management,so as to ensure the quality and safety of construction to the maximum extent.The application of BIM not only improves the efficiency of construction and construction quality,but also realizes the control of construction cost.This study explores and analyzes the advantages of BIM as well as proposes application strategies of BIM in architectural design,project construction,and management,hoping to contribute to the smooth construction of construction engineering.
文摘The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most critical design and budgetary decisions-shaping the essential traits of the project,hence emerge the need and necessity to create and integrate mechanisms to support the decision-making process.Design decisions should not be based on assumptions,past experiences,or imagination.An example of the numerous problems that are a result of uninformed design decisions is“change orders”,known as the deviation from the original scope of work,which leads to an increase of the overall cost,and changes to the construction schedule of the project.The long-term aim of this inquiry is to understand the user’s behavior,and establish evidence-based control measures,which are actions and processes that can be implemented in practice to decrease the volume and frequency of the occurrence of change orders.The current study developed a foundation for further examination by proposing potential control measures,and testing their efficiency,such as integrating Virtual Reality(VR).The specific aim was to examine the effect of different visualization methods(i.e.,VR vs.construction drawings)on,(1)how well the subjects understand the information presented about the future/planned environment;(2)the subjects’perceived confidence in what the future environment will look like;(3)the likelihood of changing the built environment;(4)design review time;and(5)accuracy in reviewing and understanding the design.
文摘Change orders have a significant impact on many aspects of construction projects.They are known to be the primary cause of litigation in the construction industry.Change orders are almost inevitable due to the uniqueness of each project from many perspectives,such as the type of building,complexity of the design,human factors,and the available resources.Change orders are the formal mechanism to implement design changes during the execution phase.These changes are usually the outcome of lack of visualization by the owner,misunderstanding,miscommunication between different parties involved in the project,shortage in resources,and other factors.This research aims to investigate and rank causes,effects,and control measures of change orders in the construction industry in the U.S.This research presents the results of a questionnaire surveying owners,contractors,and consultants.A total of 123 industry professionals in the Architecture,Engineering,and Construction(AEC)field,with either significant or final decision-making authority on reviewing,issuing,and approving change orders responded to the survey.Results indicated that owners are the primary source followed by consultants and contractors,respectively.Some of the more important control measures identified in this research are collaboration and visualization technologies.
文摘From virtual technology,the Internet to the meta-universe,around the creation of virtual and real isomorphism and immersive experience venues,an innovative integration model and innovative design concept integrating the three major fields of"science and technology+art+culture"have been opened,and the method of today's design industry management model has also been shaped.The author,ground on design originality and experience,intends to source feasible exhibition design tactics from the"presence"design and implementation project that integrates immersive display and performances.From this,efforts are invested in sorting specific innovative design patterns referring to ongoing cases of Metaverse,thereby charting course for prospective design projects.
文摘Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved.
文摘This paper describes how database information and electronic 3D models are integrated to produce power plant designs more efficiently and accurately. Engineering CAD/CAE systems have evolved from strictly 3D modeling to spatial data management tools. This paper describes how process data, commodities, and location data are disseminated to the various project team members through a central integrated database. The database and 3D model also provide a cache of information that is valuable to the constructor, and operations and maintenance Personnel.
基金supported by China National Petroleum Corporation Application Fundamental Research Foundation (Grant No. 07A40401)
文摘Many years experience of the operation of high stress (>72% specified minimum yield strength, SMYS) gas pipelines and statistical analysis results of pipeline incidents showed that the operating pipelines at stress levels over 72% SMYS have not presented problems in USA and Canada, and design factor does not control incidents or the safety of pipelines. Enhancing pipeline safety management level is most important for decreasing incident rate. The application history of higher design factors in the U.S and Canada was reviewed. And the effect of higher factors to the critical flaw size, puncture resistance, change of reliability with time, risk level and the arrest toughness requirements of pipeline were analyzed here. The comparison of pipeline failure rates and risk levels between two design factors (0.72 and 0.8) has shown that a change in design factor from 0.72 to 0.8 would bring little effect on failure rates and risk levels. On the basis of the analysis result, the application feasibility of design factor of 0.8 in China was discussed and the related suggestions were proposed. When an operator wishes to apply design factor 0.8 to gas pipeline, the following process is recommended: stress level of line pipe hydro test should be up to 100% SMYS, reliability and risk assessment at the design feasibility or conceptual stage should be conducted, Charpy impact energy should meet the need of pipeline crack arrest; and establish and execute risk based integrity management plan. The technology of pipeline steel metallurgy, line pipe fabrication and pipeline construction, and line pipe quality control level in China achieved tremendous progresses, and line pipe product standards and property indexes have come up to international advanced level. Furthermore, pipeline safety management has improved greatly in China. Consequently, the research for the feasibility of application of design factor of 0.8 in China has fundamental basis.
文摘Sustainable development of refinery is an important problem that refining industry faces in the21st Century. The situation and challenges in front of refining industry are analyzed and illustrated byexamples in this paper. It is also recognized that large-scale, clean, light-oriented and integrated refinery isthe mode of development in future, and also an important measure for the sustainable development ofpetroleum resource.
文摘The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected out of a population of one hundred and eighty six (186) from three main professional associations in Ghana made up of the Ghana Institute of Architects, Ghana Institution of Engineers and the Ghana Institution of Surveyors (Quantity Surveying Division) practicing in Ghana for the study. Both primary and secondary data were collected. A descriptive survey was also used to observe and describe the presence, frequency or absence of characteristics of a phenomenon as it naturally occurred, in order to gain additional information. A questionnaire was also designed to collect data from the architects, engineers and quantity surveyors. The data was analyzed using Statistical Package for the Social Scientists (SPSS) 17.0. Descriptive and inferential statistics, such as frequency tables, percentages and cross tabulations were used in the data analysis and summaries. Simple tests of associations were undertaken by using Chi square and Cramer’s V statistics to compare relationships between variables. Again, relative importance index was also used to analyze some of the data by computing to deduce their rankings. The relative importance index was used to analyze some of the data by computing to deduce their rankings. The research revealed that majority of consultants had an average knowledge of risk management. Based on the findings it was recommended that consultants undergo advanced training in risk assessment. It was therefore suggested that consultancy firms should develop a set of laid down procedures for consultants to use in risk assessment in order that the use of intuition employed by majority is lessened. The challenges observed in risk assessment and the remedial steps suggested curtailing the detrimental effects of risks would be of wide importance to many developing economies.
文摘In this thesis, the design in construction management is defined as the design meets the requirements of the constructor. There are a range of definitions of design, but in this paper "design" refers to something, which has been planned and made and a pattern for decorating in something in the term of construction. Rumane says (2010)the design involves two processes. The first thing is analyzing and designing components and structure on the basis of recognized codes and standards of safety. The other is that designers conduct the information in the form
文摘Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construction sustainability tools, methods and techniques, a greener design can be applied during various building phases. In this connection, it is argued that the analytical and integrated models applied by Building Information Modelling (BIM) may also facilitate this process to be performed more efficiently. BIM and construction sustainability are quite different initiatives, but both have received much attention in recent years in the architecture, engineering and construction (AEC) industry. A rigorous analysis of the interactions between them implies that a synergy exists which, if properly it is understood that can be helpful to reduce the environmental impacts of the AEC industry. A BIM-based design model can contribute to sustainability through its three main dimensions which are environmental, economic and social. In this paper, by reviewing the existing literature on BIM and construction sustainability and using a matrix to analyze construction sustainability dimensions and BIM functionalities a number of interactions have been discussed. It can be concluded that despite there are many improvements in implementation of BIM in environmental and economic aspects of sustainability, its potential impact on social dimension has not been explicitly explored hence further studies need to be undertaken in this area.
基金supported by the Fundamental Research Funds for the Central Universities(2572021BK01).
文摘The Asian longhorned beetle(ALB),Anoplophora glabripennis,is a well-known stem borer with high polyphagous properties causing frequent outbreaks in northeast China.An attractant-based trap is needed to improve the sensitivity,reliability,and effi ciency for detection of the beetle.In this study,the eff ects of attractants,trap types and color synergy of a trapping system were evaluated.Attractant blends comprised of the male-produced,two-component pheromone plus plant volatiles were used in the fi eld in Hengshui city.Plant volatiles(e.g.,1-pentanol,and 2-pentanol)in combination with male pheromones increased the mean number of trapped ALB compared to the pheromone alone.Males responded better than females to traps baited with plant volatiles alone,whereas traps emitting plant volatiles plus pheromone,regardless of trap type,captured more females than males.The ALB-trapping effi ciency of a modifi ed fl ight intercept panel trap was more than ten times as high as a woodborer panel trap and 1.2 times a fl ight intercept panel trap.The 1-pentanol and 2-pentanol attractants alone or in combination with male-produced pheromone were more eff ective for monitoring ALB than common lures.In laboratory Y-tube olfactometer experiments,the color brown was better at increasing attraction of both males and females to 1-pentanol,2-pentanol,1-pentanol+pheromone,and 2-pentanol+pheromone compared to the clear-glass control arm.The fi ndings provide a reliable and eff ective trap system to monitor ALB infestations.