The modern history of management systems is almost the same as the history ofmodem management science. Implicit management systems have been in existence for many 100s ofyears. ISO has paid attention to the issue of t...The modern history of management systems is almost the same as the history ofmodem management science. Implicit management systems have been in existence for many 100s ofyears. ISO has paid attention to the issue of the integrated management systems since the ISO 9000family standards for quality management systems (QMS) and ISO 14000 series standards for environmentmanagement system (EMS) were published. ISO/TAG (Technical Advisory Group) 12 was formed by theISO/TM (Technical Management Board) in early 1997 with the mandate to achieve greater compatibilitybetween the relevant ISO/TC 176 and ISO/TC 207 standards in the field of management systems,auditing, terms and definitions. The report was submitted to TMB by TAG 12 in 1999.展开更多
Development on dolomite poses a risk to people and their assets living on it. Although development in the Tlokwe City Council (TCC) broadly took cognisance of the presence of dolomite, some parts of the township had b...Development on dolomite poses a risk to people and their assets living on it. Although development in the Tlokwe City Council (TCC) broadly took cognisance of the presence of dolomite, some parts of the township had been developed on dolomite. Therefore, since the Council is accountable for safe development within its jurisdiction, a Dolomite Risk Management Programme (DRMPr) should be put in place according to prevailing legislation, standards and guidelines. For long-term mitigation measures to be implemented successfully, the DRMPr should be integrated and aligned within the existing structure and processes of the Council. This exercise is described, with some challenges identified and recommendations made, for consideration in the same or similar programmes in future.展开更多
Fostering integration between caregivers in the ambulatory sector involves transforming the institutional, organizational and technical flamework but also redesigning the work performed by health care professionals. E...Fostering integration between caregivers in the ambulatory sector involves transforming the institutional, organizational and technical flamework but also redesigning the work performed by health care professionals. Empirical research on the implementation of integrated care highlights professional engagement and commitment as a key success factor during the change process. Although a mismatch of motives during the integration process is often reported only a few studies have explored motivational aspects of health care integration. The aim of this study is to explore motivational factors for health care professionals in order to identify the determinants of attractiveness of integrated forms of care. An online-questionnaire was developed to identify the most important motivational factors for health care professionals and to reflect their perceptions on the attractiveness of interdisciplinary forms of care. The sample includes practicing physicians (general practitioners and specialists), practicing nurses and non-physician professions (physiotherapists, midwives, speech therapists, occupational therapists). Findings suggest that health care professionals are highly motivated by intrinsic motivators. Physicians turned out to be the most reluctant group towards integrated care models. Participating in integrated forms of care would challenge working independently which represents a strong motivator. The responses of nurses suggest that they are the most favorable group. Integrated care forms would be attractive offering more possibilities for social relationships, expanding responsibilities and challenging work. Results support the importance of health workforce engagement and participation in planning health care integration.展开更多
The SubBytes (S-box) transformation is the most crucial operation in the AES algorithm, significantly impacting the implementation performance of AES chips. To design a high-performance S-box, a segmented optimization...The SubBytes (S-box) transformation is the most crucial operation in the AES algorithm, significantly impacting the implementation performance of AES chips. To design a high-performance S-box, a segmented optimization implementation of the S-box is proposed based on the composite field inverse operation in this paper. This proposed S-box implementation is modeled using Verilog language and synthesized using Design Complier software under the premise of ensuring the correctness of the simulation result. The synthesis results show that, compared to several current S-box implementation schemes, the proposed implementation of the S-box significantly reduces the area overhead and critical path delay, then gets higher hardware efficiency. This provides strong support for realizing efficient and compact S-box ASIC designs.展开更多
introduced are the main implementation contents and brought out is a cycle optimal PDMimplementation methodology by phases through studying requirements of enterprises' datamanagement and summarizing the existing ...introduced are the main implementation contents and brought out is a cycle optimal PDMimplementation methodology by phases through studying requirements of enterprises' datamanagement and summarizing the existing method. The implementation contents include documentsmanagement product structure and configuration management, product classification and codingmanagement, workflow management and software encapsulation. It divides the PDM implementationinto preparing, software selechon and training, implementation plan making, concrete implementingand evaluating. By the cycle of the last two pheses, the successful implementation of PDM can beobtained. This methodology has been used in the CIMS project of two companies and proved to bepractical.展开更多
文摘The modern history of management systems is almost the same as the history ofmodem management science. Implicit management systems have been in existence for many 100s ofyears. ISO has paid attention to the issue of the integrated management systems since the ISO 9000family standards for quality management systems (QMS) and ISO 14000 series standards for environmentmanagement system (EMS) were published. ISO/TAG (Technical Advisory Group) 12 was formed by theISO/TM (Technical Management Board) in early 1997 with the mandate to achieve greater compatibilitybetween the relevant ISO/TC 176 and ISO/TC 207 standards in the field of management systems,auditing, terms and definitions. The report was submitted to TMB by TAG 12 in 1999.
文摘Development on dolomite poses a risk to people and their assets living on it. Although development in the Tlokwe City Council (TCC) broadly took cognisance of the presence of dolomite, some parts of the township had been developed on dolomite. Therefore, since the Council is accountable for safe development within its jurisdiction, a Dolomite Risk Management Programme (DRMPr) should be put in place according to prevailing legislation, standards and guidelines. For long-term mitigation measures to be implemented successfully, the DRMPr should be integrated and aligned within the existing structure and processes of the Council. This exercise is described, with some challenges identified and recommendations made, for consideration in the same or similar programmes in future.
文摘Fostering integration between caregivers in the ambulatory sector involves transforming the institutional, organizational and technical flamework but also redesigning the work performed by health care professionals. Empirical research on the implementation of integrated care highlights professional engagement and commitment as a key success factor during the change process. Although a mismatch of motives during the integration process is often reported only a few studies have explored motivational aspects of health care integration. The aim of this study is to explore motivational factors for health care professionals in order to identify the determinants of attractiveness of integrated forms of care. An online-questionnaire was developed to identify the most important motivational factors for health care professionals and to reflect their perceptions on the attractiveness of interdisciplinary forms of care. The sample includes practicing physicians (general practitioners and specialists), practicing nurses and non-physician professions (physiotherapists, midwives, speech therapists, occupational therapists). Findings suggest that health care professionals are highly motivated by intrinsic motivators. Physicians turned out to be the most reluctant group towards integrated care models. Participating in integrated forms of care would challenge working independently which represents a strong motivator. The responses of nurses suggest that they are the most favorable group. Integrated care forms would be attractive offering more possibilities for social relationships, expanding responsibilities and challenging work. Results support the importance of health workforce engagement and participation in planning health care integration.
文摘The SubBytes (S-box) transformation is the most crucial operation in the AES algorithm, significantly impacting the implementation performance of AES chips. To design a high-performance S-box, a segmented optimization implementation of the S-box is proposed based on the composite field inverse operation in this paper. This proposed S-box implementation is modeled using Verilog language and synthesized using Design Complier software under the premise of ensuring the correctness of the simulation result. The synthesis results show that, compared to several current S-box implementation schemes, the proposed implementation of the S-box significantly reduces the area overhead and critical path delay, then gets higher hardware efficiency. This provides strong support for realizing efficient and compact S-box ASIC designs.
文摘introduced are the main implementation contents and brought out is a cycle optimal PDMimplementation methodology by phases through studying requirements of enterprises' datamanagement and summarizing the existing method. The implementation contents include documentsmanagement product structure and configuration management, product classification and codingmanagement, workflow management and software encapsulation. It divides the PDM implementationinto preparing, software selechon and training, implementation plan making, concrete implementingand evaluating. By the cycle of the last two pheses, the successful implementation of PDM can beobtained. This methodology has been used in the CIMS project of two companies and proved to bepractical.