On March 19, the construction of a 10-MW photovoltaic power plant and a 1 000-kW new type geothermal power generation project were started by Guodian Longyuan Group in Yanbajing Town, Dangxiong County of Tibet.
This study designs and proposes a method for evaluating the configuration of energy storage for integrated re-newable generation plants in the power spot market,which adopts a two-level optimization model of“system s...This study designs and proposes a method for evaluating the configuration of energy storage for integrated re-newable generation plants in the power spot market,which adopts a two-level optimization model of“system simulation+plant optimization”.The first step is“system simulation”which is using the power market simu-lation model to obtain the initial nodal marginal price and curtailment of the integrated renewable generation plant.The second step is“plant optimization”which is using the operation optimization model of the integrated renewable generation plant to optimize the charge-discharge operation of energy storage.In the third step,“sys-tem simulation”is conducted again,and the combined power of renewable and energy storage inside the plant is brought into the system model and simulated again for 8,760 h of power market year-round to quantify and compare the power generation and revenue of the integrated renewable generation plant after applying energy storage.In the case analysis of the provincial power spot market,an empirical analysis of a 1 GW wind-solar-storage integrated generation plant was conducted.The results show that the economic benefit of energy storage is approximately proportional to its capacity and that there is a slowdown in the growth of economic benefits when the capacity is too large.In the case that the investment benefit of energy storage only considers the in-come of electric energy-related incomes and does not consider the income of capacity mechanism and auxiliary services,the income of energy storage cannot fulfill the economic requirements of energy storage investment.展开更多
Coal has been the main energy source in China for a long period.Therefore,the energy industry must improve coal power generation efficiency and achieve near-zero CO_(2) emissions.Integrated gasification fuel cell(IGFC...Coal has been the main energy source in China for a long period.Therefore,the energy industry must improve coal power generation efficiency and achieve near-zero CO_(2) emissions.Integrated gasification fuel cell(IGFC)systems that combine coal gasification and high-temperature fuel cells,such as solid oxide fuel cells or molten carbonate fuel cells(MCFCs),are proving to be promising for efficient and clean power generation,compared with traditional coal-fired power plants.In 2017,with the support of National Key R&D Program of China,a consortium led by the China Energy Group and including 12 institutions was formed to develop the advanced IGFC technology with near-zero CO_(2) emissions.The objectives of this project include understanding the performance of an IGFC power generation system under different operating conditions,designing master system principles for engineering optimization,developing key technologies and intellectual property portfolios,setting up supply chains for key materials and equipment,and operating the first megawatt IGFC demonstration system with near-zero CO_(2) emission,in early 2022.In this paper,the main developments and projections pertaining to the IGFC project are highlighted.展开更多
Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electr...Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electricity we have to rely on renewable energy resources. To address these challenges, wind power generation is among the popular options in the world which is now being considered in Pakistan as well. However unremitting change in wind speed from calm to stormy introduces real challenges. Storing wind energy in batteries during the periods of low demand seems an expensive option, especially when dealing with large scale power generation. Due to incessantly varying nature of wind speed, it is not feasible to rely only on wind power for cheap power production. Also, it is not thriftily possible to construct separate transmission line. However if we integrate wind power with hydro power, we can utilize the maximum possible transmission capacity. Existing hydro power station operating in that area or pumped storage scheme can be used. This paper is an attempt to analyze coordination of wind generation with hydro power in those areas of Pakistan where both wind and hydro power sources exist. In this paper, different issues have been analyzed taking case study of Dargai. This paper is first attempt in Pakistan about integration of wind and hydro power to draw some general conclusions and to point out some areas in which further research can be done.展开更多
With the rapid development of wind power in China, the grid integration of wind energy systems has imposed lots of influences on the security and operation of power grids. This paper provides an overview of the charac...With the rapid development of wind power in China, the grid integration of wind energy systems has imposed lots of influences on the security and operation of power grids. This paper provides an overview of the characteristics of the wind power development in terms of distribution area, wind farm scale, integration voltage level and performance of wind turbines. The paper also presents an analysis of the problems and reasons emerging from the wind power integration in China and ends with putting forward some measures and suggestions about the wind power integration and operation for reference.展开更多
The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as h...The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as high as ten times its rated current. This could cause many problems from mechanical stress on transformer windings to harmonics injection, and system protection malfunction. There have been numerous researches focusing on calculation and mitigation of the transformer inrush current. With the development of smart grid, distributed generation from independent power producers (IPPs) is growing rapidly. This paper investigates the inrush current due to black start of an IPP system with several parallel transformers, through a simulation model in DIgSILENT Power Factory software. The study demonstrates that a single genset is capable of energizing a group of transformers since the overall inrush current is slightly above the inrush of the transformer directly connected to the generator. In addition, a simple method is proposed to mitigate the inrush current of the transformers using an auxiliary transformer.展开更多
Integrating solar power utilization systems with coal-fired power units, the solar aided coal-fired power generation (SACPG) shows a significant prospect for the large-scale utilization of solar energy and energy savi...Integrating solar power utilization systems with coal-fired power units, the solar aided coal-fired power generation (SACPG) shows a significant prospect for the large-scale utilization of solar energy and energy saving of thermal power units. The methods and mechanism of system integration were studied. The parabolic trough solar collectors were used to collect solar energy and the integration scheme of SACPG system was determined considering the matching of working fluid flows and energy flows. The thermodynamic characteristics of solar thermal power generation and their effects on the performance of thermal power units were studied, and based on this the integration and optimization model of system structure and parameters were built up. The integration rules and coupling mecha- nism of SACPG systems were summarized in accordance with simulation results. The economic analysis of this SACPG system showed that the solar LEC of a typical SACPG system, considering CO2 avoidance, is 0.098 $/kW·h, lower than that of SEGS, 0.14 $/kW·h.展开更多
As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are n...As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are not suitable to be studied separately.This paper presents a distributed continuation power flow method for VSA of global transmission and distribution grid.Two different parameterization schemes are adopted to guarantee the coherence of load growth in transmission and distribution grids.In the correction step,the boundary bus voltage,load parameter and equivalent power are communicated between the transmission and distribution control centers to realize the distributed computation of load margin.The optimal multiplier technique is used to improve the convergence of the proposed method.The three-phase unbalanced characteristic of distribution networks and the reactive capability limits of DGs are considered.Simulation results on two integrated transmission and distribution test systems show that the proposed method is effective.展开更多
To solve the problem of permanent-shadow shading of photovoltaic buildings,a maximum power point tracking(MPPT)strategy to determine the search range by pre-delimiting area is proposed to improve MPPT efficiency.The s...To solve the problem of permanent-shadow shading of photovoltaic buildings,a maximum power point tracking(MPPT)strategy to determine the search range by pre-delimiting area is proposed to improve MPPT efficiency.The single correspondence between the solar-cell current-voltage(I-V)curve and the illumination conditions was proved by using the single-diode model of photovoltaic cells,thus proving that a change in the illumination conditions corresponds to a unique maximum power point(MPP)search area.According to the approximate relationship between MPP voltage,current and open-circuit voltage and short-circuit current of a photovoltaic module,the voltage region where the MPP is located is determined and the global maximum power point is determined using the power operating triangle strategy in this region.Simulation carried out in MATLAB proves the correctness and feasibility of the theoretical research.Simulation results show that the MPPT strategy proposed in this paper can improve the average efficiency by 1.125%when applied in series as building integrated photovoltaics.展开更多
提出一种基于空间矢量调制直接功率控制(direct power control with space vector modulation,DPC-SVM)的直接虚拟功率控制算法。此控制算法扩展了现有DPC的适用范围,在电压源换流器(voltage source converter,VSC)交流侧开路及交流测...提出一种基于空间矢量调制直接功率控制(direct power control with space vector modulation,DPC-SVM)的直接虚拟功率控制算法。此控制算法扩展了现有DPC的适用范围,在电压源换流器(voltage source converter,VSC)交流侧开路及交流测电流为零时,通过虚拟功率保持DPC控制模块的反馈回路,使DPC能够在VSC换流器并网前控制交流侧输出电压幅值和频率稳定并与电网接入点保持一致。此算法计算过程简单,使用大部分原有DPC-SVM控制模块,并且与DPC-SVM结构保持一致,从而使VSC换流器并网前后控制算法切换平滑。该文分别利用PSCAD/EMTDC软件平台和实验室硬件实验电路进行仿真和电路实验,验证提出的控制算法的正确性和有效性。展开更多
文摘On March 19, the construction of a 10-MW photovoltaic power plant and a 1 000-kW new type geothermal power generation project were started by Guodian Longyuan Group in Yanbajing Town, Dangxiong County of Tibet.
基金funded by the China Energy Investment Cor-poration under the program“Simulation of energy storage application scenarios in China and research on development strategy of China En-ergy Investment Corporation”(Grant No.:GJNY-21-143).
文摘This study designs and proposes a method for evaluating the configuration of energy storage for integrated re-newable generation plants in the power spot market,which adopts a two-level optimization model of“system simulation+plant optimization”.The first step is“system simulation”which is using the power market simu-lation model to obtain the initial nodal marginal price and curtailment of the integrated renewable generation plant.The second step is“plant optimization”which is using the operation optimization model of the integrated renewable generation plant to optimize the charge-discharge operation of energy storage.In the third step,“sys-tem simulation”is conducted again,and the combined power of renewable and energy storage inside the plant is brought into the system model and simulated again for 8,760 h of power market year-round to quantify and compare the power generation and revenue of the integrated renewable generation plant after applying energy storage.In the case analysis of the provincial power spot market,an empirical analysis of a 1 GW wind-solar-storage integrated generation plant was conducted.The results show that the economic benefit of energy storage is approximately proportional to its capacity and that there is a slowdown in the growth of economic benefits when the capacity is too large.In the case that the investment benefit of energy storage only considers the in-come of electric energy-related incomes and does not consider the income of capacity mechanism and auxiliary services,the income of energy storage cannot fulfill the economic requirements of energy storage investment.
基金This work was financially supported by the National Key R&D Program of China(2017YFB0601900).
文摘Coal has been the main energy source in China for a long period.Therefore,the energy industry must improve coal power generation efficiency and achieve near-zero CO_(2) emissions.Integrated gasification fuel cell(IGFC)systems that combine coal gasification and high-temperature fuel cells,such as solid oxide fuel cells or molten carbonate fuel cells(MCFCs),are proving to be promising for efficient and clean power generation,compared with traditional coal-fired power plants.In 2017,with the support of National Key R&D Program of China,a consortium led by the China Energy Group and including 12 institutions was formed to develop the advanced IGFC technology with near-zero CO_(2) emissions.The objectives of this project include understanding the performance of an IGFC power generation system under different operating conditions,designing master system principles for engineering optimization,developing key technologies and intellectual property portfolios,setting up supply chains for key materials and equipment,and operating the first megawatt IGFC demonstration system with near-zero CO_(2) emission,in early 2022.In this paper,the main developments and projections pertaining to the IGFC project are highlighted.
文摘Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electricity we have to rely on renewable energy resources. To address these challenges, wind power generation is among the popular options in the world which is now being considered in Pakistan as well. However unremitting change in wind speed from calm to stormy introduces real challenges. Storing wind energy in batteries during the periods of low demand seems an expensive option, especially when dealing with large scale power generation. Due to incessantly varying nature of wind speed, it is not feasible to rely only on wind power for cheap power production. Also, it is not thriftily possible to construct separate transmission line. However if we integrate wind power with hydro power, we can utilize the maximum possible transmission capacity. Existing hydro power station operating in that area or pumped storage scheme can be used. This paper is an attempt to analyze coordination of wind generation with hydro power in those areas of Pakistan where both wind and hydro power sources exist. In this paper, different issues have been analyzed taking case study of Dargai. This paper is first attempt in Pakistan about integration of wind and hydro power to draw some general conclusions and to point out some areas in which further research can be done.
文摘With the rapid development of wind power in China, the grid integration of wind energy systems has imposed lots of influences on the security and operation of power grids. This paper provides an overview of the characteristics of the wind power development in terms of distribution area, wind farm scale, integration voltage level and performance of wind turbines. The paper also presents an analysis of the problems and reasons emerging from the wind power integration in China and ends with putting forward some measures and suggestions about the wind power integration and operation for reference.
文摘The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as high as ten times its rated current. This could cause many problems from mechanical stress on transformer windings to harmonics injection, and system protection malfunction. There have been numerous researches focusing on calculation and mitigation of the transformer inrush current. With the development of smart grid, distributed generation from independent power producers (IPPs) is growing rapidly. This paper investigates the inrush current due to black start of an IPP system with several parallel transformers, through a simulation model in DIgSILENT Power Factory software. The study demonstrates that a single genset is capable of energizing a group of transformers since the overall inrush current is slightly above the inrush of the transformer directly connected to the generator. In addition, a simple method is proposed to mitigate the inrush current of the transformers using an auxiliary transformer.
基金Supported by the National Natural Science Foundation of China (Grant Nos. 50776028 and 50606010) the Program for New Century Excellent Talents in University (Grant No. NCET-05-0217)
文摘Integrating solar power utilization systems with coal-fired power units, the solar aided coal-fired power generation (SACPG) shows a significant prospect for the large-scale utilization of solar energy and energy saving of thermal power units. The methods and mechanism of system integration were studied. The parabolic trough solar collectors were used to collect solar energy and the integration scheme of SACPG system was determined considering the matching of working fluid flows and energy flows. The thermodynamic characteristics of solar thermal power generation and their effects on the performance of thermal power units were studied, and based on this the integration and optimization model of system structure and parameters were built up. The integration rules and coupling mecha- nism of SACPG systems were summarized in accordance with simulation results. The economic analysis of this SACPG system showed that the solar LEC of a typical SACPG system, considering CO2 avoidance, is 0.098 $/kW·h, lower than that of SEGS, 0.14 $/kW·h.
基金This work is supported by National Natural Science Foundation of China(No.51077042,No.51577049)Special Foundation of The doctoral program of Higher Education(No.20120094110008).
文摘As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are not suitable to be studied separately.This paper presents a distributed continuation power flow method for VSA of global transmission and distribution grid.Two different parameterization schemes are adopted to guarantee the coherence of load growth in transmission and distribution grids.In the correction step,the boundary bus voltage,load parameter and equivalent power are communicated between the transmission and distribution control centers to realize the distributed computation of load margin.The optimal multiplier technique is used to improve the convergence of the proposed method.The three-phase unbalanced characteristic of distribution networks and the reactive capability limits of DGs are considered.Simulation results on two integrated transmission and distribution test systems show that the proposed method is effective.
文摘To solve the problem of permanent-shadow shading of photovoltaic buildings,a maximum power point tracking(MPPT)strategy to determine the search range by pre-delimiting area is proposed to improve MPPT efficiency.The single correspondence between the solar-cell current-voltage(I-V)curve and the illumination conditions was proved by using the single-diode model of photovoltaic cells,thus proving that a change in the illumination conditions corresponds to a unique maximum power point(MPP)search area.According to the approximate relationship between MPP voltage,current and open-circuit voltage and short-circuit current of a photovoltaic module,the voltage region where the MPP is located is determined and the global maximum power point is determined using the power operating triangle strategy in this region.Simulation carried out in MATLAB proves the correctness and feasibility of the theoretical research.Simulation results show that the MPPT strategy proposed in this paper can improve the average efficiency by 1.125%when applied in series as building integrated photovoltaics.
文摘提出一种基于空间矢量调制直接功率控制(direct power control with space vector modulation,DPC-SVM)的直接虚拟功率控制算法。此控制算法扩展了现有DPC的适用范围,在电压源换流器(voltage source converter,VSC)交流侧开路及交流测电流为零时,通过虚拟功率保持DPC控制模块的反馈回路,使DPC能够在VSC换流器并网前控制交流侧输出电压幅值和频率稳定并与电网接入点保持一致。此算法计算过程简单,使用大部分原有DPC-SVM控制模块,并且与DPC-SVM结构保持一致,从而使VSC换流器并网前后控制算法切换平滑。该文分别利用PSCAD/EMTDC软件平台和实验室硬件实验电路进行仿真和电路实验,验证提出的控制算法的正确性和有效性。