In this paper,a new model with a total amount control target of allowable water withdrawal based on initial water right is built for the implementation of initial water right allocation scheme as well as unified alloc...In this paper,a new model with a total amount control target of allowable water withdrawal based on initial water right is built for the implementation of initial water right allocation scheme as well as unified allocation for allowable water withdrawal and sewage discharge.The model couples the water allocation simulation model and the computational model of permissible pol-lution bearing capacity.In view of the model complexity,a new technology which synthesizes system simulation,iterative reservoir turns and intelligent computation is proposed to improve the operability of allocation scheme and computational efficiency.Taking the Beijiang River Basin in the Pearl River Basin as an example,the study explains the model establishment,solution and application,and draws an optimized operation graph of large-scale reservoirs.The study also obtains a long-term operation strategy of river basin water resources system,the allocation schemes of allowable water withdrawal and sewage discharge in a typical year and the flow hydrographs of trans-boundary sections.The validity of the model and the allocation rationality are analyzed as well.展开更多
The present water pollution situation at watershed level in China has been systematically analyzed.The causes of water pollution are attributed to the extensive economic developmental pattern,poor wastewater treatment...The present water pollution situation at watershed level in China has been systematically analyzed.The causes of water pollution are attributed to the extensive economic developmental pattern,poor wastewater treatment,and a lack of nonpoint pollution control.The problems of water pollution control at watershed level include a lack of thought and approach,developmental delay in the environmental standard system,an inadequate monitoring ability,and an inefficient implementation of laws and regulations.From 2006 to 2020,water pollution control and governance will be a national key specific project of science and technology in China.The strategies of this project include establishing a water pollution control system at watershed level,orienting a healthy aquatic ecosystem,conducting risk management,and using comprehensive methods.The goal is to establish and complete a technological system of pollution control and management in three five-year phases.The main tasks are to develop common technologies,management systems,and mechanisms for lake eutrophication control,river pollution control,urban water environmental pollution control,potable water safety,and water environmental management.The bottlenecks of water pollution control and management in China could be systematically removed,and the demonstration of the system engineering approach will be conducted at selected key watersheds.展开更多
基金supported by National Natural Science Foundation of China (Grant No.50909063,70771035)Humanities and Social Sciences Foundation provided by Ministry of Education of China (Grant No.07JC790015)Non-profit Industry Financial Program of Ministry Water Resources of China (Grant No.200901044)
文摘In this paper,a new model with a total amount control target of allowable water withdrawal based on initial water right is built for the implementation of initial water right allocation scheme as well as unified allocation for allowable water withdrawal and sewage discharge.The model couples the water allocation simulation model and the computational model of permissible pol-lution bearing capacity.In view of the model complexity,a new technology which synthesizes system simulation,iterative reservoir turns and intelligent computation is proposed to improve the operability of allocation scheme and computational efficiency.Taking the Beijiang River Basin in the Pearl River Basin as an example,the study explains the model establishment,solution and application,and draws an optimized operation graph of large-scale reservoirs.The study also obtains a long-term operation strategy of river basin water resources system,the allocation schemes of allowable water withdrawal and sewage discharge in a typical year and the flow hydrographs of trans-boundary sections.The validity of the model and the allocation rationality are analyzed as well.
基金the project of the National Key Specific Project of Science and Technology of China for“Water Pollution Control and Governance,”“Functional zoning of river basin water ecology and water quality target oriented management technology”(Grant No.2008ZX07526).
文摘The present water pollution situation at watershed level in China has been systematically analyzed.The causes of water pollution are attributed to the extensive economic developmental pattern,poor wastewater treatment,and a lack of nonpoint pollution control.The problems of water pollution control at watershed level include a lack of thought and approach,developmental delay in the environmental standard system,an inadequate monitoring ability,and an inefficient implementation of laws and regulations.From 2006 to 2020,water pollution control and governance will be a national key specific project of science and technology in China.The strategies of this project include establishing a water pollution control system at watershed level,orienting a healthy aquatic ecosystem,conducting risk management,and using comprehensive methods.The goal is to establish and complete a technological system of pollution control and management in three five-year phases.The main tasks are to develop common technologies,management systems,and mechanisms for lake eutrophication control,river pollution control,urban water environmental pollution control,potable water safety,and water environmental management.The bottlenecks of water pollution control and management in China could be systematically removed,and the demonstration of the system engineering approach will be conducted at selected key watersheds.