The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Con...The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Considering that the MSS method suffers from a slow convergence rate or even divergence under some circumstances,a least-squares-based iterative(LSI)method is proposed.Compared with the MSS method,the LSI method modifies the iterative variables in each iteration by solving a least-squares problem with the information in previous iterations.A practical implementation and a parameter tuning strategy for the LSI method are discussed.Furthermore,a LSI-PF method is proposed to solve I-T&D power flow and a LSIheterogeneous decomposition(LSI-HGD)method is proposed to solve optimal power flow.Numerical experiments demonstrate that the proposed LSI-PF and LSI-HGD methods can achieve the same accuracy as the benchmark methods.Meanwhile,these LSI methods,with appropriate settings,significantly enhance the convergence and efficiency of conventional methods.Also,in some cases,where conventional methods diverge,these LSI methods can still converge.展开更多
To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cas...To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cases demonstrate thatan I-ORA is necessary because it provides accurate handlingof the coupling between transmission and distribution networks,accurate analysis of power supply mode (PSM) changes ofimportant users and helps to improve security and stability ofpower grid operations. Two key technical requirements in theI-ORA algorithm are realized, i.e., integrated topology analysisand integrated power flow calculation. Under a certain contingency, integrated topology analysis is used to assess the risksof substation power cuts, network split and PSM changes ofimportant users, while the integrated power flow calculation,based on the self-adaptive Levenburg-Marquard method andNewton method, can be implemented to assess risks of heavyload/overload and voltage deviation. In addition, the graphicsprocessing unit is used to parallelly process some computationintensive steps. Numerical experiments show that the proposedI-ORA algorithm can realize accurate assessment for the entireI-T&D. In addition, the efficiency and convergence are satisfying,indicating the proposed I-ORA algorithm can significantly benefitreal practice in the coordination operation of I-T&D in the future.展开更多
As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are n...As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are not suitable to be studied separately.This paper presents a distributed continuation power flow method for VSA of global transmission and distribution grid.Two different parameterization schemes are adopted to guarantee the coherence of load growth in transmission and distribution grids.In the correction step,the boundary bus voltage,load parameter and equivalent power are communicated between the transmission and distribution control centers to realize the distributed computation of load margin.The optimal multiplier technique is used to improve the convergence of the proposed method.The three-phase unbalanced characteristic of distribution networks and the reactive capability limits of DGs are considered.Simulation results on two integrated transmission and distribution test systems show that the proposed method is effective.展开更多
基金supported by the National Natural Science Foundation of China(52077193).
文摘The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Considering that the MSS method suffers from a slow convergence rate or even divergence under some circumstances,a least-squares-based iterative(LSI)method is proposed.Compared with the MSS method,the LSI method modifies the iterative variables in each iteration by solving a least-squares problem with the information in previous iterations.A practical implementation and a parameter tuning strategy for the LSI method are discussed.Furthermore,a LSI-PF method is proposed to solve I-T&D power flow and a LSIheterogeneous decomposition(LSI-HGD)method is proposed to solve optimal power flow.Numerical experiments demonstrate that the proposed LSI-PF and LSI-HGD methods can achieve the same accuracy as the benchmark methods.Meanwhile,these LSI methods,with appropriate settings,significantly enhance the convergence and efficiency of conventional methods.Also,in some cases,where conventional methods diverge,these LSI methods can still converge.
基金the State Grid Zhejiang Electric Power Co.,Ltd.(Science and Technology Project under Grant 5211JH180081:Research on security evaluation and control technology of smart platform based on dispatch cloud.)。
文摘To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cases demonstrate thatan I-ORA is necessary because it provides accurate handlingof the coupling between transmission and distribution networks,accurate analysis of power supply mode (PSM) changes ofimportant users and helps to improve security and stability ofpower grid operations. Two key technical requirements in theI-ORA algorithm are realized, i.e., integrated topology analysisand integrated power flow calculation. Under a certain contingency, integrated topology analysis is used to assess the risksof substation power cuts, network split and PSM changes ofimportant users, while the integrated power flow calculation,based on the self-adaptive Levenburg-Marquard method andNewton method, can be implemented to assess risks of heavyload/overload and voltage deviation. In addition, the graphicsprocessing unit is used to parallelly process some computationintensive steps. Numerical experiments show that the proposedI-ORA algorithm can realize accurate assessment for the entireI-T&D. In addition, the efficiency and convergence are satisfying,indicating the proposed I-ORA algorithm can significantly benefitreal practice in the coordination operation of I-T&D in the future.
基金This work is supported by National Natural Science Foundation of China(No.51077042,No.51577049)Special Foundation of The doctoral program of Higher Education(No.20120094110008).
文摘As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are not suitable to be studied separately.This paper presents a distributed continuation power flow method for VSA of global transmission and distribution grid.Two different parameterization schemes are adopted to guarantee the coherence of load growth in transmission and distribution grids.In the correction step,the boundary bus voltage,load parameter and equivalent power are communicated between the transmission and distribution control centers to realize the distributed computation of load margin.The optimal multiplier technique is used to improve the convergence of the proposed method.The three-phase unbalanced characteristic of distribution networks and the reactive capability limits of DGs are considered.Simulation results on two integrated transmission and distribution test systems show that the proposed method is effective.