In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expan...In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology.展开更多
The system uses Japanese Mitsubishi PLC as the main control core,and intermediate relay is used for signal acquisition and conversion.The system is mainly composed of data processing module,municipal electricity monit...The system uses Japanese Mitsubishi PLC as the main control core,and intermediate relay is used for signal acquisition and conversion.The system is mainly composed of data processing module,municipal electricity monitoring module,wireless communication module,remote controller,speech recognition module,display module,sensor,switching output module and UPS power supply. The system can automatically start generator for power supply when municipal electricity is failure; when municipal electricity returns to normal,it automatically restores the power supply function of municipal electricity. In order to improve the stability of the system,the system has the functions of fault alarm,remote reset and remote query,etc.,which can realize seamless switching of municipal electricity and generator. It effectively avoids meteorological data loss,data delay,network interruption,etc. caused by unstable municipal electricity,solves the power supply problem of grass-roots meteorological station,especially at night,provides stable power supply for the integrated meteorological observation,forecasting,and early warning service.展开更多
With the rapid development of China's economy, the entire social requires the safety, reliability and automation of power supply and distribution system must be improved. Therefore, extensive application of PLC techn...With the rapid development of China's economy, the entire social requires the safety, reliability and automation of power supply and distribution system must be improved. Therefore, extensive application of PLC technology in power supply and distribution system has great significance to ensure normal social life and production, so as to realize the entire national economy sustained and healthy development. This paper briefly introduces the PLC technology, and with practice elaborates the applications of control technology based on PLC in power supply and distribution system fi:om the reform of low-voltage distribution system, automation management and relay protection of power supply and distribution system etc.展开更多
A 28 V-half-regulated power bus topology and an integrated PCDU (Power Conditioning and Distribution Unit) were adopted to meet the energy demand for the Chang'e 4 relay satellite.This paper first introduces the m...A 28 V-half-regulated power bus topology and an integrated PCDU (Power Conditioning and Distribution Unit) were adopted to meet the energy demand for the Chang'e 4 relay satellite.This paper first introduces the mission features and composition of the PSDS (Power Supply and Distribution System) for the Chang'e 4 relay satellite.Due to this satellite's unusual orbit,operational mode and project restrictions,special analysis and design was conducted on the PSDS from the perspective of weight-reduction,power management,and reliability and so on.Extreme low temperature storage of SA (Solar Array) was considered and how the antenna affects the SA was analyzed.A new kind of high-specific-energy 45 Ah (Ampere-hour) battery cell was used for the first time.To make sure that the satellite would successfully pass the long shadow zones,a 100% DOD (Depth of Discharge) experiment was carried out on the battery.Since the sunlight is almost always available and there are very few times for the battery to charge or discharge,battery care to extend its lifetime is also discussed.PCDU is a device that integrates power conditioning and power distribution in one unit.The PCDU on Chang'e 4 relay satellite can output more power with less weight because of the adoption of a 28 V-half-regulated power bus topology which was also used for the first time and used lighter material for its mechanical framework.Experiment under low temperature on PCDU was conducted as well and a hot backup equalizing charge technique which is beneficial to keep performance of the battery is illustrated.The power distribution module,which is a module of PCDU,enhances the power utilization security by utilizing a static impedance measurement and build-in-test to avoid possible short circuits.As for EED (Electrical Explosive Device) module,a protection plug was specially designed and three switches with different functions were connected in series to prevent the EED from exploding by error.In addition,the allowable minimum EED bus voltage for each EED was evaluated in case of low battery voltage caused by the possible postponement of the launching time.Complete verification experiments on the ground were conducted to confirm the correctness of the design and on-orbit test data conformed to the expected results and theoretical calculation.The power supply and distribution system has been working normally since the day the Chang'e 4 relay satellite was launched into space.展开更多
A novel three-phase traction power supply system is proposed to eliminate the adverse effects caused by electric phase separation in catenary and accomplish a unifying manner of traction power supply for rail transit....A novel three-phase traction power supply system is proposed to eliminate the adverse effects caused by electric phase separation in catenary and accomplish a unifying manner of traction power supply for rail transit.With the application of two-stage three-phase continuous power supply structure,the electrical characteristics exhibit new features differing from the existing traction system.In this work,the principle for voltage levels determining two-stage network is dissected in accordance with the requirements of traction network and electric locomotive.The equivalent model of three-phase traction system is built for deducing the formula of current distribution and voltage losses.Based on the chain network model of the traction network,a simulation model is established to analyze the electrical characteristics such as traction current distribution,voltage losses,system equivalent impedance,voltage distribution,voltage unbalance and regenerative energy utilization.In a few words,quite a lot traction current of about 99%is undertaken by long-section cable network.The proportion of system voltage losses is small attributed to the two-stage three-phase power supply structure,and the voltage unbal-ance caused by impedance asymmetry of traction network is less than 1‰.In addition,the utilization rate of regenerative energy for locomotive achieves a significant promotion of over 97%.展开更多
A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to...A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.展开更多
High-power electric actuators are generally used on solid propellant motors,which further enhances the requirement on onboard supply voltage and output power of a launch vehicle.In this paper,combined with the electri...High-power electric actuators are generally used on solid propellant motors,which further enhances the requirement on onboard supply voltage and output power of a launch vehicle.In this paper,combined with the electrical demand of China’s new generation solid-liquid bundled launch vehicle(LM-6 A),high-voltage battery technology,high-power switch control technology,insulation protection technology under low pressure are studied,and the key technologies and schemes are presented.The flight test of LM-6 A shows that the high-voltage power supply and distribution technology adopted is reasonable and feasible,and can be used as a reference for the designs of other launch vehicles or spacecrafts.展开更多
As a matured technique used in many fields,the distributed computer system is still a new management method for the aeronautical electrical power distribution system in our country. In this paper, a novel aircraft ele...As a matured technique used in many fields,the distributed computer system is still a new management method for the aeronautical electrical power distribution system in our country. In this paper, a novel aircraft electrical power distribution system based on the distributed computer system is proposed. The principles, features and structure of the aircraft electrical power distribution system and the distributed computer system named electrical load management system (ELMS) are studied. The ELMS composed of four electrical load management centers (ELMCs) and two power source processors (PSPs) operates in the 1553B buses. Principles of the ELMCs and the PSPs are introduced. With the application of the distributed computer system, the aircraft electrical power distribution system is simple, adaptable and flexible.展开更多
Conventional maintenance mode for the traction power supply system(TPSS)is to perform scheduled regular maintenance activities for power supply equipment,while such maintenance mode may result in undue maintenance tas...Conventional maintenance mode for the traction power supply system(TPSS)is to perform scheduled regular maintenance activities for power supply equipment,while such maintenance mode may result in undue maintenance tasks and low efficiency due to different degradation processes of different sorts of equipment.To address this problem,this paper introduces a preventive opportunistic maintenance(POM)method for TPSS based on equipment reliability.Firstly,a POM model is established by considering the equipment reliability degradation process based on Weibull distribution.Then,by considering the total power outage time in the planned operation cycle of TPSS as the optimization objective,the optimal maintenance scheme of TPSS is formulated by iterative method of maintenance strategies.The proposed method is verified by introducing practical maintenance strategies and fault record data of the traction transformer,circuit breaker and disconnector in an actual TPSS of a railway administration.Results show that the presented method can make full use of the existing fault data to develop a POM scheme for TPSS.It can improve maintenance efficiency and reduce power outage time,providing guidance to formulate scientific maintenance strategies for TPSS.展开更多
During faults in a distribution network,the output power of a distributed generation(DG)may be uncertain.Moreover,the output currents of distributed power sources are also affected by the output power,resulting in unc...During faults in a distribution network,the output power of a distributed generation(DG)may be uncertain.Moreover,the output currents of distributed power sources are also affected by the output power,resulting in uncertainties in the calculation of the short-circuit current at the time of a fault.Additionally,the impacts of such uncertainties around short-circuit currents will increase with the increase of distributed power sources.Thus,it is very important to develop a method for calculating the short-circuit current while considering the uncertainties in a distribution network.In this study,an affine arithmetic algorithm for calculating short-circuit current intervals in distribution networks with distributed power sources while considering power fluctuations is presented.The proposed algorithm includes two stages.In the first stage,normal operations are considered to establish a conservative interval affine optimization model of injection currents in distributed power sources.Constrained by the fluctuation range of distributed generation power at the moment of fault occurrence,the model can then be used to solve for the fluctuation range of injected current amplitudes in distributed power sources.The second stage is implemented after a malfunction occurs.In this stage,an affine optimization model is first established.This model is developed to characterizes the short-circuit current interval of a transmission line,and is constrained by the fluctuation range of the injected current amplitude of DG during normal operations.Finally,the range of the short-circuit current amplitudes of distribution network lines after a short-circuit fault occurs is predicted.The algorithm proposed in this article obtains an interval range containing accurate results through interval operation.Compared with traditional point value calculation methods,interval calculation methods can provide more reliable analysis and calculation results.The range of short-circuit current amplitude obtained by this algorithm is slightly larger than those obtained using the Monte Carlo algorithm and the Latin hypercube sampling algorithm.Therefore,the proposed algorithm has good suitability and does not require iterative calculations,resulting in a significant improvement in computational speed compared to the Monte Carlo algorithm and the Latin hypercube sampling algorithm.Furthermore,the proposed algorithm can provide more reliable analysis and calculation results,improving the safety and stability of power systems.展开更多
Multi-converter approach based on the series and parallel connection topology of modular power converters has been proposed to realize higher power density DC-DC converter. The availability of the proposed approach ha...Multi-converter approach based on the series and parallel connection topology of modular power converters has been proposed to realize higher power density DC-DC converter. The availability of the proposed approach has been verified through the design consideration and the experiment. The design consideration for two DC-DC converters has been carried out by utilizing the power converter exact loss simulator, and the design parameters to maximize their power densities have been extracted taking the trade-off between the conversion efficiency and the power density into account. The prototypes of a 2,400 W, 256-384 V boost chopper using SiC-MOSFETs and a 300 W, 32-48 V GaN-FETs boost chopper have been also developed based on the design. The SiC chopper achieved the efficiency of 97.8% and the power density of 12,8 W/cm3, and the GaN chopper accomplished 98.9% and 18.6 W/cm3 in the experiment. These results show the validity of the design and the availability of the proposed approach. The multi-converter approach enables the cost reduction of the modular power converters, and contributes to realizing the widespread use of power electronics converters in the future 380 V DC distribution system.展开更多
With the coordinated development of today's social economy with science and technology,various advanced technologies are being used in highway engineering,especially the distributed intelligent power supply techno...With the coordinated development of today's social economy with science and technology,various advanced technologies are being used in highway engineering,especially the distributed intelligent power supply technology in expressway tunnels,which has a very significant advantage.In order to realize the effective application of this technology and promote the power supply effect in expressway tunnel,this study analyzes the advantages of this technology and its application in expressway tunnel,hoping to provide scientific reference for the application of distributed intelligent power supply technology and the engineering development of expressway tunnels.展开更多
The universal mathematical model of an engine is established,and an economical zone,in which an engine mainly provides medium output load at medium speed,is presented.Based on the experimental data and the universal m...The universal mathematical model of an engine is established,and an economical zone,in which an engine mainly provides medium output load at medium speed,is presented.Based on the experimental data and the universal model of such an engine above,a mathematical model of a refitted engine is provided.The boundary of the corresponding economical zone is further demarcated,and the optimal operating curve and the operating point of the engine are analyzed.Then,the energy transforming models of the power system are established in the mode of cooling,heating and power(MCHP),the mode of heating and power(MHP)and the mode of electricity powering(MEP).The parameter matching of the power system is optimized according to the transmission ratios of the gear box in the power distribution system.The results show that,in the MCHP,the speed transmission ratio of the engine to the gear box(ies)and the speed transmission ratio of the motor to the gear box(ims)are defined as 2.9 and 1,respectively;in the MHP,when the demand load of the power system is less than the low critical load of the economical zone,the speed transmission ratio of the motor to the engine(ime)is equal to 1,and when the demand load of the power system exceeds the low critical load of the economical zone,ime equals 0.85;in the MEP,the optimal value of ims is defined as 2.5.展开更多
In this paper, a mathematical analysis of the EMI (Electromagnetic Interference) for a 20 kHz/10 kV capacitor charging power supply in frequency-domain is presented, and a related circuit model considering the transie...In this paper, a mathematical analysis of the EMI (Electromagnetic Interference) for a 20 kHz/10 kV capacitor charging power supply in frequency-domain is presented, and a related circuit model considering the transient switching interference is proposed. Due to the high working frequency and the device-switching transitions, the conducted EMI caused by the charging circuit which includes the harmonics of grid frequency, working frequency and device-switching transition frequencies. Thus under certain working situations or loads parallel power supply, the interference may cause charging failure. To solve this problem, a high frequency transformer modeled with stray capacitances and an approximation of the device-switching transition is applied in the Spice-based simulation model, and a mathematical analysis in frequency-domain is presented.展开更多
文摘In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology.
基金Supported by Youth Technology Foundation Item of Guizhou Meteorological Bureau in 2015(QN201520)
文摘The system uses Japanese Mitsubishi PLC as the main control core,and intermediate relay is used for signal acquisition and conversion.The system is mainly composed of data processing module,municipal electricity monitoring module,wireless communication module,remote controller,speech recognition module,display module,sensor,switching output module and UPS power supply. The system can automatically start generator for power supply when municipal electricity is failure; when municipal electricity returns to normal,it automatically restores the power supply function of municipal electricity. In order to improve the stability of the system,the system has the functions of fault alarm,remote reset and remote query,etc.,which can realize seamless switching of municipal electricity and generator. It effectively avoids meteorological data loss,data delay,network interruption,etc. caused by unstable municipal electricity,solves the power supply problem of grass-roots meteorological station,especially at night,provides stable power supply for the integrated meteorological observation,forecasting,and early warning service.
文摘With the rapid development of China's economy, the entire social requires the safety, reliability and automation of power supply and distribution system must be improved. Therefore, extensive application of PLC technology in power supply and distribution system has great significance to ensure normal social life and production, so as to realize the entire national economy sustained and healthy development. This paper briefly introduces the PLC technology, and with practice elaborates the applications of control technology based on PLC in power supply and distribution system fi:om the reform of low-voltage distribution system, automation management and relay protection of power supply and distribution system etc.
文摘A 28 V-half-regulated power bus topology and an integrated PCDU (Power Conditioning and Distribution Unit) were adopted to meet the energy demand for the Chang'e 4 relay satellite.This paper first introduces the mission features and composition of the PSDS (Power Supply and Distribution System) for the Chang'e 4 relay satellite.Due to this satellite's unusual orbit,operational mode and project restrictions,special analysis and design was conducted on the PSDS from the perspective of weight-reduction,power management,and reliability and so on.Extreme low temperature storage of SA (Solar Array) was considered and how the antenna affects the SA was analyzed.A new kind of high-specific-energy 45 Ah (Ampere-hour) battery cell was used for the first time.To make sure that the satellite would successfully pass the long shadow zones,a 100% DOD (Depth of Discharge) experiment was carried out on the battery.Since the sunlight is almost always available and there are very few times for the battery to charge or discharge,battery care to extend its lifetime is also discussed.PCDU is a device that integrates power conditioning and power distribution in one unit.The PCDU on Chang'e 4 relay satellite can output more power with less weight because of the adoption of a 28 V-half-regulated power bus topology which was also used for the first time and used lighter material for its mechanical framework.Experiment under low temperature on PCDU was conducted as well and a hot backup equalizing charge technique which is beneficial to keep performance of the battery is illustrated.The power distribution module,which is a module of PCDU,enhances the power utilization security by utilizing a static impedance measurement and build-in-test to avoid possible short circuits.As for EED (Electrical Explosive Device) module,a protection plug was specially designed and three switches with different functions were connected in series to prevent the EED from exploding by error.In addition,the allowable minimum EED bus voltage for each EED was evaluated in case of low battery voltage caused by the possible postponement of the launching time.Complete verification experiments on the ground were conducted to confirm the correctness of the design and on-orbit test data conformed to the expected results and theoretical calculation.The power supply and distribution system has been working normally since the day the Chang'e 4 relay satellite was launched into space.
基金This research was supported by the Science and Technology Plan Project of Sichuan Province(No.21YYJC3324)the Science and Technology Plan Project of Sichuan Province(No.2022YFQ0104).
文摘A novel three-phase traction power supply system is proposed to eliminate the adverse effects caused by electric phase separation in catenary and accomplish a unifying manner of traction power supply for rail transit.With the application of two-stage three-phase continuous power supply structure,the electrical characteristics exhibit new features differing from the existing traction system.In this work,the principle for voltage levels determining two-stage network is dissected in accordance with the requirements of traction network and electric locomotive.The equivalent model of three-phase traction system is built for deducing the formula of current distribution and voltage losses.Based on the chain network model of the traction network,a simulation model is established to analyze the electrical characteristics such as traction current distribution,voltage losses,system equivalent impedance,voltage distribution,voltage unbalance and regenerative energy utilization.In a few words,quite a lot traction current of about 99%is undertaken by long-section cable network.The proportion of system voltage losses is small attributed to the two-stage three-phase power supply structure,and the voltage unbal-ance caused by impedance asymmetry of traction network is less than 1‰.In addition,the utilization rate of regenerative energy for locomotive achieves a significant promotion of over 97%.
文摘A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.
文摘High-power electric actuators are generally used on solid propellant motors,which further enhances the requirement on onboard supply voltage and output power of a launch vehicle.In this paper,combined with the electrical demand of China’s new generation solid-liquid bundled launch vehicle(LM-6 A),high-voltage battery technology,high-power switch control technology,insulation protection technology under low pressure are studied,and the key technologies and schemes are presented.The flight test of LM-6 A shows that the high-voltage power supply and distribution technology adopted is reasonable and feasible,and can be used as a reference for the designs of other launch vehicles or spacecrafts.
文摘As a matured technique used in many fields,the distributed computer system is still a new management method for the aeronautical electrical power distribution system in our country. In this paper, a novel aircraft electrical power distribution system based on the distributed computer system is proposed. The principles, features and structure of the aircraft electrical power distribution system and the distributed computer system named electrical load management system (ELMS) are studied. The ELMS composed of four electrical load management centers (ELMCs) and two power source processors (PSPs) operates in the 1553B buses. Principles of the ELMCs and the PSPs are introduced. With the application of the distributed computer system, the aircraft electrical power distribution system is simple, adaptable and flexible.
基金the National Natural Science Foundation of China under Grant(51907166)the Science and Technology Project of CHINA RAILWAY under Grant(2017J001-F&N2018G023)the Sichuan Science and Technology Program under Grant(2018GZ0020).
文摘Conventional maintenance mode for the traction power supply system(TPSS)is to perform scheduled regular maintenance activities for power supply equipment,while such maintenance mode may result in undue maintenance tasks and low efficiency due to different degradation processes of different sorts of equipment.To address this problem,this paper introduces a preventive opportunistic maintenance(POM)method for TPSS based on equipment reliability.Firstly,a POM model is established by considering the equipment reliability degradation process based on Weibull distribution.Then,by considering the total power outage time in the planned operation cycle of TPSS as the optimization objective,the optimal maintenance scheme of TPSS is formulated by iterative method of maintenance strategies.The proposed method is verified by introducing practical maintenance strategies and fault record data of the traction transformer,circuit breaker and disconnector in an actual TPSS of a railway administration.Results show that the presented method can make full use of the existing fault data to develop a POM scheme for TPSS.It can improve maintenance efficiency and reduce power outage time,providing guidance to formulate scientific maintenance strategies for TPSS.
基金This article was supported by the general project“Research on Wind and Photovoltaic Fault Characteristics and Practical Short Circuit Calculation Model”(521820200097)of Jiangxi Electric Power Company.
文摘During faults in a distribution network,the output power of a distributed generation(DG)may be uncertain.Moreover,the output currents of distributed power sources are also affected by the output power,resulting in uncertainties in the calculation of the short-circuit current at the time of a fault.Additionally,the impacts of such uncertainties around short-circuit currents will increase with the increase of distributed power sources.Thus,it is very important to develop a method for calculating the short-circuit current while considering the uncertainties in a distribution network.In this study,an affine arithmetic algorithm for calculating short-circuit current intervals in distribution networks with distributed power sources while considering power fluctuations is presented.The proposed algorithm includes two stages.In the first stage,normal operations are considered to establish a conservative interval affine optimization model of injection currents in distributed power sources.Constrained by the fluctuation range of distributed generation power at the moment of fault occurrence,the model can then be used to solve for the fluctuation range of injected current amplitudes in distributed power sources.The second stage is implemented after a malfunction occurs.In this stage,an affine optimization model is first established.This model is developed to characterizes the short-circuit current interval of a transmission line,and is constrained by the fluctuation range of the injected current amplitude of DG during normal operations.Finally,the range of the short-circuit current amplitudes of distribution network lines after a short-circuit fault occurs is predicted.The algorithm proposed in this article obtains an interval range containing accurate results through interval operation.Compared with traditional point value calculation methods,interval calculation methods can provide more reliable analysis and calculation results.The range of short-circuit current amplitude obtained by this algorithm is slightly larger than those obtained using the Monte Carlo algorithm and the Latin hypercube sampling algorithm.Therefore,the proposed algorithm has good suitability and does not require iterative calculations,resulting in a significant improvement in computational speed compared to the Monte Carlo algorithm and the Latin hypercube sampling algorithm.Furthermore,the proposed algorithm can provide more reliable analysis and calculation results,improving the safety and stability of power systems.
文摘Multi-converter approach based on the series and parallel connection topology of modular power converters has been proposed to realize higher power density DC-DC converter. The availability of the proposed approach has been verified through the design consideration and the experiment. The design consideration for two DC-DC converters has been carried out by utilizing the power converter exact loss simulator, and the design parameters to maximize their power densities have been extracted taking the trade-off between the conversion efficiency and the power density into account. The prototypes of a 2,400 W, 256-384 V boost chopper using SiC-MOSFETs and a 300 W, 32-48 V GaN-FETs boost chopper have been also developed based on the design. The SiC chopper achieved the efficiency of 97.8% and the power density of 12,8 W/cm3, and the GaN chopper accomplished 98.9% and 18.6 W/cm3 in the experiment. These results show the validity of the design and the availability of the proposed approach. The multi-converter approach enables the cost reduction of the modular power converters, and contributes to realizing the widespread use of power electronics converters in the future 380 V DC distribution system.
文摘With the coordinated development of today's social economy with science and technology,various advanced technologies are being used in highway engineering,especially the distributed intelligent power supply technology in expressway tunnels,which has a very significant advantage.In order to realize the effective application of this technology and promote the power supply effect in expressway tunnel,this study analyzes the advantages of this technology and its application in expressway tunnel,hoping to provide scientific reference for the application of distributed intelligent power supply technology and the engineering development of expressway tunnels.
基金The Natural Science Foundation of Jiangsu Higher Education Institutions of China(No.2009112TSJ0124)
文摘The universal mathematical model of an engine is established,and an economical zone,in which an engine mainly provides medium output load at medium speed,is presented.Based on the experimental data and the universal model of such an engine above,a mathematical model of a refitted engine is provided.The boundary of the corresponding economical zone is further demarcated,and the optimal operating curve and the operating point of the engine are analyzed.Then,the energy transforming models of the power system are established in the mode of cooling,heating and power(MCHP),the mode of heating and power(MHP)and the mode of electricity powering(MEP).The parameter matching of the power system is optimized according to the transmission ratios of the gear box in the power distribution system.The results show that,in the MCHP,the speed transmission ratio of the engine to the gear box(ies)and the speed transmission ratio of the motor to the gear box(ims)are defined as 2.9 and 1,respectively;in the MHP,when the demand load of the power system is less than the low critical load of the economical zone,the speed transmission ratio of the motor to the engine(ime)is equal to 1,and when the demand load of the power system exceeds the low critical load of the economical zone,ime equals 0.85;in the MEP,the optimal value of ims is defined as 2.5.
文摘In this paper, a mathematical analysis of the EMI (Electromagnetic Interference) for a 20 kHz/10 kV capacitor charging power supply in frequency-domain is presented, and a related circuit model considering the transient switching interference is proposed. Due to the high working frequency and the device-switching transitions, the conducted EMI caused by the charging circuit which includes the harmonics of grid frequency, working frequency and device-switching transition frequencies. Thus under certain working situations or loads parallel power supply, the interference may cause charging failure. To solve this problem, a high frequency transformer modeled with stray capacitances and an approximation of the device-switching transition is applied in the Spice-based simulation model, and a mathematical analysis in frequency-domain is presented.