期刊文献+
共找到6篇文章
< 1 >
每页显示 20 50 100
Design of unballasted track bridges on Beijing——Tianjin intercity railway 被引量:3
1
作者 Sun Shuli Zhang Wenjian Wang Zhaohu Su Wei Wu Cailan Bu Qinghao 《Engineering Sciences》 EI 2011年第4期59-70,共12页
Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requir... Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requirements of safety,comfort and stability of the train under high-speed condition. At the same time,concepts of environmental adaptability,service to transportation and comprehensive benefits were observed. On the whole line,long-bridge schemes were adopted and the most advanced technologies of unballasted track were utilized on bridges,the length of which accounts for 87.7 % of the total line. The success of design and construction of the bridges on this rail has accumulated valuable experience for high-speed railway construction on a large scale in the future,and made it a marking,demonstrating,and model project to follow. 展开更多
关键词 Beijing--Tianjin intercity railway unballasted track bridge design concept
下载PDF
Observation and evaluation of bridge settlement in Beijing—Tianjin intercity railway
2
作者 Ding Yuanwen 《Engineering Sciences》 EI 2012年第1期56-60,共5页
Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determi... Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example. 展开更多
关键词 Beijing--Tianjin intercity railway BRIDGE settlement monitoring EVALUATION
下载PDF
Study on Urbanization Development Strategy along Wuhan to Xianning Intercity Rail
3
作者 Senwen Shi Junqing Zhou 《Journal of Civil Engineering and Architecture》 2014年第8期1048-1055,共8页
As the development of"two-oriented society" in Wuhan urban agglomeration, the intercity railway will be an important way of driving the development of urbanization in Wuhan urban agglomeration. Intercity railway sho... As the development of"two-oriented society" in Wuhan urban agglomeration, the intercity railway will be an important way of driving the development of urbanization in Wuhan urban agglomeration. Intercity railway shortens the time in traffic between surrounding cities of Wuhan and it brings a lot of people, materials and information. It has also brought opportunities and challenges to the areas along intercity railway. The question is how to seize the development opportunities and coordinate the contradiction between development and environmental protection, and taking a new type urbanization. The paper, studying on the areas along Wuhan to Xianning intercity railway, made a summary of the objective law of urbanization and the influence to the along areas by the intercity railway, meanwhile, had experienced from the developed areas which along the intercity railway both in China and abroad. Then the paper proposed the urbanization development strategy from the aspect of land use, industry, population and transportation on the basis of analysis to be economic base and development conditions of the areas. 展开更多
关键词 intercity railway URBANIZATION STRATEGY
下载PDF
Systematic Research and Innovation Practice on New Concepts of Construction for Xiong'an Railway Station
4
作者 ZHANG Guangping XUE Hailong WNG Yang 《Chinese Railways》 2022年第1期38-47,共10页
As the first major transport infirastructure in Xiong'an New Area,Beijing-Xiong an Intercity Railway is an important step for China State Railway Group Co.A Ltd.to quickly implement the major strategic plan of CPC... As the first major transport infirastructure in Xiong'an New Area,Beijing-Xiong an Intercity Railway is an important step for China State Railway Group Co.A Ltd.to quickly implement the major strategic plan of CPC Central Committee and the State Council.for the establishment of Xiong'an New Area.Xiong'an Station with double-floor spacious waiting areas and the wonderfiul integration of overpass and station building is the first modern integrated transport hub of this kind in China.Based on the characteristics of Xiong'an Station and in the light of the relevant new theories,methods and technologies,systematic studies and innovative practices on the new concept of building up a"well-connected,filly-integrated,environmen-frindly,passenger-oriented,economically-efficient,uurally-rich,intelligent and convenient"passenger station are carried oul,which achieve good results of application and help accumulate valuable experiences for the construction of passenger stations of Chinese high-speed railways in the new era. 展开更多
关键词 Beijing-Xiong'an intercity railway Xiong'an Station new concept construction of passenger station management innovation BIM
下载PDF
城际铁路动车组运用计划模型 被引量:6
5
作者 曲思源 徐行方 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2010年第9期1298-1302,共5页
在分析动车组运用模型的基础上,对有关基本概念进行了界定和解析.结合城际铁路动车组运用特征,将动车组运用计划编制问题转化为交路段生成和基于交路段生成两个问题分步求解,并使用紧凑指派算法和矩阵相结合以及基于运用时间均衡交路段... 在分析动车组运用模型的基础上,对有关基本概念进行了界定和解析.结合城际铁路动车组运用特征,将动车组运用计划编制问题转化为交路段生成和基于交路段生成两个问题分步求解,并使用紧凑指派算法和矩阵相结合以及基于运用时间均衡交路段互换的方法,建立城际铁路动车组运用计划周期模型.以既有繁忙干线沪宁线2009年4月列车运行图为例加以验证,得到了符合城际铁路动车组具体运用的满意结果.该模型和算法的采用将为动车组运用计划的编制起到很好的借鉴作用. 展开更多
关键词 城际铁路 动车组 运用计划 交路段 交路
下载PDF
Field acoustic measurements of high-speed train sound along BTIR 被引量:2
6
作者 YU HuaHua LI JiaChun 《Science China(Physics,Mechanics & Astronomy)》 SCIE EI CAS 2013年第2期474-482,共9页
In this paper,single-point field measurements of noise radiated from high-speed trains were performed at two sites along Beijing-Tianjin intercity railway(BTIR),aiming at acquiring the realistic acoustic data for vali... In this paper,single-point field measurements of noise radiated from high-speed trains were performed at two sites along Beijing-Tianjin intercity railway(BTIR),aiming at acquiring the realistic acoustic data for validation and verification of physical model and computational prediction.The measurements showed that A-weighted sound pressure levels(SPLs) were between 80 and 87 dBA as trains passed.The maximum noise occurred at the moment when the pantograph arrived,suggesting that pantograph noise was one of the most significant sources.Sound radiated from high-speed trains of BTIR was a typical broadband spectrum with most acoustic power restricted in the range of medium-high frequency from about 400 Hz to 5 kHz.Aerodynamic noise was shown to be the dominant one over other acoustic sources for high-speed trains. 展开更多
关键词 field measurement noise level Beijing-Tianjin intercity railway high-speed trains
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部