Using the matrix measure and delay differential inequality, the sufficient conditions were obtained for exponential stability of interval dynamical system with multidelay. These conditions are an improvement and exten...Using the matrix measure and delay differential inequality, the sufficient conditions were obtained for exponential stability of interval dynamical system with multidelay. These conditions are an improvement and extension of the results achieved in earlier papers presented by LIAO, LIU, ZHANG, SUN, et al.展开更多
A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A gene...A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A genetic algorithm is developed to find a schedule at each rescheduling point for both original orders and new orders that both production idle time and penalties on tardiness and earliness of orders are minimized. The proposed methodology is tested on a small example to illustrate the effect of the frozen interval. The results indicate that the suggested approach can improve the schedule stability while retaining efficiency.展开更多
An interval optimization method for the dynamic response of structures with inter- val parameters is presented.The matrices of structures with interval parameters are given.Com- bining the interval extension with the ...An interval optimization method for the dynamic response of structures with inter- val parameters is presented.The matrices of structures with interval parameters are given.Com- bining the interval extension with the perturbation,the method for interval dynamic response analysis is derived.The interval optimization problem is transformed into a corresponding de- terministic one.Because the mean values and the uncertainties of the interval parameters can be elected design variables,more information of the optimization results can be obtained by the present method than that obtained by the deterministic one.The present method is implemented for a truss structure.The numerical results show that the method is effective.展开更多
A conveyor belt driven by wound rotor motors produces dynamic tension, velocity and accelerationduring starting. The terrible situation (such as resonance) in dynamic analysis and design is that system naturalfrequenc...A conveyor belt driven by wound rotor motors produces dynamic tension, velocity and accelerationduring starting. The terrible situation (such as resonance) in dynamic analysis and design is that system naturalfrequencies are equal to those for switching off electric resistances. This paper analyzes and determines systemnatural frequencies based on a modeling method of receptances with the analysis of sub-systems model and of theprinciple of their addition and conveyor loop closure. It also puts forward to calculate the time interval for switching off electric resistances. The starting of one conveyor is simulated by lumped-mass-spring-model software tofurther illustrate the influence of time interval for switching off electric resistances on conveyor dynamic behavior. Two methods are also compared. The receptance model is proved to be an excellent alternative.展开更多
Interval index structure plays an important role in constraint database systems. A dynamic interval index structure DM-tree is presented in this paper. The advantage of the DM-tree compared with other interval index ...Interval index structure plays an important role in constraint database systems. A dynamic interval index structure DM-tree is presented in this paper. The advantage of the DM-tree compared with other interval index structures is that the dynamic operations of insertion and deletion can be operated on the new structure. The storage complexity of the tree is O(n), and the query I/O complexity is O(log n+t/B). To improve the performance of the inserting and deleting operations, some methods such as neighbored-constraint and update-late are applied. The I / O complexity of inserting and deleting operations is the same as that in B-tree, i.e., O(log n).展开更多
A new finite element method (FEM) of B-spline wavelet on the interval (BSWI) is proposed. Through analyzing the scaling functions of BSWI in one dimension, the basic formula for 2D FEM of BSWI is deduced. The 2D F...A new finite element method (FEM) of B-spline wavelet on the interval (BSWI) is proposed. Through analyzing the scaling functions of BSWI in one dimension, the basic formula for 2D FEM of BSWI is deduced. The 2D FEM of 7 nodes and 10 nodes are constructed based on the basic formula. Using these proposed elements, the multiscale numerical model for foundation subjected to harmonic periodic load, the foundation model excited by external and internal dynamic load are studied. The results show the pro- posed finite elements have higher precision than the tradi- tional elements with 4 nodes. The proposed finite elements can describe the propagation of stress waves well whenever the foundation model excited by extemal or intemal dynamic load. The proposed finite elements can be also used to con- nect the multi-scale elements. And the proposed finite elements also have high precision to make multi-scale analysis for structure.展开更多
This paper describes the procedure of using the GM (1,1) weighted Markov chain (GMWMC) to forecast the utility water supply, a quantity that usually has significant temporal variability. The GMWMC is formulated into f...This paper describes the procedure of using the GM (1,1) weighted Markov chain (GMWMC) to forecast the utility water supply, a quantity that usually has significant temporal variability. The GMWMC is formulated into five steps: (1) use GM (1,1) to fit the trend of the data, and obtain the relative error of the fitted values; (2) divide the relative error into ‘state’ data based on pre-set intervals; (3) calibrate the weighted Markov chain model: herein the parameters are the pre-set interval and the step of transition matrix (TM); (4) by using auto-correlation coefficient as the weight, the Markov chain provides the prediction interval. Then the mid-value of the interval is selected as the relative error for the data. Upon combining the data and its relative error, the predicted magnitude in a specific time period is obtained; and, (5) validate the model. Commonly, static intervals are used in both model calibration and validation stages, usually causing large errors. Thus, a dynamic adjustment interval (DAI) is proposed for a better performance. The proposed procedure is described and demonstrated through a case study, which shows that the DAI can usually achieve a better performance than the static interval, and the best TM may exist for certain data.展开更多
文摘Using the matrix measure and delay differential inequality, the sufficient conditions were obtained for exponential stability of interval dynamical system with multidelay. These conditions are an improvement and extension of the results achieved in earlier papers presented by LIAO, LIU, ZHANG, SUN, et al.
基金This project is supported by the Hong Kong Polytechnic University,China(No,G-RGF9).
文摘A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A genetic algorithm is developed to find a schedule at each rescheduling point for both original orders and new orders that both production idle time and penalties on tardiness and earliness of orders are minimized. The proposed methodology is tested on a small example to illustrate the effect of the frozen interval. The results indicate that the suggested approach can improve the schedule stability while retaining efficiency.
基金Project supported by the National Natural Science Foundation of China(No.10202006).
文摘An interval optimization method for the dynamic response of structures with inter- val parameters is presented.The matrices of structures with interval parameters are given.Com- bining the interval extension with the perturbation,the method for interval dynamic response analysis is derived.The interval optimization problem is transformed into a corresponding de- terministic one.Because the mean values and the uncertainties of the interval parameters can be elected design variables,more information of the optimization results can be obtained by the present method than that obtained by the deterministic one.The present method is implemented for a truss structure.The numerical results show that the method is effective.
文摘A conveyor belt driven by wound rotor motors produces dynamic tension, velocity and accelerationduring starting. The terrible situation (such as resonance) in dynamic analysis and design is that system naturalfrequencies are equal to those for switching off electric resistances. This paper analyzes and determines systemnatural frequencies based on a modeling method of receptances with the analysis of sub-systems model and of theprinciple of their addition and conveyor loop closure. It also puts forward to calculate the time interval for switching off electric resistances. The starting of one conveyor is simulated by lumped-mass-spring-model software tofurther illustrate the influence of time interval for switching off electric resistances on conveyor dynamic behavior. Two methods are also compared. The receptance model is proved to be an excellent alternative.
基金Supported by the National Natural Science Foundation of China under grant !Nos.69933010 and69773012.
文摘Interval index structure plays an important role in constraint database systems. A dynamic interval index structure DM-tree is presented in this paper. The advantage of the DM-tree compared with other interval index structures is that the dynamic operations of insertion and deletion can be operated on the new structure. The storage complexity of the tree is O(n), and the query I/O complexity is O(log n+t/B). To improve the performance of the inserting and deleting operations, some methods such as neighbored-constraint and update-late are applied. The I / O complexity of inserting and deleting operations is the same as that in B-tree, i.e., O(log n).
基金supported by the National Natural Science Foundation of China (51109029,51178081,51138001,and 51009020)the State Key Development Program for Basic Research of China (2013CB035905)
文摘A new finite element method (FEM) of B-spline wavelet on the interval (BSWI) is proposed. Through analyzing the scaling functions of BSWI in one dimension, the basic formula for 2D FEM of BSWI is deduced. The 2D FEM of 7 nodes and 10 nodes are constructed based on the basic formula. Using these proposed elements, the multiscale numerical model for foundation subjected to harmonic periodic load, the foundation model excited by external and internal dynamic load are studied. The results show the pro- posed finite elements have higher precision than the tradi- tional elements with 4 nodes. The proposed finite elements can describe the propagation of stress waves well whenever the foundation model excited by extemal or intemal dynamic load. The proposed finite elements can be also used to con- nect the multi-scale elements. And the proposed finite elements also have high precision to make multi-scale analysis for structure.
基金Project supported by the National Natural Science Foundation of China (No. 50778121)the National Basic Research Program of China (No. 2007CB407306-1)the National Water Pollution Control and Management of Science and Technology Project of China (No. 2008ZX07317-005)
文摘This paper describes the procedure of using the GM (1,1) weighted Markov chain (GMWMC) to forecast the utility water supply, a quantity that usually has significant temporal variability. The GMWMC is formulated into five steps: (1) use GM (1,1) to fit the trend of the data, and obtain the relative error of the fitted values; (2) divide the relative error into ‘state’ data based on pre-set intervals; (3) calibrate the weighted Markov chain model: herein the parameters are the pre-set interval and the step of transition matrix (TM); (4) by using auto-correlation coefficient as the weight, the Markov chain provides the prediction interval. Then the mid-value of the interval is selected as the relative error for the data. Upon combining the data and its relative error, the predicted magnitude in a specific time period is obtained; and, (5) validate the model. Commonly, static intervals are used in both model calibration and validation stages, usually causing large errors. Thus, a dynamic adjustment interval (DAI) is proposed for a better performance. The proposed procedure is described and demonstrated through a case study, which shows that the DAI can usually achieve a better performance than the static interval, and the best TM may exist for certain data.