Town Planning Board of Zhaoqing passed the Planning and Design of Xiawan Urban Wetland Park in Zhaoqing City in 2012,and Xiawan Reservoir,located at the junction of Duanzhou District and Dinghu District,would be built...Town Planning Board of Zhaoqing passed the Planning and Design of Xiawan Urban Wetland Park in Zhaoqing City in 2012,and Xiawan Reservoir,located at the junction of Duanzhou District and Dinghu District,would be built into a wetland park at that time.To understand water quality status near the wetland park,according to relevant requirements of the Technical Guidelines for Environmental Impact Assessment:Surface Water Environment(HJ/T 2.3-93),the Environmental Quality Standards for Surface Water(GB 3838-2002),and the Technical Specification for Environmental Monitoring issued by the State Environmental Protection Administration,Xiawan Reservoir,Houlichong and the Xijiang River were investigated,monitored and evaluated.展开更多
基金Supported by Characteristic Innovative Projects of Guangdong Department of Education(Natural Science)(2018KTSCX251)Guangdong Key Laboratory of Environmental Health and Resource Utilization(2020B121201014)+1 种基金Innovation and Entrepreneurship Training Program for College Students of Zhaoqing University in 2020(S202010580063)Quality Engineering and Teaching Reform Project of Zhaoqing University(zlgc 201931)。
文摘Town Planning Board of Zhaoqing passed the Planning and Design of Xiawan Urban Wetland Park in Zhaoqing City in 2012,and Xiawan Reservoir,located at the junction of Duanzhou District and Dinghu District,would be built into a wetland park at that time.To understand water quality status near the wetland park,according to relevant requirements of the Technical Guidelines for Environmental Impact Assessment:Surface Water Environment(HJ/T 2.3-93),the Environmental Quality Standards for Surface Water(GB 3838-2002),and the Technical Specification for Environmental Monitoring issued by the State Environmental Protection Administration,Xiawan Reservoir,Houlichong and the Xijiang River were investigated,monitored and evaluated.