In order to solve internal logistics problems of iron and steel works,such as low transportation efficiency of vehicles and high transportation cost,the production process and traditional transportation style of iron ...In order to solve internal logistics problems of iron and steel works,such as low transportation efficiency of vehicles and high transportation cost,the production process and traditional transportation style of iron and steel works were introduced.The internal transport tasks of iron and steel works were grouped based on cluster analysis according to demand time of the transportation.An improved vehicle scheduling model of semi-trailer swap transport among loading nodes and unloading nodes in one task group was set up.The algorithm was designed to solve the vehicle routing problem with simultaneous pick-up and delivery(VRPSPD) problem based on semi-trailer swap transport.A solving program was written by MATLAB software and the method to figure out the optimal path of each grouping was obtained.The dropping and pulling transportation plan of the tractor was designed.And an example of semi-trailer swap transport in iron and steel works was given.The results indicate that semi-trailer swap transport can decrease the numbers of vehicles and drivers by 54.5% and 88.6% respectively compared with decentralized scheduling in iron and steel works,and the total distance traveled reduces by 43.5%.The semi-trailer swap transport can help the iron and steel works develop the production in intension.展开更多
The necessity of establishing gas protection station in iron and steel works is demonstrated,issues of strengthening the management of gas safety protection,studying new technology of gas protection,adapting to the ne...The necessity of establishing gas protection station in iron and steel works is demonstrated,issues of strengthening the management of gas safety protection,studying new technology of gas protection,adapting to the needs of modernization and building large scale and intelligent iron and steel works are discussed.Relevant sug-gestions are also put forward.展开更多
The by-product gases, which are generated in ironmaking, coking and steel making processes, can be used as fuel for the metallurgical processes and on-site power plants. However, if the supply and demand of by-product...The by-product gases, which are generated in ironmaking, coking and steel making processes, can be used as fuel for the metallurgical processes and on-site power plants. However, if the supply and demand of by-product gases are imbalanced, gas flaring may occur, leading to energy wastage and environmental pollution. Therefore, optimal scheduling of by-product gases is important in iron and steel works. A BP_LSSVM model, which combines back-propagation (BP) neural network and least squares support vector machine (LSSVM), and an improved mixed integer linear programming model were proposed to forecast the surplus gases and allocate them optimally. To maximize energy utilization, the stability of gas holders and boilers was considered and a concise heuristic procedure was proposed to assign penalties for boilers and gas holders. Moreover, the optimal level of gas holder was studied to enhance the stability of the gas system. Compared to the manual operation, the optimal results showed that the electricity generated by the power plant increased by 2.93% in normal condition and by 22.2% in overhaul condition. The proposed model minimizes the total cost by optimizing the boiler load with less adjustment frequency and the stability of gas holders and can be used as a guidance in dynamic forecasting and optimal scheduling of by-product gases in integrated iron and steel works.展开更多
基金Project(70671108) supported by the National Natural Science Foundation of China
文摘In order to solve internal logistics problems of iron and steel works,such as low transportation efficiency of vehicles and high transportation cost,the production process and traditional transportation style of iron and steel works were introduced.The internal transport tasks of iron and steel works were grouped based on cluster analysis according to demand time of the transportation.An improved vehicle scheduling model of semi-trailer swap transport among loading nodes and unloading nodes in one task group was set up.The algorithm was designed to solve the vehicle routing problem with simultaneous pick-up and delivery(VRPSPD) problem based on semi-trailer swap transport.A solving program was written by MATLAB software and the method to figure out the optimal path of each grouping was obtained.The dropping and pulling transportation plan of the tractor was designed.And an example of semi-trailer swap transport in iron and steel works was given.The results indicate that semi-trailer swap transport can decrease the numbers of vehicles and drivers by 54.5% and 88.6% respectively compared with decentralized scheduling in iron and steel works,and the total distance traveled reduces by 43.5%.The semi-trailer swap transport can help the iron and steel works develop the production in intension.
文摘The necessity of establishing gas protection station in iron and steel works is demonstrated,issues of strengthening the management of gas safety protection,studying new technology of gas protection,adapting to the needs of modernization and building large scale and intelligent iron and steel works are discussed.Relevant sug-gestions are also put forward.
基金National Natural Science Foundation of China (No. 51874095)the National Key Research and Development Program (Project Nos. 2016YFB0601305 and 2016YFB0601301).
文摘The by-product gases, which are generated in ironmaking, coking and steel making processes, can be used as fuel for the metallurgical processes and on-site power plants. However, if the supply and demand of by-product gases are imbalanced, gas flaring may occur, leading to energy wastage and environmental pollution. Therefore, optimal scheduling of by-product gases is important in iron and steel works. A BP_LSSVM model, which combines back-propagation (BP) neural network and least squares support vector machine (LSSVM), and an improved mixed integer linear programming model were proposed to forecast the surplus gases and allocate them optimally. To maximize energy utilization, the stability of gas holders and boilers was considered and a concise heuristic procedure was proposed to assign penalties for boilers and gas holders. Moreover, the optimal level of gas holder was studied to enhance the stability of the gas system. Compared to the manual operation, the optimal results showed that the electricity generated by the power plant increased by 2.93% in normal condition and by 22.2% in overhaul condition. The proposed model minimizes the total cost by optimizing the boiler load with less adjustment frequency and the stability of gas holders and can be used as a guidance in dynamic forecasting and optimal scheduling of by-product gases in integrated iron and steel works.