In this study, irrigation modules calculated in planning and actualized operational stage of the irrigation networks are examined. Irrigation module used irrigation networks is a constant discharge parameter, meeting ...In this study, irrigation modules calculated in planning and actualized operational stage of the irrigation networks are examined. Irrigation module used irrigation networks is a constant discharge parameter, meeting the needs of irrigation water requirement smonthly of crops in one hectare of irrigation area and it is a constant discharge flowing continuously for a month. Extent of the overlapping between the irrigation planning module and the operation module actualized during the operational stage of the irrigation network depends on changes in the cropping patterns, differences in the effects of field irrigation methods used by farmers on the capacity of the constructed system, the increases or decreases in the water demands depending on the irrigation period, as well as the extent of sustainability according to the selected operation method. A2 irrigation area of Aydin plain irrigation network, locating in the Büyük Menderes basin, Turkey is selected as study area, with an area of 2500 ha. Irrigation planning module calculated for this network is q = 1.16 l/s/ha and it has been designed as per the supply demand operation method. For the study;actualized irrigation module in the operation stage has been compared with the planning irrigation module by using Excel software and taking parameters such as actual crop pattern and percentage distributions, actualized irrigated areas, irrigation networks and water distribution, water intake of irrigation networks which have been calculated without operation losses, as well as with 5%, 10%, and 15% operation losses. The July operation module calculated for the examined irrigation network generally conforms to the planning module, as it has received the values close to or below the value of irrigation planning modules.展开更多
文摘In this study, irrigation modules calculated in planning and actualized operational stage of the irrigation networks are examined. Irrigation module used irrigation networks is a constant discharge parameter, meeting the needs of irrigation water requirement smonthly of crops in one hectare of irrigation area and it is a constant discharge flowing continuously for a month. Extent of the overlapping between the irrigation planning module and the operation module actualized during the operational stage of the irrigation network depends on changes in the cropping patterns, differences in the effects of field irrigation methods used by farmers on the capacity of the constructed system, the increases or decreases in the water demands depending on the irrigation period, as well as the extent of sustainability according to the selected operation method. A2 irrigation area of Aydin plain irrigation network, locating in the Büyük Menderes basin, Turkey is selected as study area, with an area of 2500 ha. Irrigation planning module calculated for this network is q = 1.16 l/s/ha and it has been designed as per the supply demand operation method. For the study;actualized irrigation module in the operation stage has been compared with the planning irrigation module by using Excel software and taking parameters such as actual crop pattern and percentage distributions, actualized irrigated areas, irrigation networks and water distribution, water intake of irrigation networks which have been calculated without operation losses, as well as with 5%, 10%, and 15% operation losses. The July operation module calculated for the examined irrigation network generally conforms to the planning module, as it has received the values close to or below the value of irrigation planning modules.