In this paper, a novel optimum island partition model based on Tree Knapsack Problem (TKP) is presented for the distribution system integrated with distributed generation (DG), and a Depth-first Dynamic Programming Al...In this paper, a novel optimum island partition model based on Tree Knapsack Problem (TKP) is presented for the distribution system integrated with distributed generation (DG), and a Depth-first Dynamic Programming Algorithm (DPA) is used to solve this model. With the considerations of the load priority, controlled/uncontrolled loads, and the constraints of power balance, voltage and equipment capacity, the model can meet the practical engineering requirements very well. The island partition problem of the distribution system integrated with multiple DGs is first decomposed into multiple TKPs, each of which is solved by DPA respectively. Then, the initial optimum island partition scheme is gained through an island combination procedure, and the final island partition scheme is obtained after feasibility checking and adjustment. Since the algorithm proposed owns the advantages of strong theoretical foundation and low computational complexity, it can find the approximate optimal solution within a limited time. The results of examples demonstrate the validity of the new model and algorithm.展开更多
A connected and undirected graph model of active distribution networks with considering the function of interconnecting switches is constructed in this paper.Based on this model,the island partition problem of active ...A connected and undirected graph model of active distribution networks with considering the function of interconnecting switches is constructed in this paper.Based on this model,the island partition problem of active distribution networks can be described as a 1-neighbour knapsack problem.An effective heuristic algorithm named prospective greedy algorithm is then proposed to solve this problem.Case studies on PG&E 69-bus network show the validity of the proposed model and algorithm.展开更多
The penetration of renewable generation will affect the energy utilization efficiency,economic benefit and reliability of the active distribution network(ADN).This paper proposes a time-sequence production simulation(...The penetration of renewable generation will affect the energy utilization efficiency,economic benefit and reliability of the active distribution network(ADN).This paper proposes a time-sequence production simulation(TSPS)method for re-newable generation capacity and reliability assessments in ADN considering two operational status:the normal status and the fault status.During normal operation,an optimal dispatch model is proposed to promote the renewable consumption and increase the economic benefit.When a failure occurs,the renewable generators are partitioned into islands for resilient power supply and reliability improvement.A novel dynamic island partition model is presented based on mixed integer second-order cone programming(MISOCP).The effectiveness of the proposed TSPS method is demonstrated in a standard network integrated with historical data of load and renewable generations.展开更多
文摘In this paper, a novel optimum island partition model based on Tree Knapsack Problem (TKP) is presented for the distribution system integrated with distributed generation (DG), and a Depth-first Dynamic Programming Algorithm (DPA) is used to solve this model. With the considerations of the load priority, controlled/uncontrolled loads, and the constraints of power balance, voltage and equipment capacity, the model can meet the practical engineering requirements very well. The island partition problem of the distribution system integrated with multiple DGs is first decomposed into multiple TKPs, each of which is solved by DPA respectively. Then, the initial optimum island partition scheme is gained through an island combination procedure, and the final island partition scheme is obtained after feasibility checking and adjustment. Since the algorithm proposed owns the advantages of strong theoretical foundation and low computational complexity, it can find the approximate optimal solution within a limited time. The results of examples demonstrate the validity of the new model and algorithm.
文摘A connected and undirected graph model of active distribution networks with considering the function of interconnecting switches is constructed in this paper.Based on this model,the island partition problem of active distribution networks can be described as a 1-neighbour knapsack problem.An effective heuristic algorithm named prospective greedy algorithm is then proposed to solve this problem.Case studies on PG&E 69-bus network show the validity of the proposed model and algorithm.
基金This work was supported in part by the National Key Research and Development Program of China(Grant No.2016YFB0900100)the National Natural Science Foundation of China(Grant No.51807051)the Natural Science Foundation of Jiangsu Province(Grant No.BK20180507).
文摘The penetration of renewable generation will affect the energy utilization efficiency,economic benefit and reliability of the active distribution network(ADN).This paper proposes a time-sequence production simulation(TSPS)method for re-newable generation capacity and reliability assessments in ADN considering two operational status:the normal status and the fault status.During normal operation,an optimal dispatch model is proposed to promote the renewable consumption and increase the economic benefit.When a failure occurs,the renewable generators are partitioned into islands for resilient power supply and reliability improvement.A novel dynamic island partition model is presented based on mixed integer second-order cone programming(MISOCP).The effectiveness of the proposed TSPS method is demonstrated in a standard network integrated with historical data of load and renewable generations.