The uplift resistance calculation is an important basis for the construction decisions of the jack-up wind installation vessel and the design of the jacking system,and determines the operation risk and reliability in ...The uplift resistance calculation is an important basis for the construction decisions of the jack-up wind installation vessel and the design of the jacking system,and determines the operation risk and reliability in the installation process of the wind turbine. The influence factors of the pile shoe's penetration depth and uplift resistance are analyzed,and the calculation model and flow of the uplift resistance are given. Based on a construction example,the influence rules are analyzed for the change of the pile shoe's structural parameters on the penetration depth and uplift resistance.The analysis results show that the penetration depth is more sensitive to the width of the pile shoe,and the height has greater influence on the uplift resistance than the length and width of the spud. With the increase of the height,the uplift resistance may increase rapidly.Although the decreases of the length,width and height of the pile shoe may reduce the uplift resistance,the penetration depth may increase in the meantime. This will increase the pulling pile time and reduce the construction efficiency. So the parameters of the pile shoe should be optimized according to the adaptable geology condition so as to obtain the optimal uplift resistance and working efficiency.展开更多
The increase in capacity of displacement piles with time after installation is typically known as soil/pile set-up. A full-scale field test is carried out to observe the set-up effect for open-ended concrete pipe pile...The increase in capacity of displacement piles with time after installation is typically known as soil/pile set-up. A full-scale field test is carried out to observe the set-up effect for open-ended concrete pipe piles jacked into mixed soils. Both the total capacity and the average unit shaft resistance increase approximately linearly with logarithmic time. The average increase rate for unit shaft resistance is 44% per log cycle, while the average increase for total capacity is approximately 21%. A review on case histories for long-term set-up indicates an average set-up rate of approximately 40%. Based on this, the mechanism of pile set-up is discussed in detail and a three-phase model is suggested.展开更多
基金Department of Transportation Technology of Construction Project,China(No.2013328225080)Natural Science Foundation of Liaoning Province,China(No.2015020121)the Fundamental Research Funds for the Central Universities,China(Nos.3132015087,3132014303)
文摘The uplift resistance calculation is an important basis for the construction decisions of the jack-up wind installation vessel and the design of the jacking system,and determines the operation risk and reliability in the installation process of the wind turbine. The influence factors of the pile shoe's penetration depth and uplift resistance are analyzed,and the calculation model and flow of the uplift resistance are given. Based on a construction example,the influence rules are analyzed for the change of the pile shoe's structural parameters on the penetration depth and uplift resistance.The analysis results show that the penetration depth is more sensitive to the width of the pile shoe,and the height has greater influence on the uplift resistance than the length and width of the spud. With the increase of the height,the uplift resistance may increase rapidly.Although the decreases of the length,width and height of the pile shoe may reduce the uplift resistance,the penetration depth may increase in the meantime. This will increase the pulling pile time and reduce the construction efficiency. So the parameters of the pile shoe should be optimized according to the adaptable geology condition so as to obtain the optimal uplift resistance and working efficiency.
基金Project supported by the National Natural Science Foundation of China (No. 51078330)the Natural Science Foundation of Zhejiang Province (No. Y1090610),China
文摘The increase in capacity of displacement piles with time after installation is typically known as soil/pile set-up. A full-scale field test is carried out to observe the set-up effect for open-ended concrete pipe piles jacked into mixed soils. Both the total capacity and the average unit shaft resistance increase approximately linearly with logarithmic time. The average increase rate for unit shaft resistance is 44% per log cycle, while the average increase for total capacity is approximately 21%. A review on case histories for long-term set-up indicates an average set-up rate of approximately 40%. Based on this, the mechanism of pile set-up is discussed in detail and a three-phase model is suggested.