In this paper, we first discuss the relationship between the McShane integral and Pettis integral for vector-valued functions. Then by using the embedding theorems for the fuzzy number space E^1, we give a new equival...In this paper, we first discuss the relationship between the McShane integral and Pettis integral for vector-valued functions. Then by using the embedding theorems for the fuzzy number space E^1, we give a new equivalent condition for (K) integrabihty of a fuzzy set-valued mapping F : [a, b] → E^1.展开更多
The purpose of our paper is to obtain a common fixed point theorem for two pairs of self-mappings of compatible of type (K) in a complete intuitionistic fuzzy Metric space with example. Our result generalized and im...The purpose of our paper is to obtain a common fixed point theorem for two pairs of self-mappings of compatible of type (K) in a complete intuitionistic fuzzy Metric space with example. Our result generalized and improves similar other results in literature.展开更多
(m, k)-firm real-time or weakly hard real-time (WHRT) guarantee is becoming attractive as it closes the gap between hard and soft (or probabilistic) real-time guarantee, and enables finer granularity of real-time QoS ...(m, k)-firm real-time or weakly hard real-time (WHRT) guarantee is becoming attractive as it closes the gap between hard and soft (or probabilistic) real-time guarantee, and enables finer granularity of real-time QoS through adjusting m and k. For multiple streams with (m, k)-firm constraint sharing a single server, an on-line priority assignment policy based on the most recent k-length history of each stream called distance based priority (DBP) has been proposed to assign priority.In case of priority equality among these head-of-queue instances, Earliest Deadline First (EDF) is used. Under the context of WHRT schedule theory, DBP is the most popular, gets much attention and has many applications due to its straightforward priority assignment policy and easy implementation. However, DBP combined with EDF cannot always provide good performance, mainly because the initial DBP does not underline the rich information on deadline met/missed distribution,specially streams in various failure states which will travel different distances to restore success states. Considering how to effectively restore the success state of each individual stream from a failure state, an integrated DBP utilizing deadline met/missed distribution is proposed in this paper. Simulation results validated the performance improvement of this pro-posal.展开更多
In this paper, by use of the Schauder fixed-point theorem, the existence of solution of (k, n - k) Conjugate boundary value problems in Banach spaces is investigated.
文摘In this paper, we first discuss the relationship between the McShane integral and Pettis integral for vector-valued functions. Then by using the embedding theorems for the fuzzy number space E^1, we give a new equivalent condition for (K) integrabihty of a fuzzy set-valued mapping F : [a, b] → E^1.
文摘The purpose of our paper is to obtain a common fixed point theorem for two pairs of self-mappings of compatible of type (K) in a complete intuitionistic fuzzy Metric space with example. Our result generalized and improves similar other results in literature.
基金Project supported by the National Natural Science Foundation ofChina (No. 60203030) and Advanced Research Program of France-China (Nos. PRA SI01-04 PRA SI03-02)
文摘(m, k)-firm real-time or weakly hard real-time (WHRT) guarantee is becoming attractive as it closes the gap between hard and soft (or probabilistic) real-time guarantee, and enables finer granularity of real-time QoS through adjusting m and k. For multiple streams with (m, k)-firm constraint sharing a single server, an on-line priority assignment policy based on the most recent k-length history of each stream called distance based priority (DBP) has been proposed to assign priority.In case of priority equality among these head-of-queue instances, Earliest Deadline First (EDF) is used. Under the context of WHRT schedule theory, DBP is the most popular, gets much attention and has many applications due to its straightforward priority assignment policy and easy implementation. However, DBP combined with EDF cannot always provide good performance, mainly because the initial DBP does not underline the rich information on deadline met/missed distribution,specially streams in various failure states which will travel different distances to restore success states. Considering how to effectively restore the success state of each individual stream from a failure state, an integrated DBP utilizing deadline met/missed distribution is proposed in this paper. Simulation results validated the performance improvement of this pro-posal.
文摘In this paper, by use of the Schauder fixed-point theorem, the existence of solution of (k, n - k) Conjugate boundary value problems in Banach spaces is investigated.