期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
APPROACH TO KARST SOLUTION PROCESS RESPONSES ON CLIMATE
1
作者 Lin Junshu Li Juzhang Fang Jinfu Institute of Geography, CAS, Beijing 100101 People’s Republic of China 《Journal of Geographical Sciences》 SCIE CSCD 1997年第3期58-63,共6页
Based upon the studies of solutional rates with environment from South China to North China over a range of about 30 。 latitude, this paper discusses some of the consequence with equations. The response model shows ... Based upon the studies of solutional rates with environment from South China to North China over a range of about 30 。 latitude, this paper discusses some of the consequence with equations. The response model shows that the precipitation is the most important factor influencing the rate of solutional denudation except the lithology, the relief etc., but it is an integrational action on the solution process; at the same time, temperature acts as a threshold in bringing the precipitation into play. These suggest that firstly, the solutional denudation process is a comprehensive response to the multiple factors; secondly, karst solution is a complex response process to the climate, and as an integrated exogenic process under the bioclimate. 展开更多
关键词 karst solution response model bioclimate response process.
下载PDF
线性结构的非平稳随机地震反应与可靠度分析
2
作者 何军 赵晓宇 《地震工程与工程振动》 CSCD 北大核心 2010年第5期14-21,共8页
基于Sigma振子过程完全非平稳地震荷载模型,建立线性结构随机地震反应分析的时域表达式,利用Simpson法则迭代计算结构随机地震反应的二阶统计特性,由穿越方法,给出具有较大设计安全界限结构地震可靠度的近似评估方法。一个抗弯钢框架的... 基于Sigma振子过程完全非平稳地震荷载模型,建立线性结构随机地震反应分析的时域表达式,利用Simpson法则迭代计算结构随机地震反应的二阶统计特性,由穿越方法,给出具有较大设计安全界限结构地震可靠度的近似评估方法。一个抗弯钢框架的非平稳地震反应与可靠度分析,说明了本文方法的效率、精度和应用过程。 展开更多
关键词 非平稳地震荷载模型 Sigma振子过程 线性结构 地震反应 可靠度 数值解
下载PDF
Emergency management capacity assessment for urban rail transit-an example of Beijing Metro Line 13
3
作者 Jiao Liu Yun Qi Wei Wang 《Transportation Safety and Environment》 EI 2024年第1期109-115,共7页
In order to improve the emergency management capability of urban rail transit system and reduce accidents during metro operation,an emergency management capability evaluation method combining analytic hierarchy proces... In order to improve the emergency management capability of urban rail transit system and reduce accidents during metro operation,an emergency management capability evaluation method combining analytic hierarchy process(AHP)and technique for order preference by similarity to ideal solution(TOPSIS)is proposed.Based on the Prevention Preparation Response Recovery(PPRR)model,factors influencing the emergency management capability of the urban rail transit system are summarized from the perspective of‘human,machine,environment and management’.Then,an emergency management capability evaluation index system containing of 20 secondary indicators is constructed in four stages:emergency prevention,emergency preparation,emergency response and emergency recovery.The weights of indicators are calculated using the AHP method,and the closeness of each indicator to the optimal solution is analysed with the TOPSIS method.Finally,take the Beijing Metro Line 13 as an example to investigate the level of emergency management capability of urban rail transit.The results show that the emergency management capability of Beijing’s urban rail transit system is‘well’,among which hazard prevention measures(0.31)and emergency response team(0.34)have a greater weight on the emergency management capability of rail transit.The model can more accurately assess the emergency management capability of urban rail transit and provide a basis for emergency management. 展开更多
关键词 urban rail transit emergency management capability analytic hierarchy process(AHP) technique for order preference by similarity to ideal solution(TOPSIS) prevention preparation response recovery(PPRR)model
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部