Chang'E-3 probe incorporates four landing gears to assure the soft-landing,which are stowed while launching and deployed after separated from rocket. Deployment reliability is quite crucial for this mission. The d...Chang'E-3 probe incorporates four landing gears to assure the soft-landing,which are stowed while launching and deployed after separated from rocket. Deployment reliability is quite crucial for this mission. The deployment reliability test( DRT) method and assessment method were developed in this paper. Then DRT was conducted and the deployment reliability estimate of Chang'E-3probe was used to verify the proposed methods.展开更多
A systematic, accurate and robust evaluating method for fine pitch printed circuit board (PCB) positioning assessment in testing fixture is developed. Targeting reliability of bed-of-nails tester is successfully eva...A systematic, accurate and robust evaluating method for fine pitch printed circuit board (PCB) positioning assessment in testing fixture is developed. Targeting reliability of bed-of-nails tester is successfully evaluated by the 2D pattern transform. Probe offset vector with its Weibull and Gaussian distribution estimates are obtained for further investigation about the causes of misalignment on the basis of a batch tests for same kind of PCBs.展开更多
Vegetation is the main component of the terrestrial ecosystem and plays a key role in global climate change. Remotely sensed vegetation indices are widely used to detect vegetation trends at large scales. To understan...Vegetation is the main component of the terrestrial ecosystem and plays a key role in global climate change. Remotely sensed vegetation indices are widely used to detect vegetation trends at large scales. To understand the trends of vegetation cover, this research examined the spatial-temporal trends of global vegetation by employing the normalized difference vegetation index(NDVI) from the Advanced Very High Resolution Radiometer(AVHRR) Global Inventory Modeling and Mapping Studies(GIMMS) time series(1982–2015). Ten samples were selected to test the temporal trend of NDVI, and the results show that in arid and semi-arid regions, NDVI showed a deceasing trend, while it showed a growing trend in other regions. Mann-Kendal(MK) trend test results indicate that 83.37% of NDVI pixels exhibited positive trends and that only 16.63% showed negative trends(P < 0.05) during the period from 1982 to 2015. The increasing NDVI trends primarily occurred in tree-covered regions because of forest growth and re-growth and also because of vegetation succession after a forest disturbance. The increasing trend of the NDVI in cropland regions was primarily because of the increasing cropland area and the improvement in planting techniques. This research describes the spatial vegetation trends at a global scale over the past 30+ years, especially for different land cover types.展开更多
Land creation projects have been implemented in China to expand urban space in mountainous areas.In addition to the predictable settlement brought about by filling construction,varying degrees of land subsidence and e...Land creation projects have been implemented in China to expand urban space in mountainous areas.In addition to the predictable settlement brought about by filling construction,varying degrees of land subsidence and engineering failures have a demonstrated relationship to groundwater level fluctuation induced by land creation engineering.In this work,we adopted a typical large-scale land creation project,Yan’an New City in Shaanxi province,West China,as our study area.Prior to conducting the main experiment,preliminary field investigation and groundwater level monitoring were conducted to determine the groundwater fluctuation trend induced by land creation engineering.Although a blind drainage system was implemented,the depth aspect of groundwater level changes after large-scale land creation still needed to be addressed.To study the degree of impact and the settlement mechanism induced by the rising groundwater level,we conducted a Water Immersion Test(WIT)in a typical land creation site for 107 days.The rising groundwater level was simulated by injecting water from the bottom of the filling foundation.During the WIT,the soil water content,surface subsidence,and internal settlement of soil at different depths were obtained.Surface subsidence development could be categorized into four stages during the water level increase.The second stage,which is defined as the point when the groundwater level rises to 10 m,marked the critical point in the process.Furthermore,it was ascertained that the local settlement in regions that were originally composed of steep slopes is larger than that in originally flat areas.In addition,ground cracks and sinkholes in the study area were inspected;and it was determined that they would become new channels that would accelerate water infiltration and exacerbate the settlement.Based on the results from our field investigation and testing,several suggestions are proposed for land creation projects to mitigate issues associated with construction-induced groundwater level rising.展开更多
In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to ...In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to reduce the drawdown and land subsidence outside pits. In dewatering design for confined water, factors including drawdown requirements, the thickness of aquifers, the depth of dewatering wells and the depth of cutoff curtains have to be considered comprehensively and numerical simulations are generally conducted for calculation and analysis. Longyang Road Station on Shanghai Metro Line 18 is taken as the case study subject in this paper, a groundwater seepage model is developed according to the on-site engineering geological conditions and hydrogeological conditions, the excavation depth of the foundation pit as well as the design depth of the enclosure, hydrogeological parameters are determined via the pumping test, and the foundation pit dewatering is simulated by means of the three-dimensional finite difference method, which produces numerical results that consistent with real monitoring data as to the groundwater table. Besides, the drawdown and the land subsidence both inside and outside the pit caused by foundation pit dewatering are calculated and analyzed for various curtain depths. This study reveals that the drawdown and the land subsidence change faster near the curtain with the increase in the curtain depth, and the gradient of drawdown and land subsidence changes dwindles beyond certain depths. In this project, the curtain depth of 47/49 m is adopted, and a drawdown-land subsidence verification test is completed given hanging curtains before the excavation. The result turns out that the real measurements basically match the calculation results from the numerical simulation, and by increasing the depth of curtains, the land subsidence resulting from dewatering is effectively controlled.展开更多
基金National Science and Technology Major Project,China
文摘Chang'E-3 probe incorporates four landing gears to assure the soft-landing,which are stowed while launching and deployed after separated from rocket. Deployment reliability is quite crucial for this mission. The deployment reliability test( DRT) method and assessment method were developed in this paper. Then DRT was conducted and the deployment reliability estimate of Chang'E-3probe was used to verify the proposed methods.
基金This project is supported by US Pennsylvania Dept. of Community & Economic Development(No.20-906-0015)National Natural Science Foundation of China(No.50390064, No.50575230)National Basic Research Program of China(973 Program, No.2003CB716202).
文摘A systematic, accurate and robust evaluating method for fine pitch printed circuit board (PCB) positioning assessment in testing fixture is developed. Targeting reliability of bed-of-nails tester is successfully evaluated by the 2D pattern transform. Probe offset vector with its Weibull and Gaussian distribution estimates are obtained for further investigation about the causes of misalignment on the basis of a batch tests for same kind of PCBs.
基金Under the auspices of National Natural Science Foundation of China(No.41771179,41871103,41771138)the National Key Research and Development Project(No.2016YFA0602301)
文摘Vegetation is the main component of the terrestrial ecosystem and plays a key role in global climate change. Remotely sensed vegetation indices are widely used to detect vegetation trends at large scales. To understand the trends of vegetation cover, this research examined the spatial-temporal trends of global vegetation by employing the normalized difference vegetation index(NDVI) from the Advanced Very High Resolution Radiometer(AVHRR) Global Inventory Modeling and Mapping Studies(GIMMS) time series(1982–2015). Ten samples were selected to test the temporal trend of NDVI, and the results show that in arid and semi-arid regions, NDVI showed a deceasing trend, while it showed a growing trend in other regions. Mann-Kendal(MK) trend test results indicate that 83.37% of NDVI pixels exhibited positive trends and that only 16.63% showed negative trends(P < 0.05) during the period from 1982 to 2015. The increasing NDVI trends primarily occurred in tree-covered regions because of forest growth and re-growth and also because of vegetation succession after a forest disturbance. The increasing trend of the NDVI in cropland regions was primarily because of the increasing cropland area and the improvement in planting techniques. This research describes the spatial vegetation trends at a global scale over the past 30+ years, especially for different land cover types.
基金financial support from National Natural Science Foundation of China (Project No. 41902299 41672305)+2 种基金the Key Science and Technology Program of Shaanxi Province (Project No. 2017ZDXM-SF-078, 2017ZDXM-SF-082)National Key Research and Development Program of China (2018YFC1504700)Shaanxi new-star plan of science and technology (Project No. 2018KJXX020)
文摘Land creation projects have been implemented in China to expand urban space in mountainous areas.In addition to the predictable settlement brought about by filling construction,varying degrees of land subsidence and engineering failures have a demonstrated relationship to groundwater level fluctuation induced by land creation engineering.In this work,we adopted a typical large-scale land creation project,Yan’an New City in Shaanxi province,West China,as our study area.Prior to conducting the main experiment,preliminary field investigation and groundwater level monitoring were conducted to determine the groundwater fluctuation trend induced by land creation engineering.Although a blind drainage system was implemented,the depth aspect of groundwater level changes after large-scale land creation still needed to be addressed.To study the degree of impact and the settlement mechanism induced by the rising groundwater level,we conducted a Water Immersion Test(WIT)in a typical land creation site for 107 days.The rising groundwater level was simulated by injecting water from the bottom of the filling foundation.During the WIT,the soil water content,surface subsidence,and internal settlement of soil at different depths were obtained.Surface subsidence development could be categorized into four stages during the water level increase.The second stage,which is defined as the point when the groundwater level rises to 10 m,marked the critical point in the process.Furthermore,it was ascertained that the local settlement in regions that were originally composed of steep slopes is larger than that in originally flat areas.In addition,ground cracks and sinkholes in the study area were inspected;and it was determined that they would become new channels that would accelerate water infiltration and exacerbate the settlement.Based on the results from our field investigation and testing,several suggestions are proposed for land creation projects to mitigate issues associated with construction-induced groundwater level rising.
基金supported by the Researches on the Control of Confined Water Drawdown and Subsidence in Foundation Pit Projects (Project No. JS-KY16R009-1)this project is funded by Shanghai Metro Line 18 Development Co., Ltd.
文摘In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to reduce the drawdown and land subsidence outside pits. In dewatering design for confined water, factors including drawdown requirements, the thickness of aquifers, the depth of dewatering wells and the depth of cutoff curtains have to be considered comprehensively and numerical simulations are generally conducted for calculation and analysis. Longyang Road Station on Shanghai Metro Line 18 is taken as the case study subject in this paper, a groundwater seepage model is developed according to the on-site engineering geological conditions and hydrogeological conditions, the excavation depth of the foundation pit as well as the design depth of the enclosure, hydrogeological parameters are determined via the pumping test, and the foundation pit dewatering is simulated by means of the three-dimensional finite difference method, which produces numerical results that consistent with real monitoring data as to the groundwater table. Besides, the drawdown and the land subsidence both inside and outside the pit caused by foundation pit dewatering are calculated and analyzed for various curtain depths. This study reveals that the drawdown and the land subsidence change faster near the curtain with the increase in the curtain depth, and the gradient of drawdown and land subsidence changes dwindles beyond certain depths. In this project, the curtain depth of 47/49 m is adopted, and a drawdown-land subsidence verification test is completed given hanging curtains before the excavation. The result turns out that the real measurements basically match the calculation results from the numerical simulation, and by increasing the depth of curtains, the land subsidence resulting from dewatering is effectively controlled.