Both unit and integration testing are incredibly crucial for almost any software application because each of them operates a distinct process to examine the product.Due to resource constraints,when software is subject...Both unit and integration testing are incredibly crucial for almost any software application because each of them operates a distinct process to examine the product.Due to resource constraints,when software is subjected to modifications,the drastic increase in the count of test cases forces the testers to opt for a test optimization strategy.One such strategy is test case prioritization(TCP).Existing works have propounded various methodologies that re-order the system-level test cases intending to boost either the fault detection capabilities or the coverage efficacy at the earliest.Nonetheless,singularity in objective functions and the lack of dissimilitude among the re-ordered test sequences have degraded the cogency of their approaches.Considering such gaps and scenarios when the meteoric and continuous updations in the software make the intensive unit and integration testing process more fragile,this study has introduced a memetics-inspired methodology for TCP.The proposed structure is first embedded with diverse parameters,and then traditional steps of the shuffled-frog-leaping approach(SFLA)are followed to prioritize the test cases at unit and integration levels.On 5 standard test functions,a comparative analysis is conducted between the established algorithms and the proposed approach,where the latter enhances the coverage rate and fault detection of re-ordered test sets.Investigation results related to the mean average percentage of fault detection(APFD)confirmed that the proposed approach exceeds the memetic,basic multi-walk,PSO,and optimized multi-walk by 21.7%,13.99%,12.24%,and 11.51%,respectively.展开更多
In this paper, by means of effective testing practices, main strategies of integration testing for GUI software, including differentiating strategy for distinguished system, strategy of personnel organization, increme...In this paper, by means of effective testing practices, main strategies of integration testing for GUI software, including differentiating strategy for distinguished system, strategy of personnel organization, incremental testing strategy based on baseline version, testing strategy of circulating loop through the whole life, and the strategy of test suite construction, were briefly investigated. Moreover, for the code analysis, the FTA (Fault Tree analysis) is proposed to deal with the software change in regression testing. For test suite constructing, the constructing methods for baseline version and the incremental change are deeply discussed, in which main points focus on the testing strategy based on “Sheet/Form”, the “Grey-box approach” for integration testing process, and the application of the improved STD (State Transform Diagram) in state testing. At the same time, the suite construction of integration testing for two types, including small scale program and large scale software, is analyzed and discussed in detail. For testing execution, the specific method based on “Cross-testing” is investigated. Concurrently, by a lot of examples, all results of testing activity indicate that these strategies and methods are useful and fitted to integration testing for GUI software.展开更多
An inevitable trend has already taken shape for the application of the 5th Generation Mobile Communication Technology(5G)in the railway sector.The application scenarios and business types of the railway sector are com...An inevitable trend has already taken shape for the application of the 5th Generation Mobile Communication Technology(5G)in the railway sector.The application scenarios and business types of the railway sector are complex and diverse,so it is indispensable to test and verify the railway 5G before actual deployment.The design and creation of the railway 5G integrated innovation test platform provides engineering design,test and verification conditions for the networking,coverage and business development of 5G public networks and 5G-R in railway scenarios.This paper introduces the design of the overall architecture for the integrated railway 5G innovation test platform according to the railway network requirements,application scenarios and intelligent development trend;respectively elaborates on the design of the 5G-R core network,bearer network and wireless access along loop tracks,in combination with the characteristics of railway scenarios and the requirements of railway dispatching,operation and safety;raises further solutions on the network deployment and coverage schemes of 5G public networks so as to meet the application requirements of 5G public networks.The study results show that the integrated railway 5G innovation test platform scheme contains co-existence of 5G public and private networks,combines the indoor and outdoor scenarios,as well as takes into account of the dynamic and static tests so as to meet the environmental requirements for the integrated railway 5G test and application of all network functions,for which it can provide comprehensive technical support for railway 5G technology research and development,standard formulation,testing,etc.展开更多
Actual sea condition testing and inspection and evaluation method research are carried out for tidal energy devices to provide scientific and effective technical support for the ocean high-tech achievement transformat...Actual sea condition testing and inspection and evaluation method research are carried out for tidal energy devices to provide scientific and effective technical support for the ocean high-tech achievement transformation and marine renewable energy development. By analyzing three core indicators, including the power output characteristics of the tidal current device, the generating capacity, energy conversion efficiency, proposed the test contents and evaluation methods of indicators are proposed in this paper; and based on the research of wind farms, power quality testing and assessment methods of offshore tidal energy device are proposed; given the security access to the test contents of tidal current energy device, tidal current energy device running conditions in the testing ground are comprehensively assessed.展开更多
In detecting system fault algorithms,the false alarm rate and undectect rate generated by residual Chi-square test can affect the stability of filters.The paper proposes a fault detection algorithm based on sequential...In detecting system fault algorithms,the false alarm rate and undectect rate generated by residual Chi-square test can affect the stability of filters.The paper proposes a fault detection algorithm based on sequential residual Chi-square test and applies to fault detection of an integrated navigation system.The simulation result shows that the algorithm can accurately detect the fault information of global positioning system(GPS),eliminate the influence of false alarm and missed detection on filter,and enhance fault tolerance of integrated navigation systems.展开更多
The water Cherenkov detector array(WCDA) is an important part of the large high-altitude air shower observatory(LHAASO),which is in a research and development phase.The central scientific goal of LHAASO is to explore ...The water Cherenkov detector array(WCDA) is an important part of the large high-altitude air shower observatory(LHAASO),which is in a research and development phase.The central scientific goal of LHAASO is to explore the origin of high-energy cosmic rays of the universe and to push forward the frontier of new physics.To simplify the WCDA's readout electronics,a prototype of a front-end readout for an application-specific integrated circuit(ASIC) is designed based on the timeover-threshold method to achieve charge-to-time conversion.High-precision time measurement and charge measurement are necessary over a full dynamic range[1-4000photoelectrons(P.E.)].To evaluate the performance of this ASIC,a test system is designed that includes the front-end ASIC test module,digitization module,and test software.The first module needs to be customized for different ASIC versions,whereas the digitization module and test software are tested for general-purpose use.In the digitization module,a field programmable gate array-based time-todigital converter is designed with a bin size of 333 ps,which also integrates an inter-integrated circuit to configure the ASIC test module,and a universal serial bus interface is designed to transfer data to the remote computer.Test results indicate that the time resolution is better than 0.5 ns,and the charge resolution is better than 30%root mean square(RMS) at 1 P.E.and 3%RMS at 4000 P.E.,which are beyond the application requirements.展开更多
The principle and process of parallel seismic (PS) testing for the integrity testing of cemented soil columns are in- troduced in this paper. A three-dimensional (3D) finite element model (FEM) for the pile-soil syste...The principle and process of parallel seismic (PS) testing for the integrity testing of cemented soil columns are in- troduced in this paper. A three-dimensional (3D) finite element model (FEM) for the pile-soil system is established for impulse responses. Under saturated soil or unsaturated soil condition, several vibrating velocity-time histories at different depths in parallel hole are obtained based on the numerical simulation. It shows that the length of the pile and the one-dimensional (1D) P-wave velocity in the pile can be determined easily from the features of the mentioned velocity-time histories. By examining the slopes of the first arrival time plotted versus depth or the depth where the amplitude of the first arrival significantly decreases, the length of the pile can be determined. The effects of the 3D P-wave propagation through the saturated soil and the defect of the cemented soil column on the velocity-time histories are also investigated.展开更多
Selecting Chaoying small watershed with representative karst rocky desertification in the Bijie test area of Guizhou Province as an example, according to karst rocky desertiflcation degree and the existing eco-environ...Selecting Chaoying small watershed with representative karst rocky desertification in the Bijie test area of Guizhou Province as an example, according to karst rocky desertiflcation degree and the existing eco-environmental problems in the small watershed, we study developmental model and technique support system for integrated rehabilitation of rocky desertification in the small watershed, and bring forward the development model and technique integration for integrated rehabilitation of rocky desertification, which adapt to the karst areas of Bijie test area, Guizhou Province and even South China.展开更多
A heavy-ion irradiation experiment is studied in digital storage cells with different design approaches in 130?nm CMOS bulk Si and silicon-on-insulator (SOI) technologies. The effectiveness of linear energy transf...A heavy-ion irradiation experiment is studied in digital storage cells with different design approaches in 130?nm CMOS bulk Si and silicon-on-insulator (SOI) technologies. The effectiveness of linear energy transfer (LET) with a tilted ion beam at the 130?nm technology node is obtained. Tests of tilted angles θ=0 ° , 30 ° and 60 ° with respect to the normal direction are performed under heavy-ion Kr with certain power whose LET is about 40?MeVcm 2 /mg at normal incidence. Error numbers in D flip-flop chains are used to determine their upset sensitivity at different incidence angles. It is indicated that the effective LETs for SOI and bulk Si are not exactly in inverse proportion to cosθ , furthermore the effective LET for SOI is more closely in inverse proportion to cosθ compared to bulk Si, which are also the well known behavior. It is interesting that, if we design the sample in the dual interlocked storage cell approach, the effective LET in bulk Si will look like inversely proportional to cosθ very well, which is also specifically explained.展开更多
The IEEE Standard 1149.1 boundary scan (BS) implementation provides the internal access required for testing the digital printed circuit board (PCB). However, the integrity of the boundary scan test infrastructure sh...The IEEE Standard 1149.1 boundary scan (BS) implementation provides the internal access required for testing the digital printed circuit board (PCB). However, the integrity of the boundary scan test infrastructure should be tested first to guarantee the validation of the results of the rest functional test and diagnosis. This paper describes the fault models and test principles of the BS test access port (TAP) lines on PCBs. A test algorithm with high fault coverage and short time is then presented for the PCB on which all ICs are BS ones.展开更多
Clinical laboratory tests are basic elements that support healthcare tasks such as disease detection, diagnosis and monitoring of response to treatments. Current laboratory information systems focus on the patient dat...Clinical laboratory tests are basic elements that support healthcare tasks such as disease detection, diagnosis and monitoring of response to treatments. Current laboratory information systems focus on the patient database, tests and results, with multiple modules available, connecting with the various analytical systems or work areas. However laboratory information systems functioned as “islands of information”, because their design was fundamentally inward-looking and disconnected from other healthcare computer applications. Actually, the Electronic Health Register (EHR) is considered by clinicians as a tool with great potential healthcare benefits. The EHR, in the sense of a unique and complete record of a patient’s healthcare and state of health, regardless of the healthcare level used, is a real attempt to eliminate these “islands of information” and need modules to act as “bridges” with the laboratory information systems. This type of module, which in generic terms may be referred to as a laboratory test request module, has become an essential feature of the EHR. These modules need to use a laboratory coding system as a common language for exchanging information, ensuring that tests and results are unequivocally identified. The development of the laboratory test request module requires the commitment of professionals and political authorities, being necessary time for their design and an adequate pilot phase. The laboratory professionals have to assume a leadership role in the whole process of design, development and implementation of these modules, integrating in the equipment of information technologies of healthcare providers. In our manuscript we review the elements that may prove electronic systems for requesting clinical laboratory test into digital clinical records and the key elements to move from theory to practice.展开更多
Outbursts of methane and rocks are, similarly to rock bursts, the biggest hazards in deep mines and are equally difficult to predict. The violent process of the outburst itself, along with the scale and range of hazar...Outbursts of methane and rocks are, similarly to rock bursts, the biggest hazards in deep mines and are equally difficult to predict. The violent process of the outburst itself, along with the scale and range of hazards following the rapid discharge of gas and rocks, requires solutions which would enable quick and unambiguous detection of the hazard, immediate power supply cut-off and evacuation of personnel from potentially hazardous areas. For this purpose, an integrated outburst detector was developed. Assumed functions of the sensor which was equipped with three measuring and detection elements: a chamber for constant measurement of methane concentration, pressure sensor and microphone. Tests of the sensor model were carried out to estimate the parameters which characterize the dynamic properties of the sensor. Given the impossibility of carrying out the full scale experimental outburst, the sensor was tested during the methane and coal dust explosions in the testing gallery at KD Barbara. The obtained results proved that the applied solutions have been appropriate.展开更多
The thesis selects freight volume and passenger capacity from 1978 to 2008 in Zhejiang Province and the total output value of the primary industry as the object of research, uses quantitative method of co-integration ...The thesis selects freight volume and passenger capacity from 1978 to 2008 in Zhejiang Province and the total output value of the primary industry as the object of research, uses quantitative method of co-integration analysis to analyze the freight volume and passenger capacity, and the total output value of the primary industry in Zhejiang Province. After the stationary test of the time sequence, I conduct the regression analysis of the relationship between freight volume and the total output value of agriculture, and the relationship between passenger capacity and the total output value of agriculture. In addition, I conduct Granger causality test of the relationship between freight volume and passenger capacity, and the total output value of agriculture. The results show that the transportation of Zhejiang Province has promoted the development of agricultural economy prominently, and the development of agricultural economy plays indistinctive role in promoting the transportation volume in Zhejiang Province.展开更多
ZTE Corporation announced its participation in the Global MSF Interoperability (GMI) 2008 event held by the MultiService Forum (MSF) to advance the development of
This paper assessed the benefit of the in-situ pressure test to support steam generator tube integrity assessment and reviewed a conservatism of currently applied structural integrity assessment methodology against de...This paper assessed the benefit of the in-situ pressure test to support steam generator tube integrity assessment and reviewed a conservatism of currently applied structural integrity assessment methodology against defected tubes. According to the steam generator program requirement, condition monitoring assessment was performed to the all detected flaws. For condition monitoring assessments, the limiting structural integrity requirement should be demonstrated for all detected degraded tubes at a probability of at least 0.95 at 50% confidence. Some flaws were slightly exceeded the structural integrity threshold values of the condition monitoring performance limits using analytical method. As a direct evaluation of tube integrity with degraded tubes, in-situ pressure testing performed on some selected flaws and passed all proof and leakage test criteria with no leakage. From this pressure testing, the authors have verified that degraded tubes met a specified value containing a defined safety margins. Also, the authors have confirmed that existing structural assessment methodology has enough margins to retain integrity of steam generator tubes.展开更多
The use of multiple-choice(MC)question types has been one of the most contentious issues in language testing.Much has been said and written about the use of MC over the years.However,no attempt has ever been made to i...The use of multiple-choice(MC)question types has been one of the most contentious issues in language testing.Much has been said and written about the use of MC over the years.However,no attempt has ever been made to introduce any innovation in test item types.The researchers proposed a jumbled words test item(JW)based on cognitive science and deep learning principles,and addressed the feasibility of replacing the type of multiple-choice(MC)question with JW to meet the ongoing rapid development of language testing practice.Two research questions were proposed ad hoc,focusing on the co-relationship between JW and MC scores.RASCH-GZ was used to perform item analyses(Rasch,1960).The item difficulty parameters thus obtained were used to compare the two different test items.The sample data metric includes 40 Chinese participants.The findings revealed that correlation analysis revealed that the performance of the same group of subjects taking both JW and MC was not relevant(Pearson Corr=0).This is primarily due to the total elimination of guessing factors inherent in test-takers during JW test performance.Three factors were specified for the design of the JW test:compute program,test difficulty,and score acceptability.These all have three dimensions.Data collected through questionnaires were analyzed using EFA in SPSS V.24.0.KMOs(=0.867)were found to be approximately one and significance at 0.000(0.05),indicating that the construct of theuestionnaire thus designed has better validity for factor analysis.Three important conclusions were obtained,the implications of which could provide impetus for our testing counterparts to practice more precisely and correctly,potentially reshaping our overall language testing practice.Limitations and recommendations for future research were also discussed.展开更多
文摘Both unit and integration testing are incredibly crucial for almost any software application because each of them operates a distinct process to examine the product.Due to resource constraints,when software is subjected to modifications,the drastic increase in the count of test cases forces the testers to opt for a test optimization strategy.One such strategy is test case prioritization(TCP).Existing works have propounded various methodologies that re-order the system-level test cases intending to boost either the fault detection capabilities or the coverage efficacy at the earliest.Nonetheless,singularity in objective functions and the lack of dissimilitude among the re-ordered test sequences have degraded the cogency of their approaches.Considering such gaps and scenarios when the meteoric and continuous updations in the software make the intensive unit and integration testing process more fragile,this study has introduced a memetics-inspired methodology for TCP.The proposed structure is first embedded with diverse parameters,and then traditional steps of the shuffled-frog-leaping approach(SFLA)are followed to prioritize the test cases at unit and integration levels.On 5 standard test functions,a comparative analysis is conducted between the established algorithms and the proposed approach,where the latter enhances the coverage rate and fault detection of re-ordered test sets.Investigation results related to the mean average percentage of fault detection(APFD)confirmed that the proposed approach exceeds the memetic,basic multi-walk,PSO,and optimized multi-walk by 21.7%,13.99%,12.24%,and 11.51%,respectively.
文摘In this paper, by means of effective testing practices, main strategies of integration testing for GUI software, including differentiating strategy for distinguished system, strategy of personnel organization, incremental testing strategy based on baseline version, testing strategy of circulating loop through the whole life, and the strategy of test suite construction, were briefly investigated. Moreover, for the code analysis, the FTA (Fault Tree analysis) is proposed to deal with the software change in regression testing. For test suite constructing, the constructing methods for baseline version and the incremental change are deeply discussed, in which main points focus on the testing strategy based on “Sheet/Form”, the “Grey-box approach” for integration testing process, and the application of the improved STD (State Transform Diagram) in state testing. At the same time, the suite construction of integration testing for two types, including small scale program and large scale software, is analyzed and discussed in detail. For testing execution, the specific method based on “Cross-testing” is investigated. Concurrently, by a lot of examples, all results of testing activity indicate that these strategies and methods are useful and fitted to integration testing for GUI software.
文摘An inevitable trend has already taken shape for the application of the 5th Generation Mobile Communication Technology(5G)in the railway sector.The application scenarios and business types of the railway sector are complex and diverse,so it is indispensable to test and verify the railway 5G before actual deployment.The design and creation of the railway 5G integrated innovation test platform provides engineering design,test and verification conditions for the networking,coverage and business development of 5G public networks and 5G-R in railway scenarios.This paper introduces the design of the overall architecture for the integrated railway 5G innovation test platform according to the railway network requirements,application scenarios and intelligent development trend;respectively elaborates on the design of the 5G-R core network,bearer network and wireless access along loop tracks,in combination with the characteristics of railway scenarios and the requirements of railway dispatching,operation and safety;raises further solutions on the network deployment and coverage schemes of 5G public networks so as to meet the application requirements of 5G public networks.The study results show that the integrated railway 5G innovation test platform scheme contains co-existence of 5G public and private networks,combines the indoor and outdoor scenarios,as well as takes into account of the dynamic and static tests so as to meet the environmental requirements for the integrated railway 5G test and application of all network functions,for which it can provide comprehensive technical support for railway 5G technology research and development,standard formulation,testing,etc.
基金supported by the Implementation Programs for Marine Renewable Energy Special Funds (GHME2012ZC02)
文摘Actual sea condition testing and inspection and evaluation method research are carried out for tidal energy devices to provide scientific and effective technical support for the ocean high-tech achievement transformation and marine renewable energy development. By analyzing three core indicators, including the power output characteristics of the tidal current device, the generating capacity, energy conversion efficiency, proposed the test contents and evaluation methods of indicators are proposed in this paper; and based on the research of wind farms, power quality testing and assessment methods of offshore tidal energy device are proposed; given the security access to the test contents of tidal current energy device, tidal current energy device running conditions in the testing ground are comprehensively assessed.
基金supported by the National Natural Science Foundation of China(6063403060702066)+1 种基金the Aerospace Science Foundation(20090853013)Fundmental Research Foundation of NWPU(JC201015),Soaring Star of NWPU
文摘In detecting system fault algorithms,the false alarm rate and undectect rate generated by residual Chi-square test can affect the stability of filters.The paper proposes a fault detection algorithm based on sequential residual Chi-square test and applies to fault detection of an integrated navigation system.The simulation result shows that the algorithm can accurately detect the fault information of global positioning system(GPS),eliminate the influence of false alarm and missed detection on filter,and enhance fault tolerance of integrated navigation systems.
基金supported by the Knowledge Innovation Program of the Chinese Academy of Sciences(KJCX2-YW-N27)the CAS Center for Excellence in Particle Physics(CCEPP)
文摘The water Cherenkov detector array(WCDA) is an important part of the large high-altitude air shower observatory(LHAASO),which is in a research and development phase.The central scientific goal of LHAASO is to explore the origin of high-energy cosmic rays of the universe and to push forward the frontier of new physics.To simplify the WCDA's readout electronics,a prototype of a front-end readout for an application-specific integrated circuit(ASIC) is designed based on the timeover-threshold method to achieve charge-to-time conversion.High-precision time measurement and charge measurement are necessary over a full dynamic range[1-4000photoelectrons(P.E.)].To evaluate the performance of this ASIC,a test system is designed that includes the front-end ASIC test module,digitization module,and test software.The first module needs to be customized for different ASIC versions,whereas the digitization module and test software are tested for general-purpose use.In the digitization module,a field programmable gate array-based time-todigital converter is designed with a bin size of 333 ps,which also integrates an inter-integrated circuit to configure the ASIC test module,and a universal serial bus interface is designed to transfer data to the remote computer.Test results indicate that the time resolution is better than 0.5 ns,and the charge resolution is better than 30%root mean square(RMS) at 1 P.E.and 3%RMS at 4000 P.E.,which are beyond the application requirements.
基金Project (No. 50478022) supported by the National Natural Science Foundation of China
文摘The principle and process of parallel seismic (PS) testing for the integrity testing of cemented soil columns are in- troduced in this paper. A three-dimensional (3D) finite element model (FEM) for the pile-soil system is established for impulse responses. Under saturated soil or unsaturated soil condition, several vibrating velocity-time histories at different depths in parallel hole are obtained based on the numerical simulation. It shows that the length of the pile and the one-dimensional (1D) P-wave velocity in the pile can be determined easily from the features of the mentioned velocity-time histories. By examining the slopes of the first arrival time plotted versus depth or the depth where the amplitude of the first arrival significantly decreases, the length of the pile can be determined. The effects of the 3D P-wave propagation through the saturated soil and the defect of the cemented soil column on the velocity-time histories are also investigated.
基金Supported by Major Issue of National "12~(th) Five-year Plan"Science and Technology Support Plan,China(2011BAC09B01)
文摘Selecting Chaoying small watershed with representative karst rocky desertification in the Bijie test area of Guizhou Province as an example, according to karst rocky desertiflcation degree and the existing eco-environmental problems in the small watershed, we study developmental model and technique support system for integrated rehabilitation of rocky desertification in the small watershed, and bring forward the development model and technique integration for integrated rehabilitation of rocky desertification, which adapt to the karst areas of Bijie test area, Guizhou Province and even South China.
基金Supported by the Key Laboratory of Microsatellites,Chinese Academy of Sciences
文摘A heavy-ion irradiation experiment is studied in digital storage cells with different design approaches in 130?nm CMOS bulk Si and silicon-on-insulator (SOI) technologies. The effectiveness of linear energy transfer (LET) with a tilted ion beam at the 130?nm technology node is obtained. Tests of tilted angles θ=0 ° , 30 ° and 60 ° with respect to the normal direction are performed under heavy-ion Kr with certain power whose LET is about 40?MeVcm 2 /mg at normal incidence. Error numbers in D flip-flop chains are used to determine their upset sensitivity at different incidence angles. It is indicated that the effective LETs for SOI and bulk Si are not exactly in inverse proportion to cosθ , furthermore the effective LET for SOI is more closely in inverse proportion to cosθ compared to bulk Si, which are also the well known behavior. It is interesting that, if we design the sample in the dual interlocked storage cell approach, the effective LET in bulk Si will look like inversely proportional to cosθ very well, which is also specifically explained.
文摘The IEEE Standard 1149.1 boundary scan (BS) implementation provides the internal access required for testing the digital printed circuit board (PCB). However, the integrity of the boundary scan test infrastructure should be tested first to guarantee the validation of the results of the rest functional test and diagnosis. This paper describes the fault models and test principles of the BS test access port (TAP) lines on PCBs. A test algorithm with high fault coverage and short time is then presented for the PCB on which all ICs are BS ones.
文摘Clinical laboratory tests are basic elements that support healthcare tasks such as disease detection, diagnosis and monitoring of response to treatments. Current laboratory information systems focus on the patient database, tests and results, with multiple modules available, connecting with the various analytical systems or work areas. However laboratory information systems functioned as “islands of information”, because their design was fundamentally inward-looking and disconnected from other healthcare computer applications. Actually, the Electronic Health Register (EHR) is considered by clinicians as a tool with great potential healthcare benefits. The EHR, in the sense of a unique and complete record of a patient’s healthcare and state of health, regardless of the healthcare level used, is a real attempt to eliminate these “islands of information” and need modules to act as “bridges” with the laboratory information systems. This type of module, which in generic terms may be referred to as a laboratory test request module, has become an essential feature of the EHR. These modules need to use a laboratory coding system as a common language for exchanging information, ensuring that tests and results are unequivocally identified. The development of the laboratory test request module requires the commitment of professionals and political authorities, being necessary time for their design and an adequate pilot phase. The laboratory professionals have to assume a leadership role in the whole process of design, development and implementation of these modules, integrating in the equipment of information technologies of healthcare providers. In our manuscript we review the elements that may prove electronic systems for requesting clinical laboratory test into digital clinical records and the key elements to move from theory to practice.
文摘Outbursts of methane and rocks are, similarly to rock bursts, the biggest hazards in deep mines and are equally difficult to predict. The violent process of the outburst itself, along with the scale and range of hazards following the rapid discharge of gas and rocks, requires solutions which would enable quick and unambiguous detection of the hazard, immediate power supply cut-off and evacuation of personnel from potentially hazardous areas. For this purpose, an integrated outburst detector was developed. Assumed functions of the sensor which was equipped with three measuring and detection elements: a chamber for constant measurement of methane concentration, pressure sensor and microphone. Tests of the sensor model were carried out to estimate the parameters which characterize the dynamic properties of the sensor. Given the impossibility of carrying out the full scale experimental outburst, the sensor was tested during the methane and coal dust explosions in the testing gallery at KD Barbara. The obtained results proved that the applied solutions have been appropriate.
基金Supported by the Program of Characteristic Major (International Economy and Trade) of Zhejiang Province in the Year 2009(TZZ09084)
文摘The thesis selects freight volume and passenger capacity from 1978 to 2008 in Zhejiang Province and the total output value of the primary industry as the object of research, uses quantitative method of co-integration analysis to analyze the freight volume and passenger capacity, and the total output value of the primary industry in Zhejiang Province. After the stationary test of the time sequence, I conduct the regression analysis of the relationship between freight volume and the total output value of agriculture, and the relationship between passenger capacity and the total output value of agriculture. In addition, I conduct Granger causality test of the relationship between freight volume and passenger capacity, and the total output value of agriculture. The results show that the transportation of Zhejiang Province has promoted the development of agricultural economy prominently, and the development of agricultural economy plays indistinctive role in promoting the transportation volume in Zhejiang Province.
文摘ZTE Corporation announced its participation in the Global MSF Interoperability (GMI) 2008 event held by the MultiService Forum (MSF) to advance the development of
文摘This paper assessed the benefit of the in-situ pressure test to support steam generator tube integrity assessment and reviewed a conservatism of currently applied structural integrity assessment methodology against defected tubes. According to the steam generator program requirement, condition monitoring assessment was performed to the all detected flaws. For condition monitoring assessments, the limiting structural integrity requirement should be demonstrated for all detected degraded tubes at a probability of at least 0.95 at 50% confidence. Some flaws were slightly exceeded the structural integrity threshold values of the condition monitoring performance limits using analytical method. As a direct evaluation of tube integrity with degraded tubes, in-situ pressure testing performed on some selected flaws and passed all proof and leakage test criteria with no leakage. From this pressure testing, the authors have verified that degraded tubes met a specified value containing a defined safety margins. Also, the authors have confirmed that existing structural assessment methodology has enough margins to retain integrity of steam generator tubes.
文摘The use of multiple-choice(MC)question types has been one of the most contentious issues in language testing.Much has been said and written about the use of MC over the years.However,no attempt has ever been made to introduce any innovation in test item types.The researchers proposed a jumbled words test item(JW)based on cognitive science and deep learning principles,and addressed the feasibility of replacing the type of multiple-choice(MC)question with JW to meet the ongoing rapid development of language testing practice.Two research questions were proposed ad hoc,focusing on the co-relationship between JW and MC scores.RASCH-GZ was used to perform item analyses(Rasch,1960).The item difficulty parameters thus obtained were used to compare the two different test items.The sample data metric includes 40 Chinese participants.The findings revealed that correlation analysis revealed that the performance of the same group of subjects taking both JW and MC was not relevant(Pearson Corr=0).This is primarily due to the total elimination of guessing factors inherent in test-takers during JW test performance.Three factors were specified for the design of the JW test:compute program,test difficulty,and score acceptability.These all have three dimensions.Data collected through questionnaires were analyzed using EFA in SPSS V.24.0.KMOs(=0.867)were found to be approximately one and significance at 0.000(0.05),indicating that the construct of theuestionnaire thus designed has better validity for factor analysis.Three important conclusions were obtained,the implications of which could provide impetus for our testing counterparts to practice more precisely and correctly,potentially reshaping our overall language testing practice.Limitations and recommendations for future research were also discussed.