期刊文献+
共找到1,887篇文章
< 1 2 95 >
每页显示 20 50 100
Thermal performance of cast-in-place piles with artificial ground freezing in permafrost regions
1
作者 WANG Xinbin CHEN Kun +3 位作者 YU Qihao GUO Lei YOU Yanhui JIN Mingyang 《Journal of Mountain Science》 SCIE CSCD 2024年第4期1307-1328,共22页
During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing cap... During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing capacity of the pile is quite small before the full freeze-back,the quick refreezing of the native soils surrounding the cast-in-place pile has become the focus of the infrastructure construction in permafrost.To solve this problem,this paper innovatively puts forward the application of the artificial ground freezing(AGF)method at the end of the curing period of cast-in-place piles in permafrost.A field test on the AGF was conducted at the Beiluhe Observation and Research Station of Frozen Soil Engineering and Environment(34°51.2'N,92°56.4'E)in the Qinghai Tibet Plateau(QTP),and then a 3-D numerical model was established to investigate the thermal performance of piles using AGF under different engineering conditions.Additionally,the long-term thermal performance of piles after the completion of AGF under different conditions was estimated.Field experiment results demonstrate that AGF is an effective method to reduce the refreezing time of the soil surrounding the piles constructed in permafrost terrain,with the ability to reduce the pile-soil interface temperatures to below the natural ground temperature within 3 days.Numerical results further prove that AGF still has a good cooling effect even under unfavorable engineering conditions such as high pouring temperature,large pile diameter,and large pile length.Consequently,the application of this method is meaningful to save the subsequent latency time and solve the problem of thermal disturbance in pile construction in permafrost.The research results are highly relevant for the spread of AGF technology and the rapid building of pile foundations in permafrost. 展开更多
关键词 Permafrost engineering cast-in-place pile Artificial ground freezing Thermal performance.
下载PDF
Field observation of the thermal disturbance and freezeback processes of cast-in-place pile foundations in warm permafrost regions
2
作者 Xin Hou Ji Chen +4 位作者 YouQian Liu PengFei Rui JingYi Zhao ShouHong Zhang HaiMing Dang 《Research in Cold and Arid Regions》 CSCD 2023年第1期18-26,共9页
The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the therm... The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the thermal stability of permafrost.In this paper,temperature data from inside multiple CIP piles,borehole observations of ground thermal status adjacent to the foundations and local weather stations were monitored in warm permafrost regions to study the thermal influence process of CIP pile foundations.The following conclusions are drawn from the field observation data.(1)The early temperature change process of different CIP piles is different,and the differences gradually diminish over time.(2)The initial concrete temperature is linearly related with the air temperature,net radiation and wind speed within 1 h before the completion of concrete pouring;the contributions of the air temperature,net radiation,and wind speed to the initial concrete temperature are 51.9%,20.3%and 27.9%,respectively.(3)The outer boundary of the thermal disturbance annulus is approximately 2 m away from the pile center.It took more than 224 days for the soil around the CIP piles to return to the natural permafrost temperature at the study site. 展开更多
关键词 PERMAFROST cast-in-place pile foundations Thermal disturbance Freezeback process Initial concrete temperature
下载PDF
Soil Plug Effect Prediction and Pile Driveability Analysis for Large-Diameter Steel Piles in Ocean Engineering 被引量:16
3
作者 刘润 闫澍旺 李志华 《China Ocean Engineering》 SCIE EI 2009年第1期107-118,共12页
Long steel piles with large diameters have been more widely used in the field of ocean engineering. Owing to the pile with a large diameter, soil plug development during pile driving has great influences on pile drive... Long steel piles with large diameters have been more widely used in the field of ocean engineering. Owing to the pile with a large diameter, soil plug development during pile driving has great influences on pile driveability and bearing capacity. The response of soil plug developed inside the open-ended pipe pile during the dynamic condition of pile-driving is different from the response under the static condition of loading during service. This paper addresses the former aspect. A numerical procedure for soil plug effect prediction and pile driveabihty analysis is proposed and described. By taking into consideration of the pile dimension effect on side and tip resistance, this approach introduces a dimensional coefficient to the conventional static eqnihbrium equations for the plug differential unit and proposes an improved static equity method for the plug effect prediction. At the same time, this approach introduces a simplified model by use of one-dimensional stress wave equation to simulate the interaction between soil plug and pile inner wall. The proposed approach has been applied in practical engineering analyses. Results show that the calculated plug effect and pile driveabihty based on the proposed approach agree well with the observed data. 展开更多
关键词 large diameter steel piles soil plug plug effect static equity method interaction between the plug and pile inner wall driveability analysis
下载PDF
Effect of sediment on vertical dynamic impedance of rock-socketed pile with large diameter 被引量:6
4
作者 俞缙 蔡燕燕 吴文兵 《Journal of Central South University》 SCIE EI CAS 2013年第10期2856-2862,共7页
Based on the fictitious soil pile model, the effect of sediment on the vertical dynamic impedance of rock-socketed pile with large diameter was theoretically studied by means of Laplace transform technique and impedan... Based on the fictitious soil pile model, the effect of sediment on the vertical dynamic impedance of rock-socketed pile with large diameter was theoretically studied by means of Laplace transform technique and impedance function transfer method. Firstly, the sediment under rock-socketed pile was assumed to be fictitious soil pile with the same sectional area. The Rayleigh-Love rode model was used to simulate the rock-socketed pile and the fictitious soil pile with the consideration of the lateral inertial effect of large-diameter pile. The layered surrounding soils and bedrock were modeled by the plane strain model. Then, by virtue of the initial conditions and boundary conditions of the soil pile system, the analytical solution of the vertical dynamic impedance at the head of rock-socketed pile was derived for the arbitrary excitation acting on the pile head. Lastly, based on the presented analytical solution, the effect of sediment properties, bedrock property and lateral inertial effect on the vertical dynamic impedance at rock-socketed pile head were investigated in detail. It is shown that the sediment properties have significant effect on the vertical dynamic impedance at the rock-socketed pile head. The ability of soil-pile system to resist dynamic vertical deformation is weakened with the increase of sediment thickness, but amplified with the increase of shear wave velocity of sediment. The ability of soil pile system to resist dynamic vertical deformation is amplified with the bedrock property improving, but the ability of soil-pile system to resist vertical vibration is weakened with the improvement of bedrock property. 展开更多
关键词 ROCK-SOCKETED pile SEDIMENT dynamic impedance fictitious soil pile MODEL large diameter Rayleigh-Love rode MODEL
下载PDF
Refreezing of cast-in-place piles under various engineering conditions 被引量:9
5
作者 Lei Guo QiHao Yu +2 位作者 XiaoNing Li XinBin Wang YongYu Yue 《Research in Cold and Arid Regions》 CSCD 2015年第4期376-383,共8页
In the construction of the Qinghai-Tibet Power Transmission Line (QTPTL), cast-in-place piles (CIPPs) are widely applied in areas with unfavorable geological conditions. The thermal regime around piles in permafro... In the construction of the Qinghai-Tibet Power Transmission Line (QTPTL), cast-in-place piles (CIPPs) are widely applied in areas with unfavorable geological conditions. The thermal regime around piles in permafrost regions greatly affects the stability of the towers as well as the operation of the QTPTL. The casting of piles will markedly affect the thermal regime of the surrounding permafrost because of the casting temperature and the hydration heat of cement. Based on the typical geological and engineering conditions along the QTPTL, thermal disturbance ofa CIPP to surrounding permafrost under different casting seasons, pile depths, and casting temperatures were simulated. The results show that the casting season (summer versus winter) can influence the refreezing process of CIPPs, within the first 6 m of pile depth. Sixty days after being cast, CIPPs greater than 6 m in depth can be frozen regardless of which season they were cast, and the foundation could be reffozen after a cold season. Comparing the refreezing characteristics of CIPPs cast in different seasons also showed that, without considering the ground surface conditions, warm seasons are more suitable for casting piles. With the increase of pile depth, the thermal effect of a CIPP on the surrounding soil mainly expands vertically, while the lateral heat disturbance changes little. Deeper, longer CIPPs have better stability. The casting temperature clearly affects the thermal disturbance, and the radius of the melting circle increases with rising casting temperature. The optimal casting temperature is between 2 ℃ and 9 ℃. 展开更多
关键词 cast-in-place pile hydration heat REFREEZING engineering factor PERMAFROST
下载PDF
Vertical vibration of a large diameter pipe pile considering transverse inertia effect of pile 被引量:9
6
作者 郑长杰 刘汉龙 +1 位作者 丁选明 周航 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第4期891-897,共7页
Considering the transverse inertia effect of pile, the vertical soil layer is studied. The wave propagations in the outer and inner soil dynamic response of a large diameter pipe pile in viscoelastic are simulated by ... Considering the transverse inertia effect of pile, the vertical soil layer is studied. The wave propagations in the outer and inner soil dynamic response of a large diameter pipe pile in viscoelastic are simulated by three-dimensional elastodynamic theory and those in the pile are simulated by Rayleigh-Love rod theory. The vertical and radial displacements of the outer and inner soil are obtained by utilizing Laplace transform technique and differentiation on the governing equations of soils. Then, based on the continuous conditions between the pile and soils, the displacements of the pile are derived. The frequency domain velocity admittance and time domain velocity response of the pile top are also presented. The solution is compared to a classical rod model solution to verify the validity. The influences of the radii and Poisson ratio of pile on the transverse inertia effect of pile are analyzed. The parametric study shows that Poisson ratio and outer radius of pile have significant influence on the transverse inertia effect of large diameter pipe piles, while the inner radius has little effect. 展开更多
关键词 large diameter pipe pile vertical vibration Rayleigh-Love rod transverse inertia effect
下载PDF
Effects of liquefaction-induced large lateral ground deformation on pile foundations 被引量:5
7
作者 王艳丽 程展林 王勇 《Journal of Central South University》 SCIE EI CAS 2013年第9期2510-2518,共9页
The pile-soil system interaction computational model in liquefaction-induced lateral spreading ground was established by the finite difference numerical method.Considering an elastic-plastic subgrade reaction method,n... The pile-soil system interaction computational model in liquefaction-induced lateral spreading ground was established by the finite difference numerical method.Considering an elastic-plastic subgrade reaction method,numerical methods involving finite difference approach of pile in liquefaction-induced lateral spreading ground were derived and implemented into a finite difference program.Based on the monotonic loading tests on saturated sand after liquefaction,the liquefaction lateral deformation of the site where group piles are located was predicted.The effects of lateral ground deformation after liquefaction on a group of pile foundations were studied using the fmite difference program mentioned above,and the failure mechanism of group piles in liquefaction-induced lateral spreading ground was obtained.The applicability of the program was preliminarily verified.The results show that the bending moments at the interfaces between liquefied and non-liquefied soil layers are larger than those at the pile's top when the pile's top is embedded.The value of the additional static bending moment is larger than the peak dynamic bending moment during the earthquake,so in the pile foundation design,more than the superstructure's dynamics should be considered and the effect of lateral ground deformation on pile foundations cannot be neglected. 展开更多
关键词 liquefaction-induced lateral spreading ground pile foundation large post-liquefaction deformation finite difference method
下载PDF
Physical modeling of behaviors of cast-in-place concrete piled raft compared to free-standing pile group in sand 被引量:1
8
作者 Mehdi Sharafkhah Issa Shooshpasha 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2018年第4期703-716,共14页
Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies i... Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies indicated that this method is too conservative. Only when the pile cap is elevated from the ground level,the raft bearing contribution can be neglected. In a piled raft foundation, pileesoileraft interaction is complicated. Although several numerical studies have been carried out to analyze the behaviors of piled raft foundations, very few experimental studies are reported in the literature. The available laboratory studies mainly focused on steel piles. The present study aims to compare the behaviors of piled raft foundations with free-standing pile groups in sand, using laboratory physical models. Cast-in-place concrete piles and concrete raft are used for the tests. The tests are conducted on single pile, single pile in pile group, unpiled raft, free-standing pile group and piled raft foundation. We examine the effects of the number of piles, the pile installation method and the interaction between different components of foundation. The results indicate that the ultimate bearing capacity of the piled raft foundation is considerably higher than that of the free-standing pile group with the same number of piles. With installation of the single pile in the group, the pile bearing capacity and stiffness increase. Installation of the piles beneath the raft decreases the bearing capacity of the raft. When the raft bearing capacity is not included in the design process, the allowable bearing capacity of the piled raft is underestimated by more than 200%. This deviation intensifies with increasing spacing of the piles. 展开更多
关键词 Free-standing pile group piled raft pileesoileraft interaction Physical modeling cast-in-place concrete piles
下载PDF
Analysis of dynamical response to large deformation of piles with initial displacements
9
作者 胡育佳 朱媛媛 朱正佑 《Journal of Shanghai University(English Edition)》 CAS 2009年第3期233-241,共9页
In this paper, a nonlinear mathematical model for analyzing dynamical response to the large deformation of piles with initial displacements is firstly established with the arc-coordinate, and it is a set of nonlinear ... In this paper, a nonlinear mathematical model for analyzing dynamical response to the large deformation of piles with initial displacements is firstly established with the arc-coordinate, and it is a set of nonlinear integral-differential equa- tions, in which, the Winkeler model is used to simulate the resistance of the soil to the pile. Secondly, a set of new auxiliary functions are introduced. The differential-integral equations are transformed into a set of nonlinear differential equations, and the differential quadrature method (DQM) and the finite difference method (FDM) are applied to discretize the set of nonlinear equations in the spatial and time domains, respectively. Then, the Newton-Raphson method is used to solve the set of discretization algebraic equations at each time step. Finally, numerical examples are presented, and the dynamical re- sponses to the deformation of piles, including configuration, bending moment and shear force, are graphically illuminated. In calculation, two types of initial displacements and dynamical loads are applied, and the effects of parameters on the dynamical responses of piles are analyzed in detail. 展开更多
关键词 pile large deformation nonlinear dynamical response initial displacement auxiliary function differential quadrature method
下载PDF
Field study of plastic tube cast-in-place concrete pile
10
作者 陈永辉 曹德洪 +2 位作者 王新泉 杜海伟 张霆 《Journal of Central South University》 SCIE EI CAS 2008年第S2期195-202,共8页
The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on sin... The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on single piles with different forms of pile shoes and on their composite foundations were analyzed. The distribution patterns of axial force, shaft friction and toe resistance were studied based on the measurements taken from buried strain gauges. From the point of engineering application, the pile has merits in convenient quality control, high bearing capacity and reliable quality, showing higher reasonability, advancement and suitability than other ground improvement methods. The pile can be adopted properly to take place of ordinary ground improvement method, achieving greater economical and social benefits. 展开更多
关键词 PLASTIC tube cast-in-place concrete pile SOFT ground improvement pile-supported type reinforced EMBANKMENT CONSTRUCTION equipment CONSTRUCTION workmanship
下载PDF
Study on the Embedded Mode of Large Diameter Steel Tube and Concrete Combined Pile
11
作者 XIA Detain 《International English Education Research》 2016年第4期7-9,共3页
As the stiffness discontinuous of large diameter steel tube and concrete combined pile, the complicated stress state is caused by the combination of the pile foundation and the base rock, the steel casing and the bedr... As the stiffness discontinuous of large diameter steel tube and concrete combined pile, the complicated stress state is caused by the combination of the pile foundation and the base rock, the steel casing and the bedrock structure. It is needed to put forward a scientific basis to determine the pile foundation effective depth of embedded. For this purpose, the physical model and the numerical model of single pile with large diameter steel tube and reinforced concrete combined force are established. Through numerical simulation and contrast test of a large number of variable parameters, the various factors that affect the lateral bearing capacity of the embedded piles are discussed in detail, the mechanical properties of the foundation under the action of the steel tube and the pile foundation are obtained. 展开更多
关键词 Inland waterway large water level difference wharf pile foundation steel tube
下载PDF
Influence of the penetration of adjacent X-section cast-in-place concrete(XCC)pile on the existing XCC pile in sand
12
作者 Peng ZHOU Jianhui XU +3 位作者 Changjie XU Guangwei CAO Jie CUP Xuanming DING 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2024年第7期557-572,共16页
A series of small-scale 1g X-section cast-in-place concrete(XCC)pile-penetration model tests were conducted to study the effects of soil density and pile geometry on the lateral responses of an existing pile and the v... A series of small-scale 1g X-section cast-in-place concrete(XCC)pile-penetration model tests were conducted to study the effects of soil density and pile geometry on the lateral responses of an existing pile and the variations in surrounding soil stress.The results showed that the bending patterns of existing XCC piles varied with penetration depth.The lateral response of the existing pile was sensitive to the change in relative density and pile geometry.For example,the bending moment of the existing pile increased along with these parameters.The development of the radial stressσ′r/σ′v0 of the soil around an existing pile showed different trends at various depths during the penetration of the adjacent pile.Moreover,the change in radial stress during the penetration of the XCC pile did not exhibit the“h/R effect”that was observed in the free-field soil,due to the shielding effect of the existing piles.The peak value of radial stressσ′r_max/σ′v0 decreased exponentially as the radial distance r/R increased.The attenuation ofσ′r_max/σ′v0 with r/R in the loose sand was faster than in the medium-dense or dense sands.Theσ′r_max/σ′v0 at the same soil location increased with the cross-section geometry parameter. 展开更多
关键词 X-section cast-in-place concrete(XCC)pile Test PENETRATION SAND Lateral response Radial stress
原文传递
An Approach to Stability Analysis of Embedded Large-Diameter Cylinder Quay 被引量:7
13
作者 WANG Yuanzhan(王元战) +1 位作者 ZHU Zhenyu(祝振宇) 《China Ocean Engineering》 SCIE EI 2002年第3期383-393,共11页
The large-diameter cylinder structure, which is made of large successive bottomless cylinders placed on foundation bed or partly driven into soil, is a recently developed retaining structure in China. It can be used i... The large-diameter cylinder structure, which is made of large successive bottomless cylinders placed on foundation bed or partly driven into soil, is a recently developed retaining structure in China. It can be used in port, coastal and offshore works. The method for stability analysis of the large-diameter cylinder structure, especially for stability analysis of the embedded large-diameter cylinder structure, is an important issue. In this paper, an idea is presented that is, embedded large-diameter cylinder quays can be divided into two types, i.e. the gravity wall type and the cylinder pile wall type. A method for stability analysis of the large-diameter cylinder quay of the cylinder pile wall type is developed and a method for stability analysis of the large-diameter cylinder quay of the gravity wall type is also proposed. The effect of significant parameters on the stability of the large-diameter cylinder quay of the cylinder pile wall type is investigated through numerical calculation. 展开更多
关键词 large-diameter cylinder quay cylinder pile wall stability analysis
下载PDF
桩端岩溶三维超声成像方法及应用研究
14
作者 孙红林 张邦 +4 位作者 刘铁华 刘铁 化希瑞 陈健 汪文刚 《铁道工程学报》 EI CSCD 北大核心 2024年第2期26-32,37,共8页
研究目的:岩溶地区大直径桩基础受桩端岩溶的威胁大,探查不清或处理不当时可能会出现桩基承载力不足等严重工程质量问题,现有探测方法难以在桩底复杂泥水环境下实现桩端三维精细化探测。本文基于超声相控阵全聚焦成像原理,提出一种全新... 研究目的:岩溶地区大直径桩基础受桩端岩溶的威胁大,探查不清或处理不当时可能会出现桩基承载力不足等严重工程质量问题,现有探测方法难以在桩底复杂泥水环境下实现桩端三维精细化探测。本文基于超声相控阵全聚焦成像原理,提出一种全新的桩端岩溶三维探测方法,以实现对桩端一定范围内地质结构进行三维高精度成像。研究结论:(1)本方法和装备在桩底采集超声数据并成像,可对桩端一定深度和冲切角范围内岩溶三维高精度成像;(2)足尺模型试验表明本装备可探测桩端10 m以内溶洞且探测精度优于0.1 m;(3)工程实践表明本装备可有效查明桩端岩溶、破碎裂隙,探测结果准确可靠;(4)本装备能适应桩底各种恶劣的环境,探测过程简单高效,时效性强,对保障岩溶区桩基施工安全与质量控制具有重要的意义。 展开更多
关键词 大直径桩 岩溶探测 超声相控 三维成像 高精度
下载PDF
砾砂地层盾构切削大直径群桩的刀具研究
15
作者 乔世范 张睿 +3 位作者 王广 王刚 陈道龙 张喆 《铁道科学与工程学报》 EI CAS CSCD 北大核心 2024年第5期1966-1978,共13页
刀盘刀具是盾构机实现切削功能并保证其顺利推进的主要部件,合适的刀具选型与设计在保证盾构机成功切削大直径钢筋混凝土群桩的过程中至关重要。依托沈阳地铁4号线盾构切桩工程,结合盾构穿越砾砂地层的工程特点以及切削大直径钢筋混凝... 刀盘刀具是盾构机实现切削功能并保证其顺利推进的主要部件,合适的刀具选型与设计在保证盾构机成功切削大直径钢筋混凝土群桩的过程中至关重要。依托沈阳地铁4号线盾构切桩工程,结合盾构穿越砾砂地层的工程特点以及切削大直径钢筋混凝土群桩的工程需求,对刀盘刀具进行选型,采用LS-DYNA软件模拟不同刃宽、刃角及前角的贝壳刀切削钢筋的效果。将分析结果应用于该工程,通过对比切桩前后既有隧道沉降变化规律论证刀具选型设计的合理性,并根据切桩后的贝壳刀磨损规律及盾构机排出钢筋情况,评估刀盘刀具切削效果,从而优化刀盘的刀具布置。研究结果表明:盾构刀盘采用面板+辐条复合式直角刀盘,切桩刀具采用前角-45°零后角、5 mm刃宽、90°刃角的双面刃贝壳刀,可提升盾构切桩效果;盾构切桩过程中既有隧道的变形波动控制在1.1 mm内,切桩完成后既有隧道的最大沉降仅为1.96 mm,未对既有隧道造成明显影响;刀盘布置贝壳刀时,应增加高度为210 mm的贝壳刀数量,尤其需要避免单个辐条上仅有1把高度为210 mm贝壳刀的情况,可有效提高刀盘刀具切削钢筋的能力并降低崩刃风险。刀具选型设计结果成功应用于沈阳地铁4号线切桩工程,可为今后类似工程提供参考。 展开更多
关键词 盾构隧道 直接切桩 大直径群桩 刀具设计 沉降监测
下载PDF
双线大直径输水隧道建设对既有桥梁及桩基的影响分析
16
作者 杨杰 张帅超 +2 位作者 马春辉 秦全乐 周永林 《水资源与水工程学报》 CSCD 北大核心 2024年第3期154-163,172,共11页
为准确分析双线大直径输水隧道下穿对既有桥梁结构的影响,构建桥梁-地层-桩基-盾构隧道高精度数值仿真模型,对桥梁桩基结构及盾构过程进行精细化模拟,结合基于智能算法的土层参数反演模型,获取更接近真实情况的土层参数,以提高数值模拟... 为准确分析双线大直径输水隧道下穿对既有桥梁结构的影响,构建桥梁-地层-桩基-盾构隧道高精度数值仿真模型,对桥梁桩基结构及盾构过程进行精细化模拟,结合基于智能算法的土层参数反演模型,获取更接近真实情况的土层参数,以提高数值模拟精度。结果表明:输水隧道盾构开挖引起的地表最大沉降量为15.01 mm,基于反演的地表变形计算结果与实际监测值的误差减少约70%;盾构隧道双线开挖会引起地表二次沉降变形,两条盾构隧道中间区域的地表二次沉降量最大,约占总沉降量的60%,最大二次沉降量为5.06 mm;隧道两侧的桩基受到影响较大,最大位移为10.03 mm,位于桩基顶部,而隧道开挖对桩基内应力分布影响较小,可以认为无影响。 展开更多
关键词 输水隧道 桥梁 桩基响应 反演模型 大直径盾构 变形监测
下载PDF
震陷土层变化下变截面单、群桩动力响应差异
17
作者 冯忠居 王伟 +3 位作者 张聪 朱继新 王逸然 孟莹莹 《上海交通大学学报》 EI CAS CSCD 北大核心 2024年第7期1086-1096,共11页
为研究地震动作用下震陷土层厚度不同时大直径变截面单桩与群桩基础的动力响应差异,依托厦门第二东通道翔安大桥,通过振动台模型试验,开展震陷土层厚度30、40、50 cm时,单桩与群桩基础桩周土震陷量、桩顶水平位移、桩身加速度及弯矩动... 为研究地震动作用下震陷土层厚度不同时大直径变截面单桩与群桩基础的动力响应差异,依托厦门第二东通道翔安大桥,通过振动台模型试验,开展震陷土层厚度30、40、50 cm时,单桩与群桩基础桩周土震陷量、桩顶水平位移、桩身加速度及弯矩动力响应差异研究.结果表明:随着震陷层厚度增大,单桩与群桩基础桩周土震陷量、桩顶水平位移、桩身加速度及弯矩均逐渐增大,且加速度及弯矩在变截面处突变;同一震陷层厚度下,群桩基础桩周土震陷量较单桩大,但群桩基础加速度、桩顶水平位移及桩身弯矩均小于单桩.震陷场地桩基础设计时,应着重考虑变截面单桩与群桩动力响应差异,保证桩基础抗震性能. 展开更多
关键词 桥梁工程 大直径变截面桩 震陷土层 振动台试验 动力响应差异
下载PDF
武汉协和医院质子医学中心结构设计及关键问题
18
作者 陈晓强 肖明 +5 位作者 李宏胜 陈俊 陈元坤 任艺 罗志杨 刘峪菲 《建筑结构》 北大核心 2024年第17期105-111,104,共8页
武汉协和医院质子医学中心的建设对结构专业设计提出了特殊要求。详细介绍了项目概况、设计条件,阐述了基础与地下室以及上部结构的设计要点,包括桩基选型、结构分缝、结构方案、大跨等特殊部位处理方法等。针对质子区结构设计,重点论... 武汉协和医院质子医学中心的建设对结构专业设计提出了特殊要求。详细介绍了项目概况、设计条件,阐述了基础与地下室以及上部结构的设计要点,包括桩基选型、结构分缝、结构方案、大跨等特殊部位处理方法等。针对质子区结构设计,重点论述了沉降控制、振动控制、辐射防护、吊装孔设计等关键问题。设计时通过合理设置结构缝、优化桩基础设计、采用大厚度墙板和重密度混凝土、设计特殊预制梁等措施,较好地解决了上述问题;并运用环境调研、数值模拟、现场实测等方法,取得了良好的效果;结构设计能够满足质子医院的建筑功能需求和特殊工艺要求。 展开更多
关键词 质子医学中心 桩基选型 结构分缝 大跨结构 沉降控制 振动控制 辐射防护
下载PDF
高耐久性大管桩混凝土配制技术与应用
19
作者 王成启 张兆民 《水运工程》 2024年第10期27-32,共6页
为了提高大管桩混凝土的耐久性,开展高耐久性大管桩混凝土配制技术试验研究与应用。在传统大管桩混凝土配合比的基础上,采用矿渣粉改善混凝土的性能,通过复掺矿渣粉与硬石膏保证大管桩混凝土的脱模强度,对各配合比的混凝土进行维勃稠度... 为了提高大管桩混凝土的耐久性,开展高耐久性大管桩混凝土配制技术试验研究与应用。在传统大管桩混凝土配合比的基础上,采用矿渣粉改善混凝土的性能,通过复掺矿渣粉与硬石膏保证大管桩混凝土的脱模强度,对各配合比的混凝土进行维勃稠度、抗压强度、电通量和扩散系数试验,并采用室内试验确定的混凝土配合比进行生产应用。结果表明,单掺矿渣粉明显改善了大管桩混凝土耐久性,但会导致大管桩脱模强度降低;采用石膏粉和矿渣粉复合可明显提升大管桩混凝土脱模强度,并具有良好的耐久性。采用高耐久性大管桩混凝土配合比生产的大管桩管节外观质量良好,混凝土抗压强度等级达到C70,电通量小于800 C,具有较高的耐久性。 展开更多
关键词 高耐久性 大管桩 脱模强度 电通量
下载PDF
大倾角钢箱提篮拱桥总体设计
20
作者 陈楚龙 吴晓勤 +1 位作者 刘新华 朱玉 《世界桥梁》 北大核心 2024年第1期13-18,共6页
考虑施工技术、经济性和景观效果等方面,陕西蔡家坡渭河特大桥主桥采用(35+210+35) m大倾角钢箱提篮拱桥。该桥采用摩擦摆和环向钢丝绳阻尼支座综合减隔震约束体系,以降低结构的地震响应。拱肋为单室等宽钢箱截面,采用主、副拱肋2条悬链... 考虑施工技术、经济性和景观效果等方面,陕西蔡家坡渭河特大桥主桥采用(35+210+35) m大倾角钢箱提篮拱桥。该桥采用摩擦摆和环向钢丝绳阻尼支座综合减隔震约束体系,以降低结构的地震响应。拱肋为单室等宽钢箱截面,采用主、副拱肋2条悬链线,主、副拱肋共面,设计为横向内倾20°的大倾角,在提高桥梁景观效果的同时,又有效提高了结构的整体稳定性;拱肋设钢-混结合段连接拱脚与混凝土拱座。桥面系采用自重较轻的正交异性钢桥面板结构。吊杆采用抗拉强度1 860 MPa的环氧柔性钢绞线。基础采用Φ2.5 m的钻孔灌注群桩,以抵抗软弱地质条件下荷载的竖向及水平作用力。该桥总体采用先梁后拱的施工方案。整体及局部有限元分析结果表明,桥梁结构力学性能均满足规范要求,设计安全可靠。 展开更多
关键词 钢箱提篮拱桥 大倾角拱肋 减隔震约束体系 正交异性板 群桩基础 先梁后拱 桥梁设计
下载PDF
上一页 1 2 95 下一页 到第
使用帮助 返回顶部