The cavity formation and propagation process of stress wave from parallel hole cut blasting was simulated with ANSYS/LS-DYNA 3D nonlinear dynamic finite element software. The distribution of element plastic strain, no...The cavity formation and propagation process of stress wave from parallel hole cut blasting was simulated with ANSYS/LS-DYNA 3D nonlinear dynamic finite element software. The distribution of element plastic strain, node velocity, node time-acceleration history and the blasting cartridge volume ratio during the process were analyzed. It was found that the detonation of charged holes would cause the interaction of stress wave with the wall of uncharged holes. Initial rock cracking and displacement to neighboring uncharged holes become the main mechanism of cavity formation in early stage.2008 University of Science and Technology Beijing. All rights reserved.展开更多
Time interval of short delay ignition is an important factor to affect theefficiency of blasting cuts. The motion process of rock pieces in the cut cavity is analyzed, amechanical model to calculate the delay time of ...Time interval of short delay ignition is an important factor to affect theefficiency of blasting cuts. The motion process of rock pieces in the cut cavity is analyzed, amechanical model to calculate the delay time of parallel hole cuts is presented for tunnel blasting,and a theoretical method to determine the volume ratio (the clearage rate) of the rock pieceswithin the cut cavity at different moments is proposed for the blasting cut with an empty hole.Numerical analysis results show that the optimal delay interval is proportional to the boreholedepth. The suggested results are of practical value to the optimal design of the delay interval inmillisecond blasting related to the parallel hole cuts with an empty hole.展开更多
Reducing the blasting vibration is important for blasting excavation in subway tunnel construction.Taking the 3rd bid section of Line 3 of Qingdao subway project as an example,the distance between tunnel vault and gro...Reducing the blasting vibration is important for blasting excavation in subway tunnel construction.Taking the 3rd bid section of Line 3 of Qingdao subway project as an example,the distance between tunnel vault and ground is 5 ~ 8 m.In order to insure the safety of the upper buildings,technologies of parallel cut with large diameter empty hole,one-time initiation and delay by parts,and multiple shallow holes were adopted in the project.The results showed that the maximum value of vertical vibration was limited in the criterion allowance,and the upper buildings were not damaged.Besides,problems were solved that the number of nonel detonator was difficult to meet the requirements of excavating a large cross-section tunnel by blasting,multiple cross-section could’t be initiated simultaneously,and construction efficiency was low,which ensure the construction safety and schedule.展开更多
文摘The cavity formation and propagation process of stress wave from parallel hole cut blasting was simulated with ANSYS/LS-DYNA 3D nonlinear dynamic finite element software. The distribution of element plastic strain, node velocity, node time-acceleration history and the blasting cartridge volume ratio during the process were analyzed. It was found that the detonation of charged holes would cause the interaction of stress wave with the wall of uncharged holes. Initial rock cracking and displacement to neighboring uncharged holes become the main mechanism of cavity formation in early stage.2008 University of Science and Technology Beijing. All rights reserved.
基金This work was financially supported by the National Natural Science Foundation of China (No. 59974019)
文摘Time interval of short delay ignition is an important factor to affect theefficiency of blasting cuts. The motion process of rock pieces in the cut cavity is analyzed, amechanical model to calculate the delay time of parallel hole cuts is presented for tunnel blasting,and a theoretical method to determine the volume ratio (the clearage rate) of the rock pieceswithin the cut cavity at different moments is proposed for the blasting cut with an empty hole.Numerical analysis results show that the optimal delay interval is proportional to the boreholedepth. The suggested results are of practical value to the optimal design of the delay interval inmillisecond blasting related to the parallel hole cuts with an empty hole.
文摘Reducing the blasting vibration is important for blasting excavation in subway tunnel construction.Taking the 3rd bid section of Line 3 of Qingdao subway project as an example,the distance between tunnel vault and ground is 5 ~ 8 m.In order to insure the safety of the upper buildings,technologies of parallel cut with large diameter empty hole,one-time initiation and delay by parts,and multiple shallow holes were adopted in the project.The results showed that the maximum value of vertical vibration was limited in the criterion allowance,and the upper buildings were not damaged.Besides,problems were solved that the number of nonel detonator was difficult to meet the requirements of excavating a large cross-section tunnel by blasting,multiple cross-section could’t be initiated simultaneously,and construction efficiency was low,which ensure the construction safety and schedule.