When the installation of cables and pipelines needs to go across rivers,bridges are usually adopted to support the cables and pipelines for crossing the rivers.The measure can make full use of the space resources and ...When the installation of cables and pipelines needs to go across rivers,bridges are usually adopted to support the cables and pipelines for crossing the rivers.The measure can make full use of the space resources and have no effect on the flow pattern of rivers.For this reason,analysis on the structural-type design of a large-span steel truss bridge specially used for cables has been performed.The numerical results indicate that the stayed-cable bridge with steel truss beam and concrete main tower has better performance and improved structural type caparisoned with that of the beam and arch bridges,and the construction of the major beam can be without the temporary support.展开更多
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de...Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.展开更多
文摘When the installation of cables and pipelines needs to go across rivers,bridges are usually adopted to support the cables and pipelines for crossing the rivers.The measure can make full use of the space resources and have no effect on the flow pattern of rivers.For this reason,analysis on the structural-type design of a large-span steel truss bridge specially used for cables has been performed.The numerical results indicate that the stayed-cable bridge with steel truss beam and concrete main tower has better performance and improved structural type caparisoned with that of the beam and arch bridges,and the construction of the major beam can be without the temporary support.
文摘Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.