The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the ...The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to project design and construction and have raised a wide range of concerns in the fields of rock mechanics and engineering. During the excavation of underground caverns, high in-situ stress and relatively low rock mass strength in combination with large excavation dimensions lead to large deformation of the surrounding rock mass and support. Existing experiences in excavation and support cannot deal with the large deformation of rock mass effectively, and further studies are needed. In this paper, the geological conditions, layout of caverns, and design of excavation and support are first introduced, and then detailed analyses of deformation and failure characteristics of rocks are presented. Based on this, the mechanisms of deformation and failure are discussed, and the support adjustments for controlling rock large deformation and subsequent excavation procedures are proposed. Finally, the effectiveness of support and excavation adjustments to maintain the stability of the rock mass is verified. The measures for controlling the large deformation of surrounding rocks enrich the practical experiences related to the design and construction of large underground openings, and the construction of caverns in the Jinping I hydropower station provides a good case study of large-scale excavation in highly stressed ground with complex geological structures, as well as a reference case for research on rock mechanics.展开更多
Characters of head of low head pump station and the pump shaft power areanalyzed. Influence of each single factor on pump shaft power is expressed as change of specificshaft power. (non-dimensional) and the probabilit...Characters of head of low head pump station and the pump shaft power areanalyzed. Influence of each single factor on pump shaft power is expressed as change of specificshaft power. (non-dimensional) and the probability density function is determined. Influences ofmultiple factors on pump shaft power are analyzed. Method of calculating none over-loadedprobability of motor by integration by successive reductions is put forward and then relationbetween power spare coefficient and none over-loaded reliability of electric motor is established.Influences of all factors on pump shaft power being considered completely; power spare coefficientsof motor are calculated in three kinds of heads (changing and unchanging), two kinds of dirty-outconditions. Electrical motor power spare coefficients should be chosen as 1.20 approx 1.44, 1.11approx 1.19, 1.09 approx.14 respectively when pump heads are 4, 7, 9.5 m. The results mean much toreasonable choose of electrical motors in large pump stations, increasing reliability of pump unitsand saving equipment investment.展开更多
On March 31, in accordance with the typical design requirements of the State Grid, the f irst large electric vehicle (EV) charging station, built by the North China Grid,
By means of the analysis of the internal flow within inlet passage of large pumping sta-tion, an analysis of 3-D direct boundary element for the flow has been presented on the potentialflow assumption, and a calculati...By means of the analysis of the internal flow within inlet passage of large pumping sta-tion, an analysis of 3-D direct boundary element for the flow has been presented on the potentialflow assumption, and a calculation and an experimental proof for the inlet passage of 30 angle-type axial pumping station have been made. Based on the analysis of the calculations and theexperiments, the calculation method is feasible and believable.展开更多
文摘The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to project design and construction and have raised a wide range of concerns in the fields of rock mechanics and engineering. During the excavation of underground caverns, high in-situ stress and relatively low rock mass strength in combination with large excavation dimensions lead to large deformation of the surrounding rock mass and support. Existing experiences in excavation and support cannot deal with the large deformation of rock mass effectively, and further studies are needed. In this paper, the geological conditions, layout of caverns, and design of excavation and support are first introduced, and then detailed analyses of deformation and failure characteristics of rocks are presented. Based on this, the mechanisms of deformation and failure are discussed, and the support adjustments for controlling rock large deformation and subsequent excavation procedures are proposed. Finally, the effectiveness of support and excavation adjustments to maintain the stability of the rock mass is verified. The measures for controlling the large deformation of surrounding rocks enrich the practical experiences related to the design and construction of large underground openings, and the construction of caverns in the Jinping I hydropower station provides a good case study of large-scale excavation in highly stressed ground with complex geological structures, as well as a reference case for research on rock mechanics.
文摘Characters of head of low head pump station and the pump shaft power areanalyzed. Influence of each single factor on pump shaft power is expressed as change of specificshaft power. (non-dimensional) and the probability density function is determined. Influences ofmultiple factors on pump shaft power are analyzed. Method of calculating none over-loadedprobability of motor by integration by successive reductions is put forward and then relationbetween power spare coefficient and none over-loaded reliability of electric motor is established.Influences of all factors on pump shaft power being considered completely; power spare coefficientsof motor are calculated in three kinds of heads (changing and unchanging), two kinds of dirty-outconditions. Electrical motor power spare coefficients should be chosen as 1.20 approx 1.44, 1.11approx 1.19, 1.09 approx.14 respectively when pump heads are 4, 7, 9.5 m. The results mean much toreasonable choose of electrical motors in large pump stations, increasing reliability of pump unitsand saving equipment investment.
文摘On March 31, in accordance with the typical design requirements of the State Grid, the f irst large electric vehicle (EV) charging station, built by the North China Grid,
文摘By means of the analysis of the internal flow within inlet passage of large pumping sta-tion, an analysis of 3-D direct boundary element for the flow has been presented on the potentialflow assumption, and a calculation and an experimental proof for the inlet passage of 30 angle-type axial pumping station have been made. Based on the analysis of the calculations and theexperiments, the calculation method is feasible and believable.