On February 25, the Unit 1 of Ling’ao Nuclear Power Plant phase II underwent a 41-day-long hot functional test successfully with its major systems satisfying the requirements for
This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting proc...This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting processes. The method is based on the integration of complementary through, the extension theory of matter-element model and neural network theory combine to overcome a neural network to learn shelters, and other defects. The purpose of this paper is to provide the better running and commissioning experience for the similar emergency generator unit.展开更多
The paper expresses the view that China's essential way out for developing nuclear power lies in localization of manu facture, based on her technical level and capability in designing and manufacturing nuclear pow...The paper expresses the view that China's essential way out for developing nuclear power lies in localization of manu facture, based on her technical level and capability in designing and manufacturing nuclear power equipment. Moreover, the paper opines that domestically manufactured nuclear power equipment has a certain competitive potential with respect to quality and price, the crux lying in the neces sity of reforming the management system of nuclear power.展开更多
Today, the most urgent problem of the existing and future nuclear power industry is to ensure the nuclear and environmental safety of the operation of nuclear power reactor units (NPPs) and nuclear power plants (NPPs)...Today, the most urgent problem of the existing and future nuclear power industry is to ensure the nuclear and environmental safety of the operation of nuclear power reactor units (NPPs) and nuclear power plants (NPPs). It is solved thanks to the application of deeply echeloned protection and an anti-accident complex of methods and means for effective control of the operation of active reactor zones (AZR). However, the danger of existing NPPs in the world from time to time manifests itself in the form of severe post-project accidents and catastrophes with the release into the environment of a significant amount of radioactive materials dangerous for all living things. The results of the analysis show that the unconditional fulfillment of the main requirements of nuclear environmental safety and biocompatibility is possible only in the so-called wave nuclear reactor of the G-V generation, which, unlike reactors of the previous generations III, II+ and IV, does not require supercritical loading of the core with nuclear fuel. In the active zone of this reactor, nuclear-physical processes governed by physical law are implemented, which exclude the operator’s participation in regulating the reactivity of the reactor’s active zone, which makes it the reactor with the highest level of nuclear and environmental safety today, which is based on the principles of so-called internal safety, free from the human factor. The possibility of burning nuclear fuel based on U238 and Th232 in it expands the reserves of energetic nuclear fuel almost to inexhaustibility. The technology of nuclear reactors of the G5 generation through the secondary use of spent irradiated nuclear fuel (SNF) for the production of energy and energy raw materials with simultaneous burning of it to an environmentally safe state is able to quickly reduce the available stocks and further production of dangerous SNF, guarantee the nuclear and environmental safety of NPPs with reactors G5 and to technologically make nuclear post-project accidents and disasters impossible at the level of physical law with the complete elimination of the human factor.展开更多
在风-火-核-碳捕集多源联合系统中,核电机组在参与电网调峰时存在调峰深度选择不精确的问题。此外,该多源联合系统还存在风电消纳不足的问题。为此,构建了一种计及线性化核电机组调峰深度模型的电转气(power to gas,P2G)-风-火-核-碳捕...在风-火-核-碳捕集多源联合系统中,核电机组在参与电网调峰时存在调峰深度选择不精确的问题。此外,该多源联合系统还存在风电消纳不足的问题。为此,构建了一种计及线性化核电机组调峰深度模型的电转气(power to gas,P2G)-风-火-核-碳捕集多源联合系统,并对该系统进行了日前优化调度。首先,基于核电机组负荷跟踪模式,通过引入连续变量,提高了调峰深度选择的准确性;然后,分析了碳捕集电厂-P2G联合运行模式及需求响应资源对促进风电消纳的积极作用;最后,以系统综合运行成本最低为目标函数,同时考虑碳交易机制,在Matlab平台搭建仿真模型,验证了所构建多源联合系统的有效性。结果表明,相较于核电机组采用固定调峰档位的多源联合系统,所构建的多源联合系统能够在保证核电机组安全稳定运行的同时,实现风电完全消纳,系统碳排放量与综合运行成本分别下降了13.74%与6.27%,提高了系统运行的低碳性与经济性。展开更多
文摘On February 25, the Unit 1 of Ling’ao Nuclear Power Plant phase II underwent a 41-day-long hot functional test successfully with its major systems satisfying the requirements for
文摘This paper introduces an applicable test plan for emergency diesel generator in nuclear power plant. It advances improvement approaches with problems found during field commissioning test and its trouble-shooting processes. The method is based on the integration of complementary through, the extension theory of matter-element model and neural network theory combine to overcome a neural network to learn shelters, and other defects. The purpose of this paper is to provide the better running and commissioning experience for the similar emergency generator unit.
文摘The paper expresses the view that China's essential way out for developing nuclear power lies in localization of manu facture, based on her technical level and capability in designing and manufacturing nuclear power equipment. Moreover, the paper opines that domestically manufactured nuclear power equipment has a certain competitive potential with respect to quality and price, the crux lying in the neces sity of reforming the management system of nuclear power.
文摘Today, the most urgent problem of the existing and future nuclear power industry is to ensure the nuclear and environmental safety of the operation of nuclear power reactor units (NPPs) and nuclear power plants (NPPs). It is solved thanks to the application of deeply echeloned protection and an anti-accident complex of methods and means for effective control of the operation of active reactor zones (AZR). However, the danger of existing NPPs in the world from time to time manifests itself in the form of severe post-project accidents and catastrophes with the release into the environment of a significant amount of radioactive materials dangerous for all living things. The results of the analysis show that the unconditional fulfillment of the main requirements of nuclear environmental safety and biocompatibility is possible only in the so-called wave nuclear reactor of the G-V generation, which, unlike reactors of the previous generations III, II+ and IV, does not require supercritical loading of the core with nuclear fuel. In the active zone of this reactor, nuclear-physical processes governed by physical law are implemented, which exclude the operator’s participation in regulating the reactivity of the reactor’s active zone, which makes it the reactor with the highest level of nuclear and environmental safety today, which is based on the principles of so-called internal safety, free from the human factor. The possibility of burning nuclear fuel based on U238 and Th232 in it expands the reserves of energetic nuclear fuel almost to inexhaustibility. The technology of nuclear reactors of the G5 generation through the secondary use of spent irradiated nuclear fuel (SNF) for the production of energy and energy raw materials with simultaneous burning of it to an environmentally safe state is able to quickly reduce the available stocks and further production of dangerous SNF, guarantee the nuclear and environmental safety of NPPs with reactors G5 and to technologically make nuclear post-project accidents and disasters impossible at the level of physical law with the complete elimination of the human factor.
文摘在风-火-核-碳捕集多源联合系统中,核电机组在参与电网调峰时存在调峰深度选择不精确的问题。此外,该多源联合系统还存在风电消纳不足的问题。为此,构建了一种计及线性化核电机组调峰深度模型的电转气(power to gas,P2G)-风-火-核-碳捕集多源联合系统,并对该系统进行了日前优化调度。首先,基于核电机组负荷跟踪模式,通过引入连续变量,提高了调峰深度选择的准确性;然后,分析了碳捕集电厂-P2G联合运行模式及需求响应资源对促进风电消纳的积极作用;最后,以系统综合运行成本最低为目标函数,同时考虑碳交易机制,在Matlab平台搭建仿真模型,验证了所构建多源联合系统的有效性。结果表明,相较于核电机组采用固定调峰档位的多源联合系统,所构建的多源联合系统能够在保证核电机组安全稳定运行的同时,实现风电完全消纳,系统碳排放量与综合运行成本分别下降了13.74%与6.27%,提高了系统运行的低碳性与经济性。